Here we continue in the chapter on Lean Systems

Slides:



Advertisements
Similar presentations
© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Advertisements

A Multiperiod Production Problem
Lean Manufacturing.
Lean Systems 1. Some history After WWII the US population grew faster than before. The growing population lead to a high demand for goods and services.
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
1 The Normal Distribution and Microsoft Excel. 2 Say a company has developed a new tire for cars. In testing the tire it has been determined the distribution.
UNBALANCED LOADS Bain AND Boon To Inventory Management.
Facilities and Aggregate Planning. A digression I am not an advocate of gambling, but use an example here that you might draw on later. Say I have a coin.
COUNTING AND PROBABILITY
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Annuities and Sinking Funds
Q. 9 – 3 D G A C E Start Finish B F.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Chapter 14 JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Use of Physical Simulation, Computer Simulation and a Common Product in a Series of Courses to Illustrate Industrial and Manufacturing Engineering Technology.
Process Selection.
Five Steps to Lean 1. Define end-customer value for a specific product specific capabilities specific price specific time 2. Identify entire value stream.
Advanced Pricing Ideas 1. 2 We have looked at a single price monopoly. But perhaps other ways of pricing can lead to greater profits for the sports team.
Example 14.3 Football Production at the Pigskin Company
1 Binomial Probability Distribution Here we study a special discrete PD (PD will stand for Probability Distribution) known as the Binomial PD.
Monopsony Monopsony is a situation where there is one buyer – you have seen Monopoly, a case of one seller. Here we want to explore the impact on the.
1 Game Theory Here we study a method for thinking about oligopoly situations. As we consider some terminology, we will see the simultaneous move, one shot.
1 The Basics of Regression Regression is a statistical technique that can ultimately be used for forecasting.
1 Hypothesis Testing In this section I want to review a few things and then introduce hypothesis testing.
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
Summary: Review of Lean Principles
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
Independent Demand Inventory 1. Inventory Firms ultimately want to sell consumers output in the hopes of generating a profit. Along the way to having.
JIT and Lean Operations
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Basics of Lean How to See and Eliminate Waste Slides courtesy of Doug Fingles, MERC.
Process Improvement Strategies Takt Time Future State Value Stream Map
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
Chapter 7, Lean Thinking and Lean Systems
Takt Time Training Pack.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Lean Production - Objectives
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Just-In-Time & Lean Systems
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
1 9/23/2015 MATH 224 – Discrete Mathematics Basic finite probability is given by the formula, where |E| is the number of events and |S| is the total number.
Chapter 4 Process Design.
Are You People Ready for Lean? Presented by Doug Howardell.
Value Lecture 10 This lecture is part of Chapter 5: Becoming a Millionaire.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Chapter Two Manufacturing Costs and Job-Order Costing Systems.
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Process Characteristics
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
Lean Manufacturing Line Demonstration This short PowerPoint presentation is designed to give the reader an example of how a Lean/Pull system operates.
Shelve more with less – with Lean Nancy Kress University of Nevada Las Vegas.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
LOGISTIC GROWTH.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
Lean Production Strategy Lean Manufacturing Strategy
CHAPTER 9 Lean Manufacturing.
A Multiperiod Production Problem
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Synchronous Manufacturing and Theory of Constraints
Value Stream Mapping GEOP 4316.
Round 1 Debrief - PM What worked? What didn’t work?
Productivity Improvement.
Process Improvement Strategies Takt Time Future State Value Stream Map
讓價值流『精實』 消除浪費.
Presentation transcript:

Here we continue in the chapter on Lean Systems

Master Schedule Side story – I like to play golf and recently I have been playing golf badly (I think I need new grips because the clubs are flying out of my hand!). I called the pro to get a lesson. He said I do things that do not help in hitting the ball. In other words, I do not have a lean swing! Probably more than you want to know, but when I swing the club back I go so far back that I start to lose balance and then hit bad shots. He didn’t say it, but I will remember the phrase, “keep it lean!” Well the master schedule, or final assembly schedule, is a key feature of the lean system because it is the production plan. Let’s look at an example from the book.

Master Schedule Say over the next month it has been determined that 10,000 units of good A, 5000 units of B and 5000 units of C are needed. If there are 20 days of production in the month then on each of the 20 days: 10000/200 = 500 of A 5000/200 = 250 of B 5000/200 = 250 of C will be made. Now, in a lean system production will NOT have all 500 of A made first and then 250 of B and 250 of C. The production will be mixed and the sequence that will occur in this example is 2 of A, 1 of B and 1 of C. And then the cycle will be repeated. While this may seem odd, the costs of production are balanced across the system.

Master Schedule Again, on each day production requires 500 A, 250 B and 250 C. If you go to Microsoft Excel and put in the numbers 500, 250 and 250 in separate cells you can then call of the GCD function (the greatest common denominator function) to find the great common denominator of the three numbers. As you might guess here that number is 250. (Other situations may not have as obvious of a result.) (If you have the 3 numbers in cells A1:A3 then in cell A4 type =GCD(a1:a3)) Dividing each of the daily production requirement amounts by the GCD gives you the amount of each good in the sequence: 500/250 = 2 of A, 250/250 = 1 of B and 250/250 = 1 of C.

Takt time Takt is the German word for the baton the orchestra director uses to keep the musicians on beat. In lean production it is the time between successive units of production. In a lean system the takt time should be set equal to the average demand rate of the market to match production with demand and thus minimize inventories. Takt time = time available for production divided market demand in that time. Example – say there is 420 minutes of production in a day and demand in the day is 1000 units, then takt time = 420/1000 = .42 minutes per unit. 60 seconds times .42 minutes is 25.2 seconds per unit.

Kanban Kanban is the method of production authorization and materials movement in a lean manufacturing system. Let’s define n = total number of containers in a production area D = the demand rate of the using work center C = container size in number of parts usually less than 10% of daily demand T = time for a container to complete an entire circuit, also called the lead time – there is set-up, the container is filled, may sit waiting, moved, in use and returned to be filled again. It is true that n needs to be n = (DT)/C

Kanban As an example, say demand at the next work station is 2 parts per minute and a standard container hold 25 parts. Also say it takes 100 minutes for a container to make the circuit. The number of containers needed is n = ((2)(100)/25 = 8 The maximum inventory would be the nC = DT, since the most that can happen is to have all containers full. Note if the size of the container is changed more or fewer containers might be needed, depending on the new size. Plus, if the lead time (which includes set-up) changes more or fewer containers will be needed. The author stresses lead time should be reduced so in that sense fewer containers would be needed.

Problem 2 page 118 Suppose a lean work center is being operated with a container of size 25 units and a demand rate of 100 units per hour. Also, assume it takes 180 minutes for a container to circulate. How many containers are required to operate this system? By using the formula n = DT/C, the number of containers required is: (3 × 100)/25 = 12 containers Note: 180 minutes = 3 hours  B) How much maximum inventory can accumulate? The maximum inventory is simply the container size times the number of containers: 12 x 25 = 300 units C) How many Kanban cards are needed?  Each container will have 2 Kanban cards, one production card and one withdrawal card, so 12 x 2 = 24 Kanban cards are required.  

Lean Thinking Womack and Jones extended lean production to what they called lean thinking. Lean thinking has 5 elements: -specify value from the customer’s point of view -create a value stream map and remove waste -flow the product or service through the system -pull the product or service from the customer -strive for perfection, where perfection here means an affordable product or service, delivered rapidly and on time, that meets the customers’ needs.