Taking off and ESTIMATING

Slides:



Advertisements
Similar presentations
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
Advertisements

CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
2.2 STRUCTURAL ELEMENT BEAM
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Lesson Measuring Trees.
Measuring Concrete Work
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
E STIMATION 1 Excavation 2 lesson 5. E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation.
Chapter 3 Measuring Excavation and Sitework
Measuring Sitework, Excavation, and Piling
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Slab Design.
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
EM15 – Contractors COST MANAGEMENT
CONSTRUCTING A FIVE CABIN LATRINE
N. PRESTON, M. MARTIN CERT IV ESTIMATING 2012 Part Lesson 4 – Slab on Ground IDENTIFY AND PRODUCE ESTIMATED COSTS FOR PROJECTS.
Three manufacturing costs Direct material cost: Consist of all those material that can be identified with a specific product. Example: wood used in manufacturing.
Calculations On completion of this unit the Learner should be able to demonstrate an understanding of: The formula used to calculate: Areas Volumes Ratios.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Plain & Reinforced Concrete-1 CE-313
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Construction Contracts and Project Delivery Methods
Landscape Business Concepts
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Lecture 2 Introduction to Earthmoving
FORMS, SCAFFOLDING and STAGING
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CE Estimation & Quantity Surveying Prepared by Prof. S.L. DAVID ANANDARAJ.
Specification & Quantities Estimating
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
CE Estimation & Quantity Surveying UNIT – IV VALUATION Prepared by Prof. S.L. DAVID ANANDARAJ.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
Chapter 13 Estimates for Remodeling Work
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Week 6 Timber based columns
Estimating and Scheduling CEE 492
PRESENTATION ON PREPARATION OF ESTIMATE OF BUILDING BY Er
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Quantity Surveying.
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
EXAMPLE A 400 m2 (40 x 10 m) area is to be excavated, 1 m deep, with side slopes 2:1. As the width (10 m) is less than 30 times the depth (30 x 1 m), the.
Do Now: Working only with the people at your table, measure the length, width, and height of the room. DO NOT discuss your results with other groups. Record.
Estimating Project Costs
Container specifications
RIBA Plan of Work 2013.
Costs and Economics of Construction
Drawing Interpretation
ESTIMATION AND COSTING
Construction Project Management
What is the best method for constructing schools in Palestine ?
DO’s and DON’Ts of toilet construction
Awarding Criterion for late tender: the lowest bid- why?
Tree Measuring Mr. Kennedy.
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING Excavation
Building Construction I Sofia Sebastian 1
FBE05 – Mathematics and Statistics
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
DO’s and DON’Ts of toilet construction
DO’s and DON’Ts of toilet construction
RIBA Plan of Work 2013.
Muskat Secondary School Project
Presentation transcript:

Taking off and ESTIMATING PREPARED BY: NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH

ESTIMATING An estimate is a calculation of the quantities of various items of work, and the expenses likely to be incurred there on. The total of these probable expenses to be incurred on the work is known as estimated cost of the work. (close approximation of its actual cost) The agreement of the estimated cost with the actual cost will depend on accurate use of estimating methods and correct visualization of the work, as it will be done. Importance of correct estimating is obvious. Under-estimating may result in the client getting an unpleasant shock when tenders are opened and drastically modifying or abandoning the work at that stage. Over-estimating may lose the engineer or estimator his client or his job, or in any case his confidence. Estimating is the most important of the practical aspects of construction management, and the subject deserves the closest attention of one aspiring to a career in the profession. It is a comparatively simple subject to understand; however, as it brings one up against practical work, methods and procedure, knowledge of it cannot be acquired without close application.

ESTIMATING To give a reasonably accurate idea of the cost An estimate is necessary to give the owner a reasonably accurate idea of the cost to help him decide whether the work can be undertaken as proposed or needs to be curtailed or abandoned, depending upon the availability of funds and prospective direct and indirect benefits. Importance of correct estimating is obvious. Under-estimating may result in the client getting an unpleasant shock when tenders are opened and drastically modifying or abandoning the work at that stage. Over-estimating may lose the engineer or estimator his client or his job, or in any case his confidence. Estimating is the most important of the practical aspects of construction management, and the subject deserves the closest attention of one aspiring to a career in the profession. It is a comparatively simple subject to understand; however, as it brings one up against practical work, methods and procedure, knowledge of it cannot be acquired without close application.

