GTI’s Composite Materials (CM) Program

Slides:



Advertisements
Similar presentations
On the way to an effective regulatory framework of pipeline safety The WP-6 sectoral initiative on pipeline safety Prepared by Sergey Mokrousov.
Advertisements

QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
DESIGN INVESTIGATE REHABILITATE Design and Quality Assurance of CFRP Repair of Concrete Pressure Pipes Rasko Ojdrovic Murat Engindeniz Mehdi.
August 21, 2012 Western Regional Gas Conference Paul Gustilo Southwest Gas Corporation.
Government Industry R&D Forum March 2005 Pipeline Design & Construction Near Term Focus Future Gaps & Opportunities.
Composite Wrap for Non-leaking Pipeline Defects Lessons Learned from Natural Gas STAR Transmission Technology Transfer Workshop Duke Energy Gas Transmission,
Materials and Joining March 2005 R&D Forum David Horsley TransCanada Pipelines Limited.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
Pipeline Replacement Programs Presentation By Frank Radigan Hudson River Energy Group June 26, 2012.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
High Consequence Areas & Pipeline Assessment Intervals –Is there a need for change? Terry Boss Sr. VP Environment Safety and Operations Interstate Natural.
Overview of Key Rule Features
Overview Lesson 10,11 - Software Quality Assurance
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
Pipeline Qra Seminar Title slide Title slide.
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Update on progress with development of DS459
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Technical Advisory Committee December 2012 Fitness for Service.
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
NiSource Pipeline Group Natural Gas Star Experience Presented at the Natural Gas Star Users Conference June 3, 2003 By Gregory Lago NiSource EH&S Group.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Oversight and Safety Division September 2015.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Ensuring Success in Integrity Management Marty Matheson American Petroleum Institute July 24, 2002.
1 November 3, 2006 David Knoelke API Public Awareness Committee Chair (BP Pipelines N.A.) Greater Public Involvement – What does that mean?
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Overview of Reliability and Markets Robert Thomas Power Systems Engineering Research Center/Cornell University January 27-29, 2004 Washington, D.C. Transmission.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Stress Corrosion Cracking (SCC) Josef Kopec, P.Eng.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable.
MICHAEL BAKER Jr., Inc. Stress Corrosion Cracking SCC Workshop December 2, 2003 Engineering & Energy.
June 15, 2009 Pipeline Safety & Efficiency. Pipeline Safety & Efficiency Our aging infrastructure not only poses significant safety hazards, but can impact.
Reliability Analysis Sample Study October 2000 Jahan Alamzad 1250 Aviation Avenue Suite 200M San Jose, CA Tel: Fax:
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
How Old is Too Old? A Look at Aging Transmission Pipeline Infrastructure Issues.
Cost effective while providing customer focused solutions.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Introduction Pipeline safety awareness meetings in a presentation setting are nearing the end of their lifecycle and usefulness. Pipeline and utility.
Failure Modes, Effects and Criticality Analysis
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Road Investment Decision Framework
UNDERSTANDING ISO 9001:2008.
Safety Accountabilities
Leo Associates Services
GMD Data Request NERC Rules of Procedure Section 1600
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Distribution Integrity
UPS Application Alcad: UPS Application.
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

GTI’s Composite Materials (CM) Program June 2014

Composite Materials (CM) Program Overview GTI’s Composite Materials (CM) program is facilitating the implementation of composite materials and technologies for the rehabilitation of distribution and transmission pipelines. GTI is assisting the industry by: Developing implementation roadmaps to lay the foundation for the selection and design of composite pipe / structural liner pipe rehabilitation, Establishing and performing testing for long-term performance prediction of the various composite/structural liner systems, Establishing standards and design criteria necessary for the acceptance and allowable use by the natural gas industry, and Coordinating the requirements for implementation and regulatory acceptance.

Benefits of the CM Program This program will enable the safe and cost effective rehabilitation of distribution & transmission pipelines without large scale, open trench excavations. Composite piping systems can provide natural gas operators with options to restore/replace their piping infrastructure. Composite materials have the potential to provide for a corrosion free, high strength, and damage resistant piping system.

EXAMPLE 1 Identification of Structural Liners & Composite Pipe for Pipe Rehabilitation Value: Liners/Composite pipe could be a cost effective means to rehabilitate urban, high pressure pipelines where the ROW is congested and cost of construction prohibitive. Objective: To identify, investigate, and provide a selection guide for the numerous types of reinforced thermoplastic (RTP) and composite piping systems currently on the market for the rehabilitation of natural gas pipelines. Deliverables: A selection or comparison guide was created to provide utilities with detailed information on the various systems available directly applicable to their specific system needs.

EXAMPLE 2 Evaluation of Structural Liners for the Rehabilitation of Gas Piping Systems Value: The evaluation of these new materials will assist with the generation and promotion of these new technologies and their implementation for the rehabilitation of piping systems. The results of the long-term tests will help assure the safety and integrity of the rehabilitated pipe sections. Objective: To conduct an engineering assessment of structural liners and their interaction with the host pipe to determine the characteristics required for the liners to carry the internal and external loads of a degraded host pipe. Deliverables: An assessment of the failure modes of structural liner composite piping systems. Also, establish testing procedures and prediction of long-term performance of the structural liners

EXAMPLE 3 Composite Pipeline Repair Systems Value: Will substantially reduce the cost of repairing using the cutout method and will allow a comparison of repair techniques used on similar types of pipeline damage. Objective: To research, test and assess various repair techniques and provide justification for their use as is allowed by CFR 29 Part 192. Deliverables: The results will provide utilities with repair methods that reliable engineering tests and analysis show can permanently restore the serviceability of the pipe.

Summary of CM Program GTI’s Composite Materials (CM) program is: Facilitating the implementation of composite materials and technologies for the rehabilitation of distribution and transmission pipelines. Providing natural gas operators with options for a cost effective means of restoring aging pipelines to full capability by utilizing composite materials/structural liners. Allowing for a corrosion free, high strength, and damage resistant piping system.

GTI is a company that solves important energy changes, a company that truly has… Contact information: Dennis Jarnecke R&D Manager, GTI dennis.jarnecke@gastechnology.org …“the Energy to Lead”