Dublin Port Tunnel Xiaowei Jin, Xinni Wang, Mingqiu Mao.

Slides:



Advertisements
Similar presentations
Glaciers Chapter 8, Section 2.
Advertisements

A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
Mantas Enceris Athar Aziz
GROUND TREATMENT WORKS COMPENSATION GROUTING FARRINGDON STATION Client: CrossRail Main Contractor: BFK (Bam-Ferrovial-Kier JV) Site Location: Farringdon.
Yellow River Diversion Project Use of Tunnel Boring Machines to Divert the Yellow River, China John Train & Philippa Reed.
Soil 1 – Rock Types.  There are about 6.8 million hectares in Ireland.  25% of this area is covered with cities, roads and buildings etc. so the remaining.
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
Project details • New headquarters for HKSB
- The interaction of the world’s tallest building with the geology of the Basin the city is built in By Matthew Timmis and Mark Banham.
Sedimentary Rocks Chapter 4-3 Rocks made of bits & pieces of other rocks.
Sedimentary Rocks Chapter 4 Section 4.
Charlotte Gibson Andrew Illingworth Jon Elliott. Content  Geology of the area.  Problems.  Engineering Solutions.
The Phantom Science: How Geology Created The Phantom Science: How Geology Created the Amazing Natural Resources of Central Texas the Amazing Natural Resources.
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
Northumberland Strait Crossing Confederation Bridge New Brunswick, Canada Will Astley Jonathan Richards.
Rion-Antirion Bridge, Greece. Presented by James Mitchell, Dan Bundy and Hung Nguyen.
Geological Problems Encountered and Solutions Implemented
Lecture 3 Earthmoving Materials
Honey, I shrunk the glacier. Extent of ice during Pleistocene glaciations.
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
Soils Investigation Soil Investigation
Geotechnical investigation and risk assessment at Budapest metro line 4 Dr. Tibor Horváth Geovil Ltd. INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND.
Chapter 18 Foundations.
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
Foundation Engineering CE 483
CANDY LAND A Study of Ohio Topography CANDY LAND A Study of Ohio Topography Tim Herrmann, Haley Todd, Justin Yeazell GEO 204 Dr. Michael Sandy April 25,
Sources of water (RAIN)
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
Presented by: 1. A measure of how easily a fluid (e.g., water) can pass through a porous medium (e.g., soils) 2 Loose soil - easy to flow - high permeability.
Department of Civil Engineering,
Prepared by: Marcia C. Belcher Construction Engineering Technology.
Erosion by Glaciers. A glacier is Any large mass of ice that moves slowly over land Think of it as a moving river of ice and snow.
9. Seepage (Das, chapter 8) Sections: All except 8.2, 8.6, 8.7, 8.8, 8.9.
RIVERS AN INTRODUCTION.
The Geological History of Toronto and the GTA. Toronto’s Geological History The oldest rocks in southern Ontario are up to 1.5 billion years old and are.
13 Surface Water 13.1 Streams and Rivers
Sedimentary Rocks Chapter 4 Section 4. Sedimentary Rocks Sediments are loose materials like rock fragments, mineral grains, and bits of shell. Sediments.
Stream Erosion and Transport
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
GLACIERS A glacier is: Any large mass of ice that moves slowly over land Any large mass of ice that moves slowly over land.
Changing Earth’s Surface
Glaciers. Geologists define a glacier as any large mass of ice that moves slowly over land. There are two types of glaciers: Continental glaciers Valley.
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
Landforms and Landmasses of Canada
SOIL MECHANICS-1 DEEP FOUNDATIONS PRESENTATION TOPIC MEMBERS O8-CE-29
Soil And Rock General Soil Characteristics Trafficability – ability of soil to support weight of vehicles under repeated traffic –Controls traffic on unimproved.
Cincinnati in 1840 – before the hillsides could be settled.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Erosion and Deposition
How The Last Ice Age Shaped Canada
Protection of ground water meeting UPUS Determining ground water zones – Ground water definition – Determining how many zones Examples POGWMUPUS and GW.
Understanding Soil Formation. Five different factors that affect soil formation 2. Topography -the slope characteristics of the soil 1.Parent material.
Glaciers Explain how glaciers move.
Chapter 8 Erosional Forces Section 8-2 Glaciers Note Guide.
Erosion & Deposition Notes…Part 2…Glaciers! M. Manzo
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
Chapter 4 Marine Sedimentation ©2003 Jones and Bartlett Publishers.
PILE FOUNDATIONS UNIT IV.
Branka Bračič Železnik 1, Barbara Čenčur Curk 2 THE INFLUENCE OF CLIMATE VARIATIONS ON NATURAL BACKGROUND OF NITRATE IN PERCOLATED WATER 1 Public Water.
Water Erosion “We’re changing Earth’s Surface!” A. Stream Erosion 1. Running Water 2. Energy 3. The water cycle -Most effective agent in wearing down.
EBS101 ENGINEERING GEOLOGY DR HAREYANI ZABIDI
Introduction to | Soil Science Presented by: Mr. Brian Oram, PG, PASEO Wilkes University GeoEnvironmental Sciences and Environmental Engineering Department.
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
EXAMPLE A 400 m2 (40 x 10 m) area is to be excavated, 1 m deep, with side slopes 2:1. As the width (10 m) is less than 30 times the depth (30 x 1 m), the.
Unit 2: Introduction to Sequence Stratigraphy
Section 1: Surface Water Movement
THE FAILURE OF SHIH-KANG DAM
N.N.Som Consulting Geotechnical Engineer
Figure 1 – Soil Boring Locations
Constructive Forces and the Earth’s Layers
Presentation transcript:

Dublin Port Tunnel Xiaowei Jin, Xinni Wang, Mingqiu Mao

Introduction in Dublin, Ireland connects to the M1, part of the M50 relieves surface road congestion in Dublin city center the twin tunnels June 2001–2006, €752 million

Geological condition Bedrock in the Dublin area is a thin to medium interbedded homogenous grey argillaceous limestone and calcareous shale. Over much of the city, it is overlain by glacial deposits, known as Dublin boulder clay.

Geological condition Boulder Clay has a widespread distribution across central Dublin. It has traditionally been divided into two strata, an upper Brown Boulder Clay and a lower Black Boulder Clay for engineering purposes, the upper unit being a weathered facies of the lower. These sediments can vary greatly in thickness, from a few metres to upwards of 20m. The till contains water-bearing lenses of sand and gravel.

Problems The changing geology, boulder clay, limestone, clay, sands and gravels, can cause differential settlements The excavation influences onto the adjacent roads the diaphragm walls need to be supported as the depth of the excavation A comprehensive drainage system is needed

Overview The tunnel is built in five section: Two bored section Two “cut and cover” section A specialised pipe jacked section

Solution1 TBM Two TBMs are adopted TBM1 Progress per day10 to 12m average length2.6km geologyCarboniferous limestone Volume spoil excavated0.5 million cubic meters

Solution1 TBM TBM2 Progress per day2 to 3m average length800m geologyDublin boulder clay Volume spoil excavated71,000 cubic meters

Solution2 Cut and Cover The “cut and cover” sections: -The southern section is 500m long at Fairview -The northern section is 1500m from Whitehall Church to Shantalla

Solution2 Cut and Cover To secure the sides of the excavation two separate measures are employed -the construction diaphragm -the use of a combination of soil nailing and shotcreting

Thank you! Any question?