ESTIMATING 1. Estimating Materials From the estimate of a work it is possible to determine what materials and in what quantities will be required for the work so that the arrangements to procure them can be made. 2. Estimating Labor The number and kind of workers of different categories who will have to be employed to complete the work in the specified time can be found out from the estimate. Importance of correct estimating is obvious. Under-estimating may result in the client getting an unpleasant shock when tenders are opened and drastically modifying or abandoning the work at that stage. Over-estimating may lose the engineer or estimator his client or his job, or in any case his confidence. Estimating is the most important of the practical aspects of construction management, and the subject deserves the closest attention of one aspiring to a career in the profession. It is a comparatively simple subject to understand; however, as it brings one up against practical work, methods and procedure, knowledge of it cannot be acquired without close application.

ESTIMATING 3. Estimating Plant An estimate will help in determining amount and kind of equipment needed to complete the work. 4. Estimating Time The estimate of a work and the past experience enable one to estimate quite closely the length of time required to complete an item of work or the work as a whole. Whereas the importance of knowing the probable cost needs no emphasis, estimating materials, labor, plant and time is immensely useful in planning and execution of any work. Importance of correct estimating is obvious. Under-estimating may result in the client getting an unpleasant shock when tenders are opened and drastically modifying or abandoning the work at that stage. Over-estimating may lose the engineer or estimator his client or his job, or in any case his confidence. Estimating is the most important of the practical aspects of construction management, and the subject deserves the closest attention of one aspiring to a career in the profession. It is a comparatively simple subject to understand; however, as it brings one up against practical work, methods and procedure, knowledge of it cannot be acquired without close application.

METHODS AND MEASURING UNITS A process of evaluating items from prepared working drawing n noting in the BOQ form. This evaluation is to obtain the items quantity in specific unit.

METHODS AND MEASURING UNITS Method of measuring are; i) linear ii) area iii) volume iv) weight v) number

Methods : Linear Multiple items measured linearly Measure items with fixed cross section Estimate item price based on linear item’s measurement such as length of pipe, length iof strip foundation and length of external wall of a building Unit : metre ( m)

Methods : Area Measure item such as pavement surface, plaster, brick wall, site clearing, formwork and so on Measurement that is required to record are length and width, width and depth @ length and height. Unit : squre metre ( m2)

Methods : Volume Involve item such as soil excavation for foundation, concreting for beam, slab and others Sides measurement are length, width and depth for item with three surfaces Structures like pyramids, cone, spherical and cylindrical require measurement based on mathematical formula to calculate volume. Unit : cubic metre ( m3)

Methods : Weight Applied when item estimated is based on weight Applied for item such as reinforcement steel placed in the reinforced concrete structure Unit : kilogram to metric tonne ( kg to tonne)

Methods : Number Applied for complex item where it is difficult to divide into small component and to estimate the price of each component. Those items include electrical wiring such as lighting socket, fan point , door, window and precast concrete Unit : Number ( No)

Methods : weight measurement Type of reinforcement Hook (h) Bend (n) Symbol Mild steel 12 d 8 d R or M.S High- yield steel 15 d 9.5 d Y or H.Y Table : Reinforcement steel measurement linear method Diameter of reinforcement kg/m 10 0.616 12 0.888 16 1.579 20 2.466 25 3.854 32 6.303 Table : Example of weight measurement of reinforcement

TYPES OF COST Item’s cost is divided into: i) material cost ii) Labour cost iii) plant and equipment costs iv) overhead cost and profit

TYPES OF COST i) Material cost - Material cost such as brick, roof tile, glass and iron - Estimated price depend on the latest marker price and location of site.

TYPES OF COST ii) Labour cost - A fee or wages to the workers after work has been completed. - Two classes of workers are; a. skilled worker b. general worker - The determination of fee depends on the labour constant

TYPES OF COST iii) Plant and equipment costs - Plant and equipment important to execute work effectively and quickly. - Two types; a. non machinery plant and equipment; ladder n wheel barrow b. machinery plant and equipment; lorry, bulldozer n concrete mixer

TYPES OF COST iv) overhead and profit cost Include various type of payment related to the company’s management; a. salary of management personnel b. cost and office equipment depreciation cost c. allowances for company’s board of directors

METHODS OF ESTIMATING There are 5 methods of preparing estimation for construction project; i) Volume ii) Floor area iii) Evaluation iv) Approximate value quantities v) Bills of quantities

METHODS OF ESTIMATING - volume - Based on the building length, width and height - The construction cost of the proposed building is the product of the volume of the proposed building and the cost rate per cubic meter

METHODS OF ESTIMATING - floor area - Determined by multiplying the floor length to width ( measured from outer wall of the building) - Construction cost of the new building = x - Only considers the construction cost of the building. - Other construction work such as fence, road, drain and landscape are not included. Area of the new building the cost rate per cubic metre of the existing building

METHODS OF ESTIMATING - Evaluation Carried out by counting the number of furniture, tools @ number of occupants. For example, the unit to be calculated in construction of school is the number of chairs. Every unit of the furniture is given the cost per unit based on the cost from the existing building. Estimated cost = Cost per unit x Number of the furniture for proposed building

METHODS OF ESTIMATING - approximate value quantities Almost similar to the bills of quantities method Carried out by identifying items, calculating quantity and calculating the item’s gross cost based on the working drawing. Calculating cost are based on excavation work and concreting work.

BILL OF QUANTITIES METHOD A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.

BILL OF QUANTITIES METHOD It also (ideally) details the terms and conditions of the construction or repair contract and itemises all work to enable a contractor to price the work for which he or she is bidding.

BILL OF QUANTITIES METHOD Most accurate method compared to the others method QS take off accurately the quantity of measured items from the working drawing

BILL OF QUANTITIES METHOD Step in preparing ; 1. interpreting drawing 2. dimensioning and taking off the quantities 3. grouping of quantities 4. estimating cost

BILL OF QUANTITIES METHOD Dimensioning and taking off quantities is a process of taking dimension, adding up and multiplying the items dimension. Use the quantity measurement form - consist 2 parts - each part contains 4 column - they are multiplying, dimensions, total and work description columns.

Dimensioning and taking off quantitIES - DIMENSION FORM C B DIMENSION DESCRIPTION Record the number to be multiplied based on the number of repeated item Record the dimension of items Record the total measurement of linear, area, volume and number of items Record the description operation of the measured items briefly n accurately

Area measurement Topsoil excavation 100 mm thick beginning from the ground level with 14.60 length and 12.60 width Topsoil excavation 100 mm thick beginning from the ground level 183.96 mm2 183.96 14.60 12.60 2.50 100 mm x 50 mm thick sawn and treated timber for roof rafter 2.50 m DIMENSION DESCRIPTION Linear measurement 100 mm x 50 mm of thick sawn and treated timber for a 2.5 m long roof rafter

the weight of steel reinforcement of 7m long with a diameter of 32 mm Weight measurement the weight of steel reinforcement of 7m long with a diameter of 32 mm 32 mm in diameter mild steel reinforcement in column x 6.303 kg/m = 44.191 kg 7 22.02 22.0 0.70 1.30 excavating trench not exceeding 1.5 m deep 22.02 m3 DIMENSION DESCRIPTION iii) Volume measurement excavating trench not exceeding 1.5 m deep of 22.0 long, 0.70 wide and 1.3 deep

Number measurement 5 number of ceiling fans Ceiling fan as described in the specification DIMENSION DESCRIPTION Number measurement 5 number of ceiling fans

ABSTRACTING Abstracting quantities is carried out by abstracting Transfer all measurement and work descriptions from the dimension form to abstract form Purpose of abstracting – to divide and group all particulars and work descriptions according to subheading and the quantities are rounded up

ABSTRACTING Trench excavation for strip foundation beginning from the prepared level, not exceeding 1.50 m deep; backfilling the soil and compacting it; transporting and dumping surplus soil at an average distance of 50 m from the site. Unit ( m3) page ( from the dimension form) 22.20 1 22.20 22 m3 ( rounded up to the nearest whole number)

ESTIMATING COST When abstracting work is completed, the work description, unit and work quantities are recorded in the bills of quantities form top estimate the cost.

ESTIMATING COST PROJECT : RM Sen A Item Description of work Unit Quantity Rate Total RM Sen A Trench excavation for strip foundation beginning from the prepared level, nor exceeding 1.5 m deep; backfilling the soil and compacting it; transporting and dumping surplus soil at an average distance of 50 m from the site. m3 22