INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 1 INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ SP A3 Change of DoW Summary & Rational Approach.

Slides:



Advertisements
Similar presentations
1 Financial Procedures in FP7 Projects Reporting and Audits Karolina Lis Research Assistant DCU, Finance Office
Advertisements

University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 1 INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ Review Meeting 07-08/04/2011 Brussels FEV Motorentechnik,
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 Framework Programme 7 Guide for Applicants
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
INGAS - Integrated GAS Powertrain 24 months Meeting, October, 2010 Project number: October 2010 Project number: October.
„Boosted Lean Burn Gas Engine“
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Proposal for a new UNECE regulation on recyclability of motor vehicles Informal Document GRPE Reply to the Comments of the Russian Federation Informal.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
API-OGP Joint Task Force Update 2013 Exploration and Production Standards Conference on Oilfield Equipment and Materials Dan Mueller ConocoPhillips Vice-Chairman.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
INGAS General Assembly, Brussels, 27&28 October 2010 INGAS INtegrated GAS Powertrain 1 INGAS 24 months meeting Brussels, 27&28 of October 2010 General.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 69 Geneva, 05 June 2014 Informal document No. GRPE (69th GRPE,
-1- ANALYSIS OF POTENTIAL INCREASES IN ENERGY EFFICIENCY FOR PISTON COMBUSTION MACHINES WITH UNCONVENTIONAL GEOMETRY ICSAT conference Dr.-Ing. Andreas.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
INGAS 18 months Meeting, Paris, May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Status (month 13-18) K. Roessler,
Taking stock and next steps CCWG F2F, 23 March 2015.
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
INGAS “24 Months Meeting ”, “Brussels, Belgium”, “27-28 October 2010” INGAS INtegrated GAS Powertrain 1 INGAS 24 months meeting Brussels - Belgium 27 -
INGAS meeting, Naples, Nov INGAS INtegrated GAS Powertrain 1 Continental Automotive GmbH Advanced development (AD) at INGAS SPA2 Meeting
Status of QUACO project
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
NWPP Multiple-Award Technical Support Contract (eff. 08/2005) Unit 9 Unit 9 “Modifying the Task Order”
Project Procurement Management
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April 2011 INGAS project – Year 2 Review Meeting.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
Introduction to Revision of GTR 7
INGAS - Integrated GAS Powertrain 18 months Meeting, Paris GdF Suez May, 2010 Project number: May 2010 Project number:
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB (42nd GRB, 5 – 7 September.
INGAS 12 months Meeting, Naples, 5-6 November 2009 INGAS INtegrated GAS Powertrain 1 12 Month Meeting Naples, Subproject B2, Status AVL (month 7-12) Marko.
Task Force on Electro-magnetic Compatibility (TF EMC) Status report of TF to GRE-75 Friday, 8 April 2016 Informal document GRE (75 th GRE, 5-8 April.
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
GFV-TF – amendments to R49 "OBD for EURO VI gas-fuelled engines" UN-ECE GFV informal group Task-Force "OBD for gas fuelled engines" Status Report to GRPE.
13/01/2011 UNECE-GRPE-GFV-HDDF1 Heavy-Duty Dual Fuel (Diesel-gas) Regulation brief status report January 2011 GRPE Geneva 13 January 2011 Full report (informal.
Deliverables, final review and final reporting
Work Package 11 Name David Giaretta Institution APA/STFC
Contracting Officer Podcast Slides
EU Regulation on AVAS requirements
Session II: System authority for ERTMS 4RP Trackside approval
Informal document GRPE-74-20
Informal document GRPE th GRPE, 9-12 January 2018
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Comments on WLTP documentation
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
DG Environment, Unit D.2 Marine Environment and Water Industry
Review of the 1958 Agreement
New EU Regulation on General Safety Implementation of Tyre Aspects
Contractual and Regulatory Framework
Presentation transcript:

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 1 INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ SP A3 Change of DoW Summary & Rational Approach 01/06/2010

