Albury Mill Biomass/Gas Cogeneration 3 March 2011.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
An update on the Central Coast Water Corporation.
The National Smartcard Project Richard Tyndall Director, Edge Smartcard Project on behalf of Michael Gates National Smartcard Project Manager.
ELECTRIC CAR SCHEME SUMMARY In March this year, South Lanarkshire Community Planning Partnership received funding from the Scottish Government’s Low Carbon.
A Case Study on a Rice Husk Cogeneration Power Plant
Heysham South Wind Farm Update May Key Facts Final Layout -3 turbines, 80m to hub, 125m to blade tip -Up to 7.5MW -Electricity for 4,200 homes,
Mod 0273: 1 st Development Group Workshop 4 th February 2010.
East Midlands Councils Regional Retrofit – a model Emily Braham, LHA-ASRA Ellie Horwitch-Smith, NCH.
Southwark’s New District Heating Network.
CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
FROM STILL-LIFE TO LIFE International Workshop Torino, November 10 TH Politecnico KEITH SUTHERLAND – Belfast City Council.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Impacts of the HazWaste Fund on Hazardous Waste in Victoria Jérôme Fakhry.
YEAR 10 WORK EXPERIENCE 7 th to 11 th July Phase 1  Students should start looking now for their own work placement.  If you receive a positive.
© British Gas Trading Limited 2014 In association with: Community energy for local authorities and housing associations Anthony Collins Solicitors LLP.
THE SUGAR INDUSTRY AT A GLANCE
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
© 2012 Firstgreen Consulting Corporate Credentials Oct 2012.
Fair Head Tidal & West Islay Tidal An overview of the consenting process Fourth Annual HMRC Forum 24 th April 2013 Clodagh McGrath: Environmental Manager.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
WPD Connections Overview
Cork Screen Commission - Creating a truly film friendly destination.
by Mr. V.S. Verma Member (Planning) Central Electricity Authority
The Preparatory Phase Proposal a first draft to be discussed.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
1 The Lockheed Martin India Innovation Growth Program
CLEANER ENERGY for a Greener future CLEANER ENERGY for a Greener future Laidlaw Energy Group, Inc. 90 John St 4 th Fl New York, NY
RODDA COBURN & CO CUSTOMS AND INTERNATIONAL TRADE CONSULTANTS Customs Duty Concessions Item 71 Project By-Law Enhanced Project By-Law Scheme (EPBS)
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
UKERC UK Energy Research Centre UK ENERGY RESEARCH CENTRE ACTION UK Advanced Power Generation Technology Forum 25 November 2004 Jim Skea, Research Director.
Carbon Green Group Energy Saving Solutions. Carbon Green Group  Provides energy saving solutions:  For commercial businesses  Using quality electrical.
Greening the Energy Supply Monga Mehlwana Tuesady, 05 October 2010.
Unleashing Innovation: EDF Partnerships in Sustainability Council of State Governments National Conference December 2, 2012 Colin Meehan Clean Energy Analyst.
Let Ascension take your business to new heights Tender Manager Scott Warnock Andrew Smillie.
New Community Athletic Stadium Opening at Heslington West September 2014.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
Station Square EI scheme Response to: Request de.
ICOS status report, Oct The current Carboeurope atmospheric network Stars = vertical profiles Blue circles = continuous observatories Yellow diamonds.
Jandakot Bioenergy Plant Commercially-viable bioenergy from foodwaste: an Australian success story at Richgro Garden Products November 2015 Joseph Oliver.
In a small town, there are 2 industries: an electric company and a gas works electric Town gas.
Biomass Heating and the Renewable Heat Incentive.
1 Louisiana: Our Energy Future 2009 American Recovery & Reinvestment Act.
Public Value Review of services for people with learning disabilities Andrew Price & Simon Laker, PLD Commissioning, Adult Social Care February
NORTHERN TERRITORY TREASURY NT SUPERANNUATION OFFICE Northern Territory Government Death & Invalidity Scheme Amendments.
INFINEON– Case Study by Mindspeed Communications.
Case Study By Clive Bonny Commercial feasibility For
Please see attached sheet for BDRA social events Next Marie Curie Coffee Mornings: Monday 21 st December 10.30am to 1230pm, Monday 18 th January and Monday.
DUBLIN WASTE TO ENERGY - Project Update Matt Twomey Dublin City Council.
Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence.
Building the Best Team that Delivers and that Investors Love TEAMWORK MAKES THE DREAM WORK:
Birmingham Basic Need Workshop - March 2015 Jaswinder Didially – Senior Officer Education and Skills Infrastructure Birmingham City Council Meeting Increased.
PANEL MODERATOR TIHOMIR SIMIĆ Chairman International Forum for Clean Energy Technologies.
Power sector construction in Russia Development forecasts for by PMR Explore all reports for “Power”
Commission of Inquiry into achieving best value in the procurement of construction. Andrew Smith Chair of NIEP Board National Improvement and Efficiency.
1 Water Services Training Group 20 th Annual Conference Meeting Standards and Expectations in the Water Industry Lyrath Estate Hotel, Kilkenny.
Data Center Stabilization
York, North Yorkshire & East Riding Local Enterprise Partnership Bio-economy Growth Fund Application process September 2016.
EPA’S New Source Performance Standard (NSPS)
A Case Study on a Rice Husk Cogeneration Power Plant
Xoserve IX Refresh Customer Update 30/10/2018.
QUADRANT PHASE 2 BIRCHWOOD PARK Performance & Investment Committee
Maryland Offshore Wind Developments
Presentation transcript:

Albury Mill Biomass/Gas Cogeneration 3 March 2011

2

3 5. Project Benefits – Phase 1 –CO2 reduction of 15% or 107,000t CO2 per annum –Mill steam supplier –No internal manning changes –Creation of 5 external jobs in biomass supply chain –Up to 100 construction jobs –75% less natural gas than used now –No upgrade to gas network is required for this phase –Part of the current gas network is available for Albury City Council Planned Industrial Hub project –8 MW generated on-site, Exempt from AEMO 6 MW green generation 2 MW gas generation

4

5 5. Project Benefits – Phase 2 –Phase 1 benefits plus, –CO2 reduction by a further 16% or 115,000t CO2 per annum –Total CO2 reduction is now 31% or 222,000t CO2 per annum –All of the current gas network is available for Albury City Council Planned Industrial Hub project* –33 MW generated on-site, 6 MW green generation 27 MW gas generation * Requires new high pressure gas pipeline infrastructure

6 5. This Stage Deliverables ▪ The expected deliverables of this stage 3 Phase 1 are as follows: –Planning approval completed –EIS completed and approvals underway –Detailed design completed –TransGrid connection agreement completed –Commercial arrangements in place including for biomass supply –Construction contractor appointed –Major equipment suppliers selected and agreements in place –Preliminary equipment orders placed –Government funding agreed –Re-confirmed business case –Toll gate submission –Board report and submission –To be completed by 31 December 2011

7 For further project information please contact: Mr Michael Machin Environment and Business Development Manager Albury Mill Ph (Office) (mobile/cell phone)