Preparation Of DPR And How To Monitor The Construction Works On Technical Aspect.

Slides:



Advertisements
Similar presentations
Head of Policies & Planning Division Ministry of Environment
Advertisements

Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
DECORATIVE SINGLE COAT PLASTER FOR MARBLE CHIPS CLADDING SYSTEM ( PEBBLEDASH )
[Organisation’s Title] Environmental Management System
PREPARED BY- NABANITA SHARMA M.E. 3 RD SEMESTER ROLL NO.-10/12.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
Your logo here WasteMINZ Mid-Year Roundup Wellington.
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
Brent Hansen Environmental Commercial Composting
Environment Engineering I
Part III Solid Waste Engineering
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
CE 326 Principles of Environmental Engineering Prof. Tim Ellis February 4, 2008 Municipal Solid Wastes
The Process of Siting and Approving a New Landfill in Ontario
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
NADAFA Program Forum Quarterly Meeting, Abu Dhabi Sustainability Group
Hydropower Development: Experience of Nepal
Inspection, Quality, Variation, Statistical Control and Acceptance Criteria Dr. J.SUDHAKUMAR Assistant Professor Department of Civil Engg. NIT, CALICUT.
MBA (Trimester) Term V Module Title : Project Finance and Management
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
OPEN DUMPS Oldest and most common way of disposing solid waste
ENVIRONMENTAL MANAGEMENT PLAN
Good hygienic practices
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
NextEnd. Preparation of Business Plan for Setting up Enterprise Business Plan.. The business plan is a written document prepared by the entrepreneur that.
MODULE “STRATEGY DEVELOPMENT”
CONSTRUCTING A FIVE CABIN LATRINE
Protection Against Occupational Exposure
Financing Urban Public Infrastructure
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Civil engineering branches & scopes
Role and Components of Project Evaluation
Project Planning and Capital Budgeting
America’s Water Upmanu Lall water.columbia.edu.
Italian Ministry for the Environment, Land and Sea National Workshop: Developing Environmental Infrastructure Projects in the Waste Sector in Serbia Case.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
EnE 301: ENVIRONMENTAL ENGINEERING
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
1 Influence of Main River Basin District Plans on Environment Czech University of Life Sciences Faculty of Environmental Sciences Miroslav Martis,Vladimir.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Environmental Toolbox. Technical Module Introduction.
Lynne Welsh Massachusetts Department of Environmental Protection.
 incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into.
PAMUKKALE UNIVERSITY DENİZLİ, TURKEY Rome Meeting July 4-8, 2007.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
The Priority Environmental Investment Programme for South Eastern Europe – PEIP National Workshop Developing Environmental Infrastructure Projects in the.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
WATERSHEDS AND POLLUTION. What is a Watershed? A watershed is simply: an area of land where runoff collects and then is a water supply to a large lake.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Environmental Safeguards
Upland Landfill Waste Discharge Application 7295 Gold River Highway
State Audit Bureau of Kuwait
Numfon Eaktasang ,Ph.D Thammasat University
GCF’s Environmental and Social Safeguards
Scientific or Engineered Landfilling of Waste
CONCRETE MIX DESIGN PRACTICE OF ETHIOPIA AND ITS APPLICATION ON CONSTRUCTION SITES Presented by: Adiamseged Eyassu WORKSHOP ON CONCRETE CONSTRUCTION PRACTICES.
Presentation transcript:

Preparation Of DPR And How To Monitor The Construction Works On Technical Aspect.

Preparation of DPR  DPR is the based document for planning and implementing the project.  DPR indicates the technical and financial strategies to be adopted for implementation.

Preparation of DPR  DPR is broadly comprised of following things.  Project background.  Project definition, concept and scope  Project cost  Project institution framework.  Project financial structuring  Project phasing  Project O & M framework and planning  Project financial viability / sustainability.  Project benefits assessments.

Project Background  It narrates the necessity and aim of the project.  Existing status of the physical infrastructure.  Base line information of users.

Project definition, concept and scope  The project concept comprises of several issues like :-  Land  Environment impact assessment  Environment management plan  Rehabilitation and Resettlement  Details of surveys and investigation  Disaster related risk assessment and countermeasures.

