Version 6.0.0 RAILER SMS Track Structure Condition Index (TSCI)

Slides:



Advertisements
Similar presentations
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Advertisements

Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Deterioration of Concrete Roads
By: Adil Godiwalla, P.E. Houston Airport System
USE OF POLYURETHANE GROUT FOR CONCRETE PAVEMENT SLAB STABILIZATION Indiana County District 10-0 Lessons Learned 1.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Pavement/Infrastructure Management Program Review April 6, 2009 Remington & Vernick Engineers.
Copyright © Allyn & Bacon (2007) Statistical Analysis of Data Graziano and Raulin Research Methods: Chapter 5 This multimedia product and its contents.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
FDOT Aviation Pavement Inspection Training Module 2 – Pavement Fundamentals – Overview Florida Department of Transportation Statewide Pavement Management.
INFORMS 2012 Shared Corridor Railway Maintenance Scheduling Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center.
IR CAPIR CAP Indian Register of Shipping IR-CAP Condition Assessment Program Indian Register of Shipping.
Chapter 18 Introduction to Quality
QUANTITATIVE DATA ANALYSIS
Centrality and Prestige HCC Spring 2005 Wednesday, April 13, 2005 Aliseya Wright.
Chapter 5 Time Series Analysis
PERFORMANCE MODELS Lecture 16. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability.
Arch 04 UNIVERSITY OF MINHO 0 Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November REPAIR OF STONE MASONRY.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
Edpsy 511 Homework 1: Due 2/6.
PAVEMENT CONDITION INDEX
Highway Maintenance & Rehabilitation
Sustainment Management Systems
Sleepers A Presentation on Department of Civil Engineering,
1 DTE Rail Services, Inc. Railcar Maintenance Management Seminar Wheel Sets and Wheel Shop Practices May 23, 2008 Greenbrier Rail Services.
Office of Highway Safety Bridge Inspections Dan Walsh.
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
Module 12: Track Inspection & Maintenance
Pavement Distresses Flexible Pavement
@ 2012 Wadsworth, Cengage Learning Chapter 5 Description of Behavior Through Numerical 2012 Wadsworth, Cengage Learning.
Chapter 2 Data Handling.
Aurora Automated Inspection Capabilities on Concrete Ties and Fastener Systems Gregory T. Grissom, P.E. Vice President – Engineering GREX - Georgetown.
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Pavement Preservation Preventive Maintenance
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
Instrumentation (cont.) February 28 Note: Measurement Plan Due Next Week.
Research & Statistics Looking for Conclusions. Statistics Mathematics is used to organize, summarize, and interpret mathematical data 2 types of statistics.
DESIGN OF A RATING SYSTEM FOR SUPPLIERS OF PRINTED WIRING BOARDS AT HAMILTON SUNDSTRAND By: Travis Bossidy, IE And Patrick Dabrowski, IE Industrial Advisor:
Objectives 2.1Scatterplots  Scatterplots  Explanatory and response variables  Interpreting scatterplots  Outliers Adapted from authors’ slides © 2012.
Three Broad Purposes of Quantitative Research 1. Description 2. Theory Testing 3. Theory Generation.
Data Analysis.
Version RAILER SMS RAILER RED (Remote Entry Database)
Statistics 1: Introduction to Probability and Statistics Section 3-2.
Why we need a rating system
Edpsy 511 Exploratory Data Analysis Homework 1: Due 9/19.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
RAILER SMS Track Inspection Version
FUZZY APPROACH FOR ESTABLISHING THE PAVEMENT CONDITION QUALITY INDEX Gwo-Hshiung Tzeng Institute of Technology Management and Institute of Traffic and.
Version RAILER SMS Track Standards. Types of Track Standards Design Maintenance Safety.
“Analysis of Pavement Condition along Ramon Magsaysay Boulevard by Pavement Distress Approach” Bachelor of Science in Civil Engineering Major in Transportation.
The “Top Down” Approach of Diagnosing Below Rail Problems
Six Sigma Greenbelt Training
ZETA-TECH Associates, Inc.
Chapter 12 Understanding Research Results: Description and Correlation
Inspection Davenport IA
Permanent Way.
Roadway Pavement Management Plan
Rating Grade Separations
Pavement condition index calculation
Board of Commissioners Meeting
Fire Door Inspections Qualified Training
Monte Carlo Schedule Analysis
MEGN 537 – Probabilistic Biomechanics Ch.3 – Quantifying Uncertainty
UNIT I – RAILWAY PLANNING. PERMANENT WAY A System of rails fitted on sleepers which rest on ballast and everything supported by a sub- grade is known.
Statistics 1: Introduction to Probability and Statistics
Rail fixtures & fastening
Measuring Success How to use simple bug database queries and reports
Understanding How the Ranking is Calculated
Definitions Cumulative time to failure (T): Mean life:
Presentation transcript:

Version RAILER SMS Track Structure Condition Index (TSCI)

TSCI Significance Based on routine visual track inspections. Reflects the track segment’s current ability to support routine traffic. Indicates the maintenance and repair (M&R) requirements for restoring or sustaining the track to an acceptable condition.

