Art Kuljian, P. E. , BCEE, Kevin Olmstead, Ph. D. , P. E

Slides:



Advertisements
Similar presentations
Wastewater Management at an Animal Protein Rendering Facility J.B. Hess, W.A. Dozier, J. Spann and B. Thomas Poultry Science Department, Auburn University.
Advertisements

LEACHATE MANAGEMENT AND TREATMENT
1000 Friends of Florida Presentation on May 12, 2005 Presenter: Kart Vaith/CDM
Treatment of Slaughterhouse Wastewater
Anne Arundel County Department of Public Works
Waste Water Treatment (Sewage Treatment)
Prepared by WMC Consulting Engineers Inc. John A. Wengell.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Herwig Goldemund, Ph.D. Geosyntec Consultants Atlanta Regional Office
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Coles Point Wastewater Treatment Plant
CE 370 Filtration.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Tertiary Treatment: Nutrient Removal, Solids Removal, and Disinfection.
The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Calcite Contactors for Corrosion Control
Presented to: The Society of Wetland Scientists Mid-Atlantic Chapter 2014 Conference State College, Pennsylvania April 5 th, 2014 By: Kevin L. Hoover,
By: Audella Eid Advisor: Dr. R. Zurayk Constructed Wetlands for Wastewater treatment.
On-Site Leachate Management RM of Tache Pilot Study.
Truesdale Lake Lake Management Plan Truesdale Lake Association South Salem, NY.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
Wastewater Treatment & Collection System Improvements.
Constructed Wetlands for the Treatment of Municipal Wastewater Rebecca Newton Civil and Environmental Engineering November 28, 2006 BZ 572
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
7.1 Wastewater Treatment Process
Aquatic-Based Treatment Systems Biological Treatment after appropriate pre- and primary treatment Plants used to provide substrate for bacterial growth,
Land Application Wastewater Systems Provides 2 o Treatment (Biological) Used in combination with pretreatment and primary treatment Often called Natural.
Module 6: Water Supply and Waste Treatment. Issues Natural water Domestic water Sewage.
AN ADVANCED URBAN WATER MANAGEMENT CONCEPT: GRAYWATER SEPARATION Sybil Sharvelle September 11, 2008.
Sewage Treatment.
Volvo Group North America, LLC Reuse of Wastewater - A Manufacturer’s Experience Steve Pierett, Env.Mgr. CEM, CRM, CP EnMS-Industrial.
A combination of warm weather grasses, terrestrial and aquatic plants in and around the spring Stormwater Management Plan for College Springs Park Benjamin.
A Constructed Wetlands to Enhance Final Treatment of Waste Water from a Poultry Processing Plant J. B. Hess 1, J.P. Blake 1, K.S. Macklin 1, T. Smith 2,
Wastewater Treatment Processes
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
Chapter 11 Wastewater Treatment. On-Site Disposal Systems Septic Tanks Pit Toilets.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
NATURAL WASTEWATER TREATMENT  Pollutant removal by minimal energy utilisation and chemicals  Usage of natural processes (natural resources)  Low cost.
Water Treatment Technology that Works for Megacities in need of Efficient Wastewater Treatment, Recycling, Soil Remediation and Food Production Resources.
 Oklahoma Department of Environmental Quality Water Quality Division.
Construction OF AMMONIA REMOVAL UPGRADES FOR FIRST BROAD RIVER WWTP
Oregon Natural Treatment Systems for Wastewater Natural Treatment Systems – A Water Quality Match for Oregon’s Cities and Towns June, 2014 Oregon Department.
Combined Sewer Systems Vs Not. Deep Tunnel Projects Chicago miles bl/gal Atlanta miles ml/gal Milwaukee miles ml/gal.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY PETALUMA, CA North Bay Watershed Association Conference April 9, 2010.
NH International (Caribbean) Ltd Penal Rock Hindu School Presented by : Sudesh Ramroop.
Water Treatment Drinking water : Held in a holding tank settling the suspended matter. Colloidal materials such as clay are removed from water by using.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
WASTE WATER TREATMENT.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
5th Annual Water and Sanitation Workshop
Recycled Water Project Basis of Design Report
Mason Gulch landscape Management plan Public meeting
Inventory and Tertiary Treatment of Effluent from Textile Industries in Bangladesh The use of a new system combining an enhanced coagulation, flocculation.
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment.
Wastewater Surcharge Reduction for Manufacturing Processes
Numfon Eaktasang ,Ph.D Thammasat University
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
“Alternate” wastewater treatment systems refers to
Stabilization Ponds for Wastewater Treatment
This system consists of a septic tank, constructed wetland, and land application system. The wetland consists of a bed of graded stone with water flowing.
Wastewater Facilities Upgrade Project
Big Sky Wastewater Facility Plan Update
Tertiary Treatment.
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Presentation transcript:

Constructed Wetlands Treatment of an Automotive Bedliner Manufacturer’s Wastewater Art Kuljian, P.E., BCEE, Kevin Olmstead, Ph.D., P.E., Tammy Rabideau, CPG, Jamie Meikle WEFTEC 2009 October 14, 2009

Outline Background Timeline Construction and Startup System Description Treatment Cells and Lagoons Wetland Plantings Tertiary Filtration System Performance System Observations Summary

Background Truck bedliner manufacturing operation in Lapeer, Michigan Mixed sanitary and process wastewater from plastic extrusion and thermoforming operations Previous unlined lagoon system ineffective Restrictive groundwater discharge limits Switched to wetland wastewater treatment “First-in-the-State” in Michigan for an industrial application