Project Cost  The project cost should clearly indicate covering all following factors:-  Land acquisition / site development  Physical infrastructure component-wise cost  Environmental compliance cost  Rehabilitation & resettlement cost  Cost of survey & investigations  Cost of shifting utilities  Cost of consultancy services  Finance / interest cost  Contingency

Project Institution framework.  The DPR needs to provide :  Role of institutions involved in the Project  A Roles / responsibility matrix  Innovative approaches for better co- ordination between ULB and state government department.  Manner of undertaking construction works  Involvement of the construction agency in the O & M activities

Project Institution framework.  Area of involvement of the private sector in the construction phase of feasibility study, engineering design, specialized surveys, construction works, supervision consultants, Quality Assurance Consultants or any other assignments  Brief description of strategy for the overall works program including tender process.

Project Financial structuring  DPR must indicate the composition of fund.  Central Government.  State Government.  ULBs  Loan component, Private Investment etc. will have to be shown in the DPR.

Project Financial structuring  Private participation can be utilized in ULB or State share.  Private contribution can be recovered against O & M in the shape of user charges.  The billing and collection of user charges can be entrusted with the Private Agencies.

Project Financial structuring  Linking construction with O & M performance contract could provide the advantage of operational cost efficiency.  Private sector financing in the project is a well accepted approach under JnNURM as it curtails the financial burden on Govt. and Municipal fund.

Project Phasing  Project Activity Schedule to be indicated.  Schedule for tendering.  Schedule for State and ULB contribution  Schedule for all clearances.  Schedule for shifting utilities  Schedule for implementation of project components

Project O & M planning  The DPR should indicate :-  The institution to be engaged in the O&M  Existing system of billing and collection.  Brief analysis of the key issues and obstacles.  Scope of private entity in O&M.  The requirements of manpower, energy, spares etc. for O&M with proposed additional requirement.  Tariff model, existing rate for all categories and forecast growth over the next 20 years.

Project Financial viability / sustainability.  The DPR is to provide information in Municipal level. Cash flow : A complete cash flow covering the last 5 (five) years and projections for the next 20 (twenty) years. An assessment of the annual impact of the project on the Municipal finances.

Project Financial viability / sustainability Debt situation assessment :  Debt schedules and terms for all debt taken.  Debt service coverage ratio  Debt-equity ratio for the project and the ULB Other financial information :  Credit rating details.

Project Benefits assessments DPR is to provide the following :  List of benefits (both social & economic)  Benefits are to be assessed on project outcomes and project outlays covering impact on citizen.

Project benefits assessments  List of adverse impacts on following aspects:  Pollution, environmental distortions  Reduced green cover  Reduced access to any specific user segments  Supply interruptions etc.  Displacement of inhabitants  Disruption in livelihood / reduced employment  Possible haphazard development around / adjacent project site areas

Preparation of DPR on Municipal Solid Waste Landfill

Selection of Landfill site  Criteria :  Lake or Pond : No landfill should be constructed within 200m of any lake or pond.  River : No landfill within 100 m of a navigable river or stream.  Flood Plain : No landfill within a 100 year flood plain.  Highway : No landfill within 200 m of the right of way of any highway. Trees and berms are used to screen the landfill site.

Selection of Landfill site  Habitation : A landfill site should be at least 500 m from a notified habitated area. A zone of 500 m around a landfill boundary should be declared a No-Development Buffer Zone.  Public Parks : No landfill within 300 m.  Wetlands : No landfill within wetlands.  Ground water : No landfill in areas where water table is less than 2 m below ground surface.

Selection of Landfill site  Airports : No landfill within 5 miles from Airport Operational Area.  Water Supply Well : No landfill within 500 m of any water supply well.  Unstable Zone : A landfill should not be located in potentially unstable zones such as landslide prone areas.  Buffer Zone : A landfill should have a buffer zone around it

Land fill  DPR on landfill will have following contents  Introduction  Present Status  Site Characteristics  Landfill Design Facilities  Land fill Design Features and Site Plan  Landfill Construction  Landfill Closure  Monitoring Requirement  Costing

Landfill Introduction :  This is the introductory brief of activities to be performed for landfill.  Also this is a review of landfill development process to ensure a landfill is constructed, operated and maintained in environmental friendly manner.

Land fill Present Status :  It narrates the present generation of solid waste, collection system, transportation and dumping method.

Landfill Site Characteristics :  It is the description of proposed land, its area, topography, access facility, climate, rainfall, temperature, humidity, ground water status, surface water and drainage system, soil properties etc.