TSCI Scale GOOD SATISFACTORY FAIR POOR VERY POOR SERIOUS FAILED

Component Group Interaction

TSCI Relationship to Component Groups Index for each component group.  RJCI - Rail & Joints Condition Index  TCI - Tie Condition Index  BSCI - Ballast & Subgrade Condition Index Compile component group indexes into an overall TSCI. TSCI = f(Rail & Joints, Ties, Ballast & Subgrade)

RJCI, TCI, BSCI Experts 22.5 years of experience (average) Over 13,000 data points A mathematical calculation for quantifying the mean subjective rating of a group of railroad track experts with many years of experience.

Weighted Deduct-Density Model Degree of deterioration is a function of: Types of Distress Severity of Distress Amount (Density) of Distress

Model Mathematics

Deduct Curve Concept

Severity Level Descriptions Low (L) Minor distresses that do not affect train operations. Routine M&R can be scheduled for accomplishment. Medium (M)Distresses that may or may not cause an operating restriction on the track. M&R should be scheduled for accomplishment. High (H)Distresses that generally would cause an operating restriction on the track. M&R must be accomplished to remove the restriction. Very High (VH)Distresses that prevent train operations or place a very severe operating restriction on the track. M&R must be accomplished to restore train operations.

RJCI Distress Types R1 - Rail Defects R2 - Joint Defects R3 - Hold-Down Device Defects R4 - Tie Plate Defects R5 - Gauge Rod Defects R6 - Rail Anchor Defects

R1 Defect Examples Low (L) Flaking, Overflow, Slivers, etc. Medium (M)Bolt Hole Crack 0.25”, etc. High (H)Bolt Hole Crack > 0.25” and 2.0” and < 4.0”, etc. Very High (VH) Bolt Hole Crack > 1.5” or breakout, Complete Break, Head Web Separation > 3.0” or breakout, etc. Measurement: Each rail. Count the number of times a defect occurs in rail, except for low. Density = # of affected rails with given # of defects Total # of rails

Example R1-VH Defect

R1-L Deduct Curves

R1-M Deduct Curves

R6 Defects Severity Levels: N/A Defects: Improperly positioned, loose, or missing Measurement: Each anchor Density = # of defective anchors / Total # of ties x 4

Example R6 Defect

R6 Deduct Curve

RJCI Correction Curves

TCI Distress Types T1 - Single Defective Tie T2 - Isolated Defective Tie Cluster T3 - Isolated Defective Tie Cluster that Includes One Joint Tie T4 - Adjacent Defective Tie Cluster T5 - Joint Tie Cluster T6 - Missing Tie T7 - All Joint Ties Missing T8 - Improperly Positioned Tie

T2 Defects Low (L) Two-in-a-row Medium (M)Three-in-a-row High (H)Four-in-a-row Very High (VH) Five-in-a-row Measurement: Each occurrence. Density = Each occur x # SL / Total Tie # Notes: 1) A cluster is isolated if two or more good ties separate clusters. 2) If more than five ties in a row are defective, distress T4 pertains and divide into groups of five, plus what’s left.

Example T2-M Defect

T2 Deduct Curves

BSCI Distress Types B1 - Dirty (Fouled) Ballast B2 - Vegetation Growth B3 - Settlement of Ballast and/or Subgrade B4 - Hanging Ties at Bridge Approach B5 - Center Bound Track B6 - Pumping Ties B7 - Alignment Deviation B8 - Insufficient Crib/Shoulder Ballast B9 - Erosion of Ballast B10 - Inadequate Trackside Drainage B11 - Inadequate Flow through Drainage Structures

B2 Defects Low (L) Vegetation present Medium (M)Interferes with inspection High (H)Interferes with train ops Very High (VH) Prevents train ops Measurement: Linear feet of affected track. Density = Affected track length / Total track length

Example B2-M Defect

B3 Defects Low (L) Profile: >0.75” and 0.50” and 0.50” and <1.75” Medium (M)Profile: >2.25” and 1.50” and 1.75” and <2.25” High (H)Profile: >2.75” and 2.25” and 2.25” and <3.00” Very High (VH) Profile, Crosslevel, and Warp: >3.00” Measurement: Linear feet of affected track. Density = Affected track length / Total track length

Example B3-M Defect

B3 Deduct Curves

TSCI Equation TSCI = 0.50(Lowest) (Middle) (Highest) “Lowest” is the lowest numeric value of the RJCI, TCI, and BSCI. Likewise for “Middle” and “Highest.” Derived from regression analysis.

TSCI Correlation

Indexes Viewed in RAILER

Summary The TSCI measures track condition and deterioration rates based on routine visual track inspections. The TSCI is a function of the RJCI, TCI, and BSCI. The TSCI reflects the ability of a track to support routine expected traffic and loads. The TSCI reflects the subjective numerical ratings of a group of track experts.