Www.izmirekonomi.edu.tr Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, 2007 1 of 31 Chapter 3 Aggregate Planning.

Slides:



Advertisements
Similar presentations
C HAPTER Elasticity of Demand and Supply price elasticities of demand and supply, income and cross elasticities of demand, and using elasticity to forecast.
Advertisements

1 Chapter 14 Making the most of things: Linear Programming.
Master Budget and Responsibility Accounting
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Multicriteria Decision-Making Models
PowerPoint Presentation
Measurements and Their Uncertainty 3.1
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Who Wants To Be A Millionaire?
Financial and Managerial Accounting
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Merchandise Planning Systems
Introduction to Cost Behavior and Cost-Volume Relationships
Hedging Strategies Using Futures
Sales and Operations Planning (Aggregate Planning)
An Introduction to International Economics
Copyright © Cengage Learning. All rights reserved.
An Application of Linear Programming Lesson 12 The Transportation Model.
Copyright © Cengage Learning. All rights reserved.
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, Replacement Basics.
Cost-Volume-Profit Relationships
MCQ Chapter 07.
Chapter 10 Money, Interest, and Income
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Capacity and Constraint Management
Capacity and Constraint Management
Chapter 5 Capacity Planning For Products and Services
VOORBLAD.
A Key to Economic Analysis
Master Scheduling and Rough-Cut Capacity Planning
Re-Order Point Problems Set 1: General
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Industrial Facilities Design (7 th Term, Batch 2009)  28/3/2012 11  lectur # 31 & 32.
Elasticity of Demand and Supply
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Equal or Not. Equal or Not
Slippery Slope
Januar MDMDFSSMDMDFSSS
Flexible Budgets and Performance Analysis
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Replacement.
1 Functions and Applications
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Financial.
Operations Management Dr. Ron Tibben-Lembke
IE 3265 Production & Operations Planning
OPSM 301 Operations Management
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
Chapter 3. Aggregate Planning (Steven Nahmias)
ISