RIIO-T1 impact on allowed revenues and network charges 6 September 2012.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Better Regulation workshop on Rate of Return Guidelines
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
HRA Self-Financing Update What it means & what we’ve done Housing Briefing 19 January 2012.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Code Administrators Working Group Introduction 28 August 2008.
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Customer Charge On behalf of all DNs 25 October 2010.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Industry Dialogue on xoserve Services 14 th September 2007.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
European Developments Transmission Workgroup 3 rd May 2012.
Gas Stakeholder meeting for the IM review and DPP reset 8 December 2015.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Draft 2015 electricity distribution price-path reset Briefing for financial market analysts 4 July 2014 Sue Begg Commerce Commission.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Energy Regulation – NZCID Meeting Commerce Commission
Presentation at REEEP Regulatory Forum, 28 September 2004
Interactions with the implementation of RIIO-T1
Fair Go Rates System Dr Ron Ben-David Chairperson
Exit Capacity User Commitment – Transmission Workstream update
Code Governance Review UNC Modification Proposals
RIIO-GD1:network charging volatility
Transmission Workgroup 4th October 2012
RIIO baseline databook Nov 2017 iteration
Fair Go Rates System Dr Ron Ben-David Chairperson
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
Mod 0621 Amendments to Gas Transmission Charging Regime
UNC Transmission Workstream 7th December 2006
Entry Capacity Transfer and Trade
Options for the Development of a Demand Side Response Mechanism
Generic Revenue Driver Methodology
Ofgem presentation to Gas Transmission Workstream
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Commercial Arrangements For Gas Quality Service – Introduction
Capacity Access Review
Presentation transcript:

RIIO-T1 impact on allowed revenues and network charges 6 September 2012

2 Introduction RIIO-T1 will set revenue controls for transmission network companies 1 April 2013 – 31 March 2021 July 2012: We published our Initial Proposals Engagement with stakeholders continues to be important to the process Today’s presentation and discussion aims to: –Focus on the specific RIIO impact set against the wider context –Outline the ways that we and NGG can help manage the impact on charges –Detail the way that revenue will be recovered by NGG including where it relates to a signal for extra capacity Consultation on Initial Proposals closes on 21 September 2012 We intend to publish updated licence drafting in Autumn 2012 Final Proposals December 2012

3 Context NGG’s obligations and allowed revenues are subject to economic regulation to ensure that energy consumers interests are protected To recover its allowed revenues NGG set charges consistent with its charging methodology statement. The methodology is subject to the governance procedures of the UNC and is subject to approval by Ofgem There are factors that affect the level and volatility of gas transmission commodity charges which are independent of our decisions in RIIO-T1 This presentation focuses solely on the expected impact of RIIO- T1

4 RIIO RIIO is different to our previous approach to setting transmission controls Differences include: –Onus is on network companies to develop well-justified business plans – including reflecting stakeholder input –Comprehensive set of outputs against which delivery will be monitored and in some cases financial incentives will be used to encourage higher quality performance –Treatment of capex and opex aligned so that companies choose the most appropriate solution – allowable costs treated as totex –Aims to match returns more directly to the company’s performance –Preset proportion of totex allowed in the year (“fast money”) with the remaining payments spread over life of asset (“slow money”)

5 OUR CONSULTATION ON WAYS TO MANAGE CHARGING VOLATILITY

6 Option Assessment against optimal risk allocation Assessment against other criteria Consultation view 1 Improved information Reduces risk to suppliers No additional cash-flow risk for NWOs Low cost Relatively easy to implement Likely to be beneficial 2 Restricting intra-year charge changes Reduces risk to suppliers Limited additional cash-flow risk for NWOs Reduces complexity Reduces administration costs Likely to be beneficial 3 Lagging incentive rewards / penalties networks recover via allowed revenues Reduces risk to suppliers Limited additional cash-flow risk for NWOs Potentially weakens the incentive regime and signals to investors Likely to be beneficial 4 Lagging adjustments to allowed revenues from uncertainty mechanisms Reduces risk to suppliers Potential additional cash- flow risk for NWOs Potentially weakens signals to investors Universal changes unlikely to be beneficial. May consider changes on mechanism-by-mechanism basis 5 Cap and collar allowed revenue changes Reduces risk to suppliers Potential material additional cash-flow risk for NWOs Introduces complexity to the regulatory regime Could weaken incentive regime and signals to investors Unlikely to be beneficial We consulted on 5 options for mitigating volatility

7 Applying to gas transmission Improved information –Recognise NGGT’s work to identify where stakeholders require better information, including forum such as these –150 days indicative notice period and relationship with annual iteration Restricting charges to 1 April change –Responses were supportive of all charge changes being 1 April, currently capacity charge setting linked to the gas year (from 1 October) –Welcome NGGT leading industry discussion on this Lagging incentives –Where financial incentives are applied, eg stakeholder satisfaction, natural lag built in as performance in year 1 reflected in charges in year 3 Lagging uncertainty mechanisms –Detailed design of mechanisms being finalised for RIIO-T1. Our initial assessment favoured no lag on adjustments but a consideration of individual mechanism requirements Caps and collars –Do not favour this option, and see no reason why our assessment of costs and benefits should be different from other network sectors

8 SETTING REVENUES

9 Setting revenue allowances for future years Licence model calculates allowed revenue for future years - ‘open’ for annual update of some variables Takes in actuals and compares with allowances Formally part of Licence regime reflecting Conditions and Handbook Annual Iteration Run in November each year (so values need to be agreed before) Uses data mostly from regulatory year just ended in March Calculates adjustment to be applied in following year through modification update licence term (MOD) MOD Sum of differences (time adjusted) between i) Recalculated base revenues for all 8 years using this year’s inputs and ii) recalculated base revenues for last year Reflects any changes/corrections to numbers previously used

10 There are two components of MOD. Changes from years prior to the current year which have WACC applied and an updated year t itself. These are added together and compared with FP to calculate MOD MOD term calculation xx + MOD overview

11 Revenue associated with new projects Comparing TPCR4 with NGG business plan and our Initial Proposals The next slide illustrates the different approaches to revenue recovery following NGG’s business plan proposal; our high level approach under our initial proposals; and TPCR4 Annual iteration process should not limit agreement/ signals For example under NGG’s proposal NGG will not be constrained from building in year 2017; at the worst case the funding will be received 1 year in arrears (with financing costs) Our IP approach excludes any financing costs due to NGG for earlier preconstruction expenditure Total revenue will vary each year from that in Final Proposals as we update for actual totex and revised allowances TOTEX approach works whatever the outcome of the current discussion about new commercial arrangements. We are not prejudging the outcome of that process

12 Potential revenue impacts of £50m project Delivery Initiation

13 FURTHER DISCUSSION AND QUESTIONS

14