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 2 Summary Subproject A3 was planned and started with the common understanding between all A3 partners and CRF (as main IP coordinator) that a parallel approach in terms of base engine will be pursued. This means: FEV uses a 1.9l Diesel based engine GMPT-G uses a 1.6l Gasoline based engine (parallel study) Rational for the parallel approach The "parallel study" which focuses on the investigation of the potential of a 1.6l CNG (gasoline- based) engine was well aligned and related to the main stream activities (1.9l Diesel engine) since it follows the same boundary conditions in terms of a high-boost and ultra-lean combustion concept. From base engine perspective the 1.6l gasoline based engine offers an increased peak pressure capability of about +30bar – i.e. improved suitability for the combustion concept. Also the same aftertreatment system / philosophy was planned to be used for both engine concepts. The mainstream activities are being performed on the basis of a 1.9l Diesel engine (as base engine in the light duty vehicle Opel “Zafira”). This engine offers great capabilities to cope with the expected increased cylinder pressures since it is principally laid out for higher maximum allowable boost and peak cylinder pressures as well as compression ratio. But, it has also some (considerable) disadvantages which may prevent from achieving the maximum feasible CO2-reduction.

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 3 Summary - continued Therefore it was decided to pursue an alternative technical path in parallel to the main concept to evaluate the potential (advantages) of a smaller gasoline based engine as there are: - Lower weight - Lower friction / parasitic losses (e.g. bearing losses) - Lower cost - Combustion chamber better suited for gasoline / CNG combustion - More flexibility in generating charge motion and gas exchange (dual independent cam-phasers) - Higher possible engine speeds (compensates for smaller displacement and lower torque and lower peak-pressures) The adopted 1.6l gasoline-based engine concept allows also the evaluation of the benefit of downsizing.

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 4 Summary - continued The potentials of the two concepts with their inherent advantages / disadvantages as mentioned above could then be compared with regard to (in vehicle) performance, F/C and emissions. Both paths could not be realized in one single engine concept for cost and technical complexity reasons. This approach has been reported in the status reports from beginning and was also presented during the „12 Month Meeting in Naples“ in Nov – the approach was never questioned until EC reviewers commented on the 12 months report that the work on the 1.6l gasoline engine might not be accepted. Issue The alternative „parallel“ path of using a 1.6l Gasoline based engine was not taken over from the initial application documents into the final official description of work (DoW) (ANNEX I). The mutual understanding however was that the DoW has to be interpreted for both base engines (using a Diesel and a Gasoline base engine). However, this was only communicated verbally! Now, after the feedback on the 12 months report the Commission rejected the activities / support for the parallel study „1.6l gasoline based engine“ as being „extra content“. Even the attempt to clarify / justify the importance of the 1.6l gasoline based apporach as described above was not accepted (Meeting at Brussels, March 31st). Taking this rejection into account different project options for GMPT-G were discussed and parts of the work at GMPT-G had to be re-evaluated for the remaining project duration. As a reaction of the changed boundary/funding conditions GM is unfortunately forced to pull out all 1.6l gasoline engine based activities.

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 5 GMPT-G options for EU funded InGas Project: As discussed and rated by GMPT-G internally (Apr. 23rd 2010) Option 1: Continue w/o funding -> underfunding 400k€-X -> recommendation: No! Option 2: Change all activities to 1.6 MGE - 2 additional MGE needed (not available; IP issues) -> recommendation: No! Option 3: change to 1.9l Diesel -> no use (redundant work) -> recommendation: No! Option 4: FEV continues with 1.9l + basic support by GMPT-G acc. to DoW / change of DoW no further work possible on 1.6l MGE (rejection of 1.6l parallel study by EU Project Officer; Mar. 31st 2010 )! Option 5: STOP all activites and exit project. -> recommendation: No! Overall recommendation: Option 4 DoW = Description of Work (official contract ANNEX1) MM = Man Months MGE = Midsize Gasoline Engine

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 6 In a following step the affore mentioned project options were dicussed in a face to face meeting between FEV and GMPT-G (Apr. 28th 2010) Common understanding is that „Option 4“ is the most favourable option. Based on this, the remaining activities according to the DoW (ANNEX1) were modified accordingly. Next steps A document which describes the modifications of the DoW will be prepared by FEV. Revision of this document by GMPT-G and FEV is planned for May 7th. (phone conference). The final document (notice of change) should then be discussed with CRF (IP Coordinator) during the „18 month InGas Meeting in Paris“ (May 20th/21st). Finally the notice of change document should be discussed with the PO (Project Officer – representative of the European Commission), CRF, FEV and GMPT-G to get approval. DoW = Description of Work (official contract ANNEX1) IP Coordinator = Lead Coordinator of the InGas Project CRF = Centro Ricerche Fiat

