Unit 206: Domestic hot water systems

Slides:



Advertisements
Similar presentations
Systems Review 1 ATC Chapter 4.
Advertisements

Domestic Hot and Cold Water Services
HOT & COLD WATER SYSTEMS
Pre Sales Dept. HERCULES Solar 26 1 A Condensing floor-standing boilers with built-in solar circuit.
ADX 150 – Engine Repair ADX 170 – Climate Controls
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Basic Refrigeration Cycle
Unit 206: Domestic hot water systems
Cold feed to hot water cylinder Sink Basin Bath Drain valve Stop valve WC cistern 100 litre (minimum storage cistern)
Unit 205: Cold water systems
Watertube Boiler.
Objective of the session.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
Unit 206: Domestic hot water systems
Filling, purging and air removal
Chapter 6 Thermal Energy
Unit 208: Central heating systems
Unit 205: Cold water systems
Outcome 2 Materials used to install domestic central heating pipework Unit 208: Central heating systems.
Unit 206: Domestic hot water systems
Unit 205: Cold water systems
Unit 206: Domestic hot water systems
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
Unit 206: Domestic hot water systems
Lesson One.
Chapter 12: Alternative Technologies To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Presentation on Installation of a Domestic Cold Water Storage Cistern
STEAM HEATING.
Hydronic Mechanical Controls
PLUMBING Presentation on Central Heating. Forced circulation through loop pipework only Central Heating – Types of systems (Part 1) - One pipe system.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
Plan 2 – Dead-end Seal Chamber Optional Jacket
HVAC523 Basic Subsystems.
HYDRONIC HEATING AQUASTATS
Unit 205: Cold water systems
Unit 208: Central heating systems
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
Trade of Plumbing – Phase 2 Module 2 – Unit 9 Module 2: Domestic Hot and Cold Water Services Unit 9 – Valves and Taps Duration – 11 Hours.
Presentation Dungrani rakesh v. Div : a Branch : mechenical Sem : 1 st.
Presentation on Feed and Expansion Cistern. Central Heating At the end of this part you should be able to: Identify general system methods of feed and.
Outcome 1 (part 2) Types of domestic central heating systems installed in domestic dwellings Unit 208: Central heating systems.
Section 3 Using Heat.
Solar Heating/Cooling/Dehumidifier Systems
Outcome 3 Pressure, force and flow of water Unit 203: Scientific principles for domestic, industrial and commercial plumbing.
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
The Cooling System (Reasons for)
HOT WATER Understand and apply domestic hot water system installation and maintenance techniques.
Unit 209: Drainage systems
Unit 209: Drainage systems
Unit 209: Drainage systems
Plumbing Valves.
Plant & Reactor Design Passive Reactor Core Cooling System
Plumbing system fundamental and design course
Pumped Discharge. Brian Makin 14/
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Heating Ventilation and Air Conditioning
Outcome 1 (part 1) Types of domestic central heating systems installed in domestic dwellings Unit 208: Central heating systems.
Outcome 4 Mechanical central heating controls Unit 208: Central heating systems.
PLUMBING APPLIANCES & COMPONENTS
Hot water Systems Heaters.
5508BESG Services and Utilities Lecture 2
Hot Water Systems Cylinders and Systems.
______________ Combustion Engine
Cisterns and Insulation
Common Requirements Taps and Valves.
Presentation transcript:

Unit 206: Domestic hot water systems Outcome 3 (part 1) Installation requirements of domestic hot water plumbing systems

Installation A standard, gravity fed, hot water system requires the head height between the cold water storage cistern and the hot water cylinder to be a high as possible. The greater the head height, the greater the pressure. The larger the pipe diameter, the greater the flow rate.

Installation

Installation When a hot tap is opened the weight of the water under gravity pushes the cold water from the CWSC, down the cold feed pipe into the hot water cylinder. In turn, the hot water in the cylinder leaves the top of the cylinder via the hot distribution pipe and travels through the pipework towards the outlet.

Installation

Installation The connection to the CWSC of the cold feed is made via a tank connector – these can be compression or push fit. The position of the connection is vital. From the bottom of the CWSC, measure up 25mm, which will be the cold distribution. Measure up a further 25mm and this will be the cold feed position. The cold feed is sized according to BS6700.

Installation The cold feed is always positioned above the cold distribution. This is because if the float operated valve was to fail and the cistern did not refill with water, the CWSC would eventually empty of water. The highest tapping is the cold feed, which would mean the hot water would stop first and therefore avoid any scalding to people, particularly in a shower. All pipes should be laid with a slight fall (except the hot water draw off) to prevent airlocks within the system.

Installation On a rising main to the CWSC, just prior to the float operated valve, a service valve must be installed to allow maintenance on the float operated valve. On the cold feed pipe, a fullway gate valve must be installed, generally within 1 metre of the cistern. (It must be a fullway gate valve, as this is a low pressure system.) This means it will generally be found in the loft or airing cupboard. This gate valve, if closed, will stop the flow of water to the hot water system and therefore allow maintenance to be carried out.

Installation Service valve prior to the float operated valve Fullway gate valve on the cold feed

Installation When a hot water outlet is opened the hot water leaves the cylinder via the hot distribution pipe. The initial part of the hot distribution, which leads to the vent pipe connection, must be a minimum of 450mm in length and slightly rise towards the open vent. The 450mm length of pipe prevents one pipe circulation which causes loss of heat. The rise in the pipe allows for any air to migrate up towards the open vent, rather than being trapped and causing an air lock.

Installation 450mm long preventing one pipe circulation. Slightly rising allowing any air to escape up the open vent.

Installation Parasitic circulation (or one pipe circulation) is circulation that occurs within the same pipe. It generally occurs in open vent pipes that rise vertically from the hot water storage cylinder. The hotter, central water rises up the vent pipe and the cooler water, near the walls of the pipe, falls back into the cylinder. This can be a major cause of heat loss from hot water storage cylinders.

Installation The open vent pipe rises vertically from this connection to the CWSC cistern. Both the open vent pipe and cold feed pipe (but primarily the cold feed pipe) take up the expansion in the hot water when it is heated. The water level in the CWSC will rise slightly.

Installation The open vent pipe must not be smaller than 22mm and must terminate over the cold water storage cistern. It also must not have any valves connected to it, as its primary function is safety in case of the system overheating.

Installation It is important that the height of the open vent pipe over the CWSC is measured correctly. From the water level: The 22mm vent height from secondary hot water system is worked out by: 150mm + 40mm per metre of system height (m)

Installation All hot water cylinders must be part L compliant, which means they heat up efficiently and they do not lose the heat when heated, due to the insulation. The cylinders are labelled with a Benchmark certificate, outlining the details of the cylinder.

Installation If a hot water cylinder is required to be installed in a loft or attic area (sealed system) where height may be restricted, a horizontal cylinder may be an option.

Components Thermostat The boiler has a thermostat that regulates the primary water temperature, which flows to the coil. When the primaries are up to temperature, the boiler will cut out until the temperature reduces.

Components Thermostat There is a problem with the control of the temperature produced by solid fuel boilers. With a gas or electric boiler the heat can be switched off and controlled; with a solid fuel boiler it is uncontrolled.

Components The cylinder has a thermostat that regulates the domestic hot water temperature. This is placed one-third of the way up the cylinder. When the water is up to temperature, this operates the motorised valve and stops the primary water from circulating through the coil.

Installation In all hot water cylinders, when they are up to temperature there is a temperature difference between the top and bottom of the cylinder. This is called temperature stratification. There is a baffle installed in some cylinders, which prevents incoming cold water mixing with the hot water. The temperature difference can be up to 100C. The cylinder stat is place one-third of the way up the cylinder. Online resource: http://www.youtube.com/watch?v=SV2vdGPLRiY&feature=related

Installation All hot water systems, whether centralised or localised need to have the advantages and disadvantages outlined to the customer. Before suggestions are made the engineer needs to consider: Property size Storage capacity Usage Fuel type Installation cost Efficiency