Phoenix Rising: Resurrecting the Suspended Project David Ericksen Severson & Werson March 25, 2015.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Contracts – important issues
Let’s Study Legal English Together!
1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
Article XXXVI – Signature, ratification, acceptance, approval or accession 1. – This Protocol shall be open for signature in Berlin on 9 March 2012 by.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
IMPORTANT READ CAREFULLY BEFORE USING THIS PRODUCT LICENSE AGREEMENT AND LIMITED WARRANTY BY INSTALLING OR USING THE SOFTWARE, FILES OR OTHER ELECTRONIC.
St. Hugh Catholic School Student iPad Use Liability Agreement.
Maine Center for Disease Control & Prevention Radiation Control Program, Radon Section Radon Section Leader Maine DHHS, Radiation Control Program
Scope of Work Strategies & Solutions David A. Ericksen, Esq. Severson & Werson March 25, 2015.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Time for a new standard - AS General Conditions of Contract
PROJECT DELIVERY SYSTEMS
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
The Camp Audit “Keep your friends close and your auditor closer”
Managing your client risks in difficult times Peter Scott PETER SCOTT CONSULTING.
Release & Deployment ITIL Version 3
Incident Reporting Procedure
Mike Zenker Barclays Capital Research (415) November 12, 2007
Construction Contracts What You Need to Know March 19, 2015.
Middleware Promises Warranties that Don’t Indemnities that Won’t Stephen Rubin, Esquire
Contract Review.  1. The final step in the vendor contracting process should be getting the vendor’s standard written contract and signing the contract.
Overview OTL Mission Inventor Responsibility Stanford Royalty Sharing Disclosure Form Patent View Inventor Agreements Patent.
© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by.
FASB Interpretation No. 48
Omni Circular Key Area #7: New Responsibilities of the Pass- Through Agency By Michael Brustein, Esq. Brustein & Manasevit, PLLC Spring.
Compensation events and claims Presented by Prof. Khem Dallakoti.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Patient Protection and Affordable Care Act March 23, 2010.
Public Procurement Procedure – Bidding Documents
March 17, Open Source Release of NASA Software GSA/GWU Open Source in Government Conference NASA Open Source Legal Team.
Presented by David P. Schack, Partner June 29, 2006 Insurance Coverage For Multi- State Investigations: Can You Get Your Insurer to Pay for.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Reasonable is in Eye of the Beholder Vendor, Customer, & Litigator Perspectives on Software License Provisions Aaron Brodsky Greg Leibold Peter Gergely.
International Telecommunication Union New Delhi, India, December 2011 ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Philip.
NJSPLS The Character and Nature of Claims Against Land Surveyors Ed Pagan, Jr., Esquire Pagan Affiliates LLC Richard N. Hartman.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage Receipts.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage and Disposition Inventory Returns.
State of Georgia Release Management Training
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
An Overview THE AUDIT PROCESS. MAJOR PHASES IN AN AUDIT Client acceptance and retention Establish terms of the engagement Plan the audit Consider internal.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
A risk assessment is the process of identifying potential hazards an organization may face and analyzing methods of response if exposure occurs.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
1 Don’t Let Construction Administration Services Become a Claims Maker Architects and Engineers Professional Liability Workshop.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
PERSONAL SERVICE CONTRACTS MEMORANDUMS OF AGREEMENT PROCESS Amy Monroe, Procurement Teri Mason, Budgets Thelma Hawkins, Grants Management Karen Wirth,
Disclaimer This presentation is intended only for use by Tulane University faculty, staff, and students. No copy or use of this presentation should occur.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
October 2012 Admission of professional participants – non-credit institutions to trading on the Moscow Exchange FX market.
The secure site rendering issue (all navigation crushed together as a list at the top of the page) is a compatibility issue with Internet Explorer only.
1 HIPAA’s Impact on Depository Financial Institutions 2 nd National Medical Banking Institute Rick Morrison, CEO Remettra, Inc.
Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Oracle Proprietary and Confidential. 1.
Article 4 [Obligations of Applicant] 4.1. As a sole and exclusive owner of the Application, Applicant warrants that.
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
Payments in the Digital age
LATIHAN MID SEMINAR AUDIT hiday.
The Importance of Subrecipient Monitoring
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Communication and Consultation with Interested Parties by the RB
Find the Problems with the Provisions May 11, 2016 Presented By:
Operationalizing Export Certification and Regionalization Programmes
TITLE Source: Footnotes:. TITLE Source: Footnotes:
© 2013 Sri U-Thong Limited. All rights reserved
Presentation transcript:

Phoenix Rising: Resurrecting the Suspended Project David Ericksen Severson & Werson March 25, 2015

Real World Realities Ritz Carlton in Rancho Mirage 224 Unit Luxury Hotel & Spa Financed by Goldman Sachs Suspended in 2008 at 70% complete - $60M to go Public Private Partnership Bought in foreclosure in 2010 Resumed construction in 2012 Scheduled for opening in March 2014

The Rancho Mirage Worries New Owner/New Objectives New Codes/Requirements Integrity of Existing Design – Technology – Products – Standards Status of Abandoned Work New Financing Model

The Public Extension of Suspension December 2008 State of California suspended 2,000+ infrastructure projects already underway. -Roads-Schools -Housing-Levees -Bridges-Water treatment We have since had the “fiscal cliffs” & “sequestration”.

Ohio, March ,780-square-foot, Senior Living Facility approved in 2007, abandoned in 2009 due to financial issues. Building about 30 percent completed and "is at the structural steel framing stage, with most of the foundation complete; the second and third floor metal floor decking has been installed; and the concrete has been poured over the decking on portions of the second floor.“ Original plan - 83 beds. Now adding 37 beds and reducing size by 5,000+ sq. ft. Once investigation into the safety of the site is completed, developer must get a new building permit from the City before beginning construction. Will take 24 months to complete.

Idaho Idaho Statesman: July 9, 2014 Bracing for a possible stoppage in federal funding, ITD in mid-May temporarily suspended bidding for future projects. ITD resumed advertising for bids on Tuesday after the U.S. Department of Transportation said last week that it would start reducing payments to states for road and transit projects starting Aug. 1.

Poll No. 1 How many projects have you had suspended in the last three years? ____0 ____1-5 ____5-20 ____20+

Poll No. 2 Of those projects suspended, how many have or will come back? ____0-25% ____25-50% ____50%+ ____N/A

Agenda Realities & Dynamics of Suspended Projects Roles & Risks for Design Professionals in Resurrected Projects Core Concerns for Project Suspension & Restarts Role-Specific Issues, Strategies, & Tools for Success in Resumption of Project

Learning Objectives Understand the Frequency & Dynamics of Project Suspensions and Restarts Identify the Core Concerns for Any Design Professional on Any Project Restart Distinguish the Three Common Roles for Design Professionals in Project Restarts Develop the Strategies & Tools to Manage Risk & Succeed in a Project Restart

The Suspended Surveys AIA Study of % of Firms have One or More Suspended Projects 60% of Suspensions Due to Financing Half in Projects Below $5M Two-thirds New Construction Through 2011, 40% “resumed” within three years (McGraw Hill)

Cause & Effect

Size & Type

Sector

Lessons from the Data At best, only about 50% of projects likely to restart. Impacts a wide range of project sizes and types. Those projects that do restart, often do so with different: – Parties – Programs – Priorities

Roles, Risks, & Responsibilities Suspended Departing Resuming Succeeding

Poll No. 3 When a project is suspended, your greatest concern is: ____Getting Paid ____Intellectual Property Rights ____Preserving Project Status ____Litigation/Claims ____Other

Suspension Issues & Risks Fee Intellectual Property Rights Lapses in Permits, Licenses, Entitlements Changes in Codes, Products, Pricing Expectations & Risk Exposure Assignment

The Suspended Design Professional Core Tools & Procedures Fee Intellectual Property Document the Incomplete Status and Pending Issues

Suspension Strategies Fee: – Affirmatively assert right to demand fee be brought current. – Assess and implement any statutory lien or notice procedures. – Simply waiting risks loss of rights by lien, statute of limitation, and financing.