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 7 INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ SP A3 Change of DoW Details 01/06/2010

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 8 Result of 12 M-Review-Meeting / Brussels:  Statement of PO and reviewers, that parallel investigations concerning the diesel-engine based approach (1.9 l) and the gasoline-engine based approach (1.6 l) are not in line with the DoW.  Clear request for clarification of the further proceeding in the SP A3. A3-internal decision (GMPT-G / FEV):  The activities regarding the gasoline-based engine approach will be stopped.  GMPT-G intends to proceed in such an extent, that all outstanding deliverables respective essential support to the A3-partners will be reached. This includes a transfer of work packages as well as budget transfer between A3 partners. Conclusion:  The following slides contain a suggestion for an alternative DoW. In detail a possible shift of MM‘s (task related) from GMPT-G to A3 partners is mentioned. Change of DoW in SP A3 Background

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 9 Change of DoW in SP A3 WP A3.1

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 10 Change of DoW in SP A3 WP A3.1

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 11 Change of DoW in SP A3 WP A3.1 Task A3.1.1:  No changes; completed Task A3.1.2:  No changes; completed Task A3.1.3:  GMPT-G will support FEV using 1 MM Task A3.1.4:  No changes Task A3.1.5:  No changes; completed

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 12 Change of DoW in SP A3 WP A3.2

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 13 Change of DoW in SP A3 WP A3.2

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 14 Change of DoW in SP A3 WP A3.2 Task A3.2.1:  No changes; completed Task A3.2.2:  No changes Task A3.2.3:  No changes Task A3.2.4:  2,5 MM‘s are completed. Remaining 2,5 MM‘s will be used.

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 15 Change of DoW in SP A3 WP A3.3

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 16 Change of DoW in SP A3 WP A3.3

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 17 Change of DoW in SP A3 WP A3.3 Task A3.3.1:  No changes Task A3.3.2:  No changes Task A3.3.3:  No changes Task A3.3.4:  No changes Task A3.3.5:  2 MM‘s had been used (check of applicability of the series EMS for the 1.9 l engine). Transfer of 5 MM‘s to FEV regarding DSPACE-activities. Task A3.3.6:  No changes

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 18 Change of DoW in SP A3 WP A3.4

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 19 Change of DoW in SP A3 WP A3.4 Task A3.4.1:  No changes. 2,4 MM‘s will be completed by GMPT-G. Package study and package recommendations finally will be documented.  Change: FEV buys vehicle. GMPT-G transfers the corresponding budget. Task A3.4.2:  GMPT-G transfers 13 MM’s. Task A3.4.3:  GMPT-G transfers 3 MM’s.

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 20 TaskContent / DescriptionMM (DoW) MM (Done) Open (June 2010) Remaining at GM Transfer to FEV 3.1.3Support Gas Storage => FEV Draft Packaging Packaging52, Control Strategy Vehicle Procurement2,41,90, Vehicle Calibration and Testing Potential Evaluation3003 Change of DoW in SP A3 Summary of MM-transfer from GMPT-G

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 21 DAContent / Description 3.31 Engine will be delivered (if needed) 1 Gear box (2 nd gear box will be delivered, if needed) 3.8Vehicle Procurement  Anticipated solution: FEV will buy the vehicle 3.9 Report (Potential Evaluation)  Will be done by FEV Change of DoW in SP A3 Open GMPT-G

INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 22 Change of DoW in SP A3 Consumables and other major cost items GMPT-G DescriptionPlan (DoW)UsedOpen (June 2010) Remaining at GM To be transferred Engines Gearboxes20010 Spare Parts Fuel Workshop CAD / CAE Stations3000 Vehicle Testing5000 Bench Engine Testing60 00 Transfer of consumables/cost items preferably should be done to FEV, because it is closed linked to work/MM-transfer.