Constructed Wetlands Advantages Passive, self-regenerative treatment process, given proper harvesting of dominant plants Low environmental impact Little need for operator attention Large buffering capacity to accommodate system variances Habitats for wetland species Short implementation schedule

Timeline Characterization – June 1999 Pilot Study – August 1999 Design/Build Proposal – January 2000 Begin Construction – April 2000 System Startup – August 2000 Phase 2 Expansion – April 2006 Phase 2 Commissioning – October 2006 In continuous operation since November 2000

Relative Removals During Pilot Testing

Construction and Startup Wetland comprised of over 27,000 native plants Installed over 160,000 ft2 PVC liner and earth bed Seeded startup with activated sludge from POTW Temporary winter storage of wastewater in HDPE lined lagoons underlain with bentonite-sand layer Final polishing in 150 ft2 tertiary sand filter building UV disinfection prior to surface water discharge

System Description 20,000 gallon/day (gpd) design flow rate, 90 day HRT 4 acre lined wetland treatment system - 2 winter storage lagoons (900,000 gal.each) - 2 primary cells (0.6 acre capacity) - secondary treatment cell (2.5 acre capacity) - tertiary treatment cell (0.9 acre capacity) Continuous downflow sand filter rated at 5 gpm/ft2 Disinfection w/ultraviolet (UV) radiation Flow monitoring structure and discharge to Plum Creek

Process Flow Diagram

Plantings—Primary Cells SPECIES COMMON NAME QUANTITY Nuphar lutea Yellow Lilly 1,700 Eleodea Canadensis Broad water weed 500 Typha latifolia Broad leaf cattail 50

Plantings---Secondary Cells SPECIES COMMON NAME QUANTITY Typha latifolia Broad leaf cattail 5,000 Carex lacustris Lake Sedge 3,000 Scirpus acutus Hard-Stem Bulrush 1,500 Scirpus validus (tabernaeontani) Soft-Stem Bulrush 2,200 Sagittaria latifolia Broad-Leaf Arrowhead 4,500 Alisma plantago-aquatica Water plantain Pontederia cordata Pickerelweed 750 Sparganium eurycarpum Giant Bur-reed 3,500 Polygonum hydroperiodes Smartweed 500 Polygonum amphibium 2,000 Eleodea Canadensis Broad water weed

System Performance Significant treatment occurs in the primary cells: - BOD and TSS are reduced ~ 60% to 70% - NH3-N is reduced ~ 85% to 95% - Total P is reduced ~ 60% to 70% Flowthrough, facultative treatment occurs in the primary cells, with an HRT of ~ 12 days Vegetative growth in the secondary and tertiary cells results in mass removals for all target parameters of 90% to 95%

System Removal Performance Parameter Influent Primary Cell Discharge Final Discharge BOD5 (mg/l) 12 to 248 9 to 66 1.5 to 7.1 TSS (mg/l) 54 to 122 16 to 80 4 to 20 NH3-N (mg/l) 16 to 46 0.2 to 7.4 0.14 to 2 TP (mg/l) 3.4 to 8.6 0.4 to 5.5 0.1 to 0.5

Effluent BOD

Effluent TSS

Effluent NH3-N

Effluent P

Original Site

Lagoon Preparation

Cell Preparation

Sand-Bentonite Underlayer

Lagoon Liner Installation

Treatment Cell Liner Installation

Flow Distribution Berm Construction

Initial Planting

Water Plantains and Bulrushes in Secondary Cell

Acclimated Plantings

Winter Storage Lagoon This is the wastewater storage lagoon (lined)

Artistic Shot of Storage Lagoon

Secondary Cell

Your’s Truly on the Berm

Tertiary Cell with Water Depth Gauge

Tertiary Cell

Final Treatment Building

Volcano™ Continuous Downflow Sand Filter

UV Disinfection and Flow Monitoring

Toad on Top of Things at the UV Chamber

Site Observations Nutrient uptake in wetland vegetation was poor during the winter months and good to excellent remainder of the year Operations labor minimal - <2 hours/8 hour shift Normal operation requires no chemical addition Maintaining water operating depth of <18” is vital for emergent vegetation to occur Presence of wildlife indicative of a healthy habitat

Performance Summary 95% removal of BOD5, TSS, NH3-N and P is achievable Effluent NH3-N of 0.5 mg/L and P of 0.2 mg/L Primary cells provide equalization and treatment prior to discharge to secondary and tertiary cells Effluent BOD5 has averaged 3 mg/L and TSS has averaged 5 mg/L since installation of the sand filter

Lessons Learned Ensure C:N:P ratio of 100:5:1 is available in wastewater feed Maintain wetland water temperature >50°F (10°C); otherwise, winter storage may be needed Backwash of sand filter at 2% to 5% of flow aids insoluble nutrient removal Periodic lamp cleaning via citric acid and/or sodium hypochlorite every 2 to 3 months Annual harvesting of dominant plants (e.g., cattails) helps ensure variation and quantities of all species Harvest duckweed before winter die-off to keep total P inventory in check

Contractor/Supplier Acknowledgements Ms. Joanne Michael, Southern Tier Consulting – West Clarksville, NY Mr. Dave Bury, North American Lining Services – Kalkaska, MI Mr. Mark Fisher, Lighthouse Filters – Dahlonega, GA Mr. Todd Desloover, Debarr Construction – Greenwood, MI Mr. H. Blair Selover, Tetra Tech – Ann Arbor, MI

Questions?