Suspension Strategies Intellectual Property Rights: Reassert copyright with explanation. Consider revoking licenses. Consider demand for return of work product. Consider notification of permitting and reviewing agencies. Internally identify external recipients of work product.

Suspension Strategies Non-payment precludes right to use documents -AIA B101 §7.3 Upon execution of this Agreement, the Architect grants to the Owner a nonexclusive license to use the Architect’s Instruments of Service solely and exclusively for purposes of constructing, using, maintaining, altering and adding to the Project, provided that the Owner substantially performs its obligations, including prompt payment of all sums when due, under this Agreement.

Suspension Strategies If the Project is suspended for any reason outside the exclusive control of Consultant, Consultant shall have no liability to the Owner or any other party for any associated delay or damage caused the Owner or others because of such suspension of services, and Owner shall release, indemnify, and hold harmless Consultant for any claims associated with such suspension.

Suspension Strategies Communicate & Document the Project History, Status, and Potential Risks: Potential Lapses in Permits, Licenses, Entitlements Potential Changes in Codes, Products, Pricing Potential Impact on Site/Construction Appropriate Expectations & Risk Exposure Assignment to Client

Core Resumption Issues & Risks Party/Participant Changes Programming, Purpose, and Priority Changes Integrity of Project Site or Incomplete Site Activities Lapses in Permits, Licenses, Entitlements Changes in Codes, Regulations, Statutes Changes in Products & Pricing

Poll No. 4 In restarting a suspended project, your greatest concern is: ____Site ____Permits/Codes ____Programming ____Other

Core Resumption Strategies & Tools Parties & Participants – Continuing Players (how have they changed) Capacity: – Technical Qualifications – Availability – Financial Re-establish/update contracts and duties – New Players Capacity Transfer and Documentation of Role & Responsibility (e.g., contract) Knowledge Transfer Process

Core Resumption Strategies & Tools Re-confirm & Update Purpose, Program, Priorities: – Document – Examine and Look for Impacts – Confirm Realistic Expectations & Limitations – Secure Appropriate Fee & Schedule

Core Resumption Strategies & Tools Project Site: – Site changes – Associated changes in community/neighborhood – Secure third-party narrative with right of reliance Code/Statute/Regulation/Entitlement: – Prior Status Assessment/Confirmation – Update Evaluation – Fee & Schedule of Accommodation

The Departing Design Professional Evaluate and reconfirm the steps taken at time of suspension The discretionary tasks for suspension become “compulsory”: – Confirmation of status and lack of responsibility for past or future issues. – Expanded to identify open/unresolved issues. – Requirement that another A/E “of record” be retained and be responsible for all aspects of the project. – Notification of agencies as to project departure. – Steps to secure fee.

The Departing Design Professional Risks & Leverage Key Risk Concerns: -Loss of intellectual property/capital -Loss of fees -Lack of control over project, issues, corrections Leverage Opportunities: -Use of and transfer of rights to work product -Liens Solutions: Exchange for Executed Release & Indemnity

The Departing Design Professional: The Contract Preparation Consultant’s commitments as set forth in this Agreement are based on the expectation that all of the services described in this Agreement will be provided. In the event Client later elects to reduce Consultant’s scope of services, Client agrees to release, hold harmless, defend, and indemnify Consultant from any and all claims, damages, losses, or costs in any way associated with or arising out of such reduction in services.

The Departing Design Professional: The Goodbye Letter You have chosen to proceed with the Project without Firm ABC. To proceed with the project in any way, you can, should, and must retain another consultant who shall have sole and complete responsibility for the Project. Accordingly, Firm ABC shall have no further responsibility for the Project or the interpretation, modification, or completion of any issue related to the Project, since such issues can and do change over time and as a project proceeds. All such issues shall be solely your responsibility going forward.

The Continuing Design Professional: The Core Concern You don’t know what you don’t know!

The Continuing Design Professional: Key Strategies Follow the “core strategies” set forth above. Document and communicate client information as to changed conditions & issues. Clearly identify scope for investigation and update. Establish adequate fee and schedule. Establish right to rely and potential for change.

The Continuing Design Professional By Contract Addendum or Notification Documented Disclaimers, Expectations & Rights: Suspended projects may change in many ways due to the passage of time, changes in the site or environment, regulatory modifications, and other issues outside Consultant’s control. Consultant is not and shall not be responsible for any such changes, except to the extent it has expressly assumed such responsibility or otherwise becomes aware of such issues. Consultant may rely on information received from client or others regarding such issues.

Resumption Process & Actions Immediate Project Assessment – Client – Team – Building Officials – Site Project Status Plan of Action Report & Communicate in Writing w/ Caveats Project, Fee, and Schedule Modifications Amendment

Poll No. 5 How many times have you replaced another design professional as the “professional of record”? ____Never ____1-5 ____5-20 ____20+

The Successor Design Professional: The Key Concern Reliance others and the client expectation of a seamless transition (translated: expense-free with no schedule impact). This is not fair, realistic, or wise.

The Successor Design Professional: Pitfall Number One Intellectual Property Rights in the Existing Design: -Responsibility for rights in the work product should be solely the client’s responsibility and liability. -Confirm in contract. -Consider written notification to prior professional as to use, objections, and concerns.

The Successor Design Professional: Pitfall Number Two Reliance on and Responsibility for the Existing Design: -Clearly establish and document point of transition. -Clearly establish right of reliance or responsibility for review. -Contact predecessor for identification of status & issues. -Review standards for licensing compliance, and establish process & documentation for compliance.

The Successor Design Professional: The Stamping Standard The architect has exercised the same judgment and responsibility in reviewing all stages of the design documents and other phases of the work as required by law, and which would normally be exercised if he/she personally performed the required tasks. (California Code of Regulations, Title 16 CRC §151(2).) (Emphasis added.)

The Successor Design Professional: Strategies & Solutions CONTRACT: Client represents that it has all rights and licenses necessary to proceed with the Project based on incorporating the work product of all design professionals and consultants at any time associated with the Project. In the event of any dispute or claim as to the right to use such work product or claims associated with alleged violations of copyright interests, Client shall defend, indemnify, and hold harmless Consultant from any and all such claims, losses, damages, or costs including, but not limited to, attorneys’ fees.

The Successor Design Professional: Strategies & Solutions CORRESPONDENCE: We have been retained by Client ABC to provide services relative to the Beta Project. We are informed that you previously provided services on the Project. Our services may include review of or reliance on portions of your work previously provided on the Project. Please let us know if there are any concerns or unresolved issues with respect to the Project, your services, or the documents previously produced. CC: To Client ABC

The Successor Design Professional: Strategies & Solutions CONTRACT SCOPE OF WORK: Consultant’s services for the Project are intended to commence as of the effective date of this Agreement, and do not include any responsibility for the prior investigation and services relative to the Project except as expressly set forth herein. Client expressly acknowledges that Consultant will rely on, incorporate, or interpret such prior work product as it exists, and shall have no responsibility for such work product except to the extent any issue or concern comes to Consultant’s actual knowledge and understanding.

The Ultimate Tool & Strategy: The Expanded Standard of Care Consultant’s services shall be provided consistent with and limited to the standard of care applicable to such services, which is that Consultant shall provide its services consistent with the professional skill and care ordinarily provided by consultants practicing in the same or similar locality under the same or similar circumstances. Such standard of care is not a warranty or guarantee and Consultant shall have no such obligation. Accordingly, Client should prepare and plan for clarifications and modifications which may impact both the cost and schedule of the Project.

Poll No. 6 Given the four possible roles, which would you rather play with respect to a suspended project? ____Suspended ____Replaced ____Resuming ____Replacing

Thank You! Questions? David A. Ericksen, Esq. Severson & Werson (415)