Company Overview of Charah Privately held company based in Louisville, Kentucky –Founded in 1987 Dedicated to providing the power industry the highest.

Slides:



Advertisements
Similar presentations
GOLF COURSE HOSPITAL AGRICULTURE WILDLIFE HABITAT WETLANDS OPEN SPACE SCHOOL RECREATION HOUSING DEVELOPMENT WHAT DO ALL THESE PLACES HAVE IN COMMON?
Advertisements

1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
There are 3,091 active sanitary landfills in the U.S. and over 10,000 old municipal landfills (rubbish pits).
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
Division of Waste Management Solid Waste Section January 12, 2012 Coal Combustion Residuals Regulatory Framework Implemented by the Division of Waste Management.
Solid Domestic Waste IB Syllabus 5.5.1, AP Syllabus Ch 21 Personal Waste Audit Trashed video.
Section 3: Mining Regulations and Mine Reclamation
At 4620 square miles, Lane County, Oregon is nearly as large as the State of Connecticut and is home to some 336,000 residents. Short Mountain Landfill,
Environment Engineering I
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
Rochelle Routman, PG Environmental Specialist Georgia Power
Coal Ash Ponds The Romeo and Juliet Story of Coal Fired Power Plants Society sees them as toxic together, but currently, one cannot exist without the other.
Re-Use of Waste Foundry Sand By Shaun Lindfield – Safety & Environmental Engineer Precision Disc Castings Ltd.
G3 – Environmental Geomechanics (Dr Sam Yuen)
Connecticut Department of Public Works -- Rebecca Cutler – Environmental Analyst.
AGRICULTURE BMP QUESTION 2 Name the BMP.. AGRICULTURE BMP ANSWER 2 Name the BMP. Windbreak Row of trees Trees or shrubs that slow the wind.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
EnE 301: ENVIRONMENTAL ENGINEERING
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
CCR Final Rule Utility Perspective on Key Compliance Items
Solid Waste Management Chapter Generation (Section 14.2) What is the average per capita MSW generation in the U.S.? A. 1.3 lb/d B. 2.4 lb/d C. 4.6.
War on Waste SC.912.L Waste management strategies Recycling and reuse- Recycling allows the reuse of glass, plastics, paper, metals, and other.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Francis Farm Landfill. How’d We Get Here?? Francis Farm Landfill (FFLF) began accepting waste in 1973 and remained open until October years of.
PowerSouth Energy Cooperative:
Chapter 4 Land and Soil Resources
2015 Coal Handling and Storage Conference
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
1 Draft Final Safe Fill Regulations Major Changes/Revisions Presented to the CSSAB November 8, 2002.
IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager Source:
Division of Water Quality Coal Ash Storage, Use, & Disposal: Update Ted L. Bush, Chief Aquifer Protection Section Division of Water Quality “To protect.
Water Quality Rulemaking in Response to S.L
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
Department of Environmental Quality January 13, 2016 Environmental Review Commission.
David K. Paylor Virginia State Board of Health March 17, 2016.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Gary J. Pendergrass, PE, RG Midwest Environmental Compliance Conference May 13, 2015 | Overland Park, Kansas USEPA Coal Combustion Residuals Rule: Impact.
Chapter 16 Landfill Liners and Geosynthetics
NC SWANA 2017 Spring Conference
Ascending to IED compliance
Design and Construction of Composite Lined Landfills
Department of Environmental Quality
John Christian President, Logistics, Processing and Disposal
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Beneficial Uses & Disposal of Coal Combustion Residues (CCRs)
Numfon Eaktasang ,Ph.D Thammasat University
Ascending to IED compliance
Landfill Post-Closure Trust Fund
Solid Waste Management and Disposal
Water Quality Rulemaking in Response to S.L
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Scientific or Engineered Landfilling of Waste
Environmental Geotechnics
Chapter 16 Section 3: Mining Regulations and Mine Reclamation
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Landfilling (Containment and Restoration) in Ireland
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Solid and Hazardous Waste Chapter 21
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
May 15, 2018 David Paylor, Director
Presentation transcript:

Company Overview of Charah Privately held company based in Louisville, Kentucky –Founded in 1987 Dedicated to providing the power industry the highest quality performance with total safety and environmental compliance –50+ Long-Term Ash Management Contracts –34 Power Plants in 18 States –16 Million (+) Tons of Coal Combustion Residuals Handled Annually

North Carolina Presence of Charah Working in North Carolina since active projects in North Carolina 120 employees in North Carolina NCDOL Gold Certificate in Safety

Beneficial Reuse of Coal Ash Transfer 3 million tons of coal ash from un-lined ponds to a safe, fully-lined engineered structural fill Environmentally, scientifically, technically and fiscally sound solution. Reclaim clay mine back to natural topography. Proven project at the Asheville Regional Airport.

Beneficial Reuse Sites LocationAcreageFill Capacity (tons)Rail Service BrickhavenMoncure, NC30012 MillionCSX/Norfolk Southern SanfordSanford, NC5008 MillionCSX/Norfolk Southern TOTAL20 million Charah owns the beneficial reuse sites below, all of which are active mines. At each of these sites, Charah will file a permit modification to use ash as the primary material for reclamation of the mined areas to comply with Senate Bill 729. Once complete, each site will be permanently capped and closed according to these requirements, inclusive of site management and groundwater monitoring for 30 years..

Location of Mine Sites Highway crossing Rail access Haul Route Sanford Brickhaven

SB729 Compliance All of Charah’s proposed beneficial reuse sites will adhere to Senate Bill 729: Design of all site meet or exceed engineering criteria – Base liner constructed of a geomembrane layer w/composite compacted clay or geosynthetic clay layer –An ongoing groundwater monitoring program –An ongoing detection monitoring program –A leachate collection system –An overall assessment monitoring program Design of all sites meet or exceed siting criteria: –50 feet of property boundary –50 horizontal feet of a wetland –300 horizontal feet of a dwelling or private well –4 feet of the high groundwater table –Drinking water source survey

Design of a Fully-Lined Engineered Structural Fill 8

Fully-Lined Engineered Structural Fill at the Airport Base liner installation and subgrade preparation at Airport

Fully-Lined Engineered Structural Fill at the Airport Drainage layer deployment over base liner

Fully-Lined Engineered Structural Fill at the Airport Ash placement over liner system

Fully-Lined Engineered Structural Fill at the Airport Deployment of cap liner across finished ash surface ( Note: Cap liner secured to base liner anchor providing full encapsulation)

Fully-Lined Engineered Structural Fill at the Airport Placement of soil cover over cap liner