Landfill Design Facilities  The essential basic steps for landfill design are  Landfill sizing  Site layout  Landfill layout  Leachate management  Landfill gas management :

Landfill construction  1 st layer – 50 cm thick compacted soil  2 nd layer – Geo-synthetic clay liner  3 rd layer – 1.5 mm HDPE Geo-membrane

Landfill construction  4 th Layer – 30 cm thick gravel. The gravels should be smooth, and round of 12 – 15 mm in size.  Leachate collection system of perforated HDPE leachate collection pipe embedded in this gravel layer

Landfill construction  5 th layer – Geo-textile for filtration.  6 th layer – Finally a 300 mm thick soil on the Geo-textile as a protective layer  Leachate will go to leachate treatment plant for reduction of BOD, COD and suspended solids.  Daily waste is leveled, compacted and covered with fresh earth to give a pleasing appearance and also to prevent odours.

Landfill Closure  Waste will have to be graded to the necessary stable slopes.  1 st layer mm thick gravel to release gas through gas vents.  2 nd layer mm soil.  3 rd layer - 1 mm thick HDPE liner to control water leaching into soil layer.  4 th layer mm thick gravel for drainage.  5 th layer - Geo-textile to keep the soil layer separated.  6 th layer mm thick soil for vegetation.

Monitoring Requirement  Ground water quality monitoring within 50 mtr. periphery of landfill site shall be periodically monitored.  Ambient air quality monitoring will have to carried 4 (four) times in a year around the site.  Portable methane detection units are available for the purpose.  The air quality must be monitored for 15 (fifteen) years after the closure of the landfill.  Surface water monitoring around the site is also necessary.

Cost  For all activities to be performed detailed estimate on the basis of engineering details will have to be prepared to determine the project cost.

How To Monitor The Construction Works On Technical Aspect

Construction Monitoring  It is the process to monitor and control the activities associated with initiating, planning, executing, and closing a project.  Problems during execution should be identified in a timely manner for immediate corrective measures.  Construction must be monitored and measured regularly to identify deviations from the plan.

Construction Monitoring  Free site must be ensured before any work is taken up.  Site of construction is to be identified to ensure flawless layout of the work.  Mobilization of manpower, materials, equipments and resources is most essential.

Construction Monitoring  Monitoring is needed to ensure proper management on following issues :  Cost  Quality  Risk

Construction Monitoring  Cost Management :  It is necessary to perform cost control process of influencing the factors that create changes to the basic cost to ensure that the changes are beneficial and according to exact requirement of the work.

Construction Monitoring  Quality Management :  It is necessary that the quality of the work is properly ensured in terms of materials and workmanship

Quality Management  Quality of materials will have to be ensured before work is taken up :-  Bricks : Bricks shall be sound, hard, homogenous in texture.  Bricks shall have a minimum crushing strength of 105 kg/sq.cm.  Bricks should have ringing sound if struck  Brick absorbing more than 20% of its dry weight after 24 hrs. immersion shall be rejected.

Quality Management  Sand is the fine aggregate, which shall pass through IS: sieve designation 4.75 mm, leaving a residue not more than 10%.  Sand should be collected from local river beds  Sand shall not contain more than 8% of silt. It should be clean, hard and sharp.

Quality Management  Stone aggregate : This shall be broken from good hard stone boulder and shall be free from soft, friable, thin, elongated or laminated pieces.  This shall be roughly cubical in shape and shall be clear and free from dirt and any other foreign matter.

Quality Management  Steel :  Presently we use TMT (Thermo Mechanically Treated) steel of various brands.  BIS Certification Marking should be checked in each bundle of bars before use.

Quality Management  Cement : Net weight of each bag of cement shall be 50 kg.  Cement stored for over 6 (six) months shows signs of deterioration or contamination and should be tested before use.  OPC cement and PPC cement are generally used for construction.  OPC conforms to IS: and PPC conforms to IS:

Quality Management  Concrete consistency :  The quantity of water to be used for each mix of 50 kg. cement shall not be more than 34 ltr. for 1:3:6 mix, 32 ltr. for 1:2:4 mix., 30 ltr. for 1:1:2 mix.  For vibrated concrete the limit specified may be suitably reduced.

Quality Management  Curing :  Curing of concrete shall be done after 24 hrs. of laying with moist gunny bags, sand etc. for a minimum period of 7(seven) days.  Concrete should not be disturbed by further construction during the curing period.

Risk Management  Four steps to risk management are :  Risk Identification  Risk analysis  Risk management planning and  Risk review  Risk should be reviewed periodically with the related persons so that it can be faced and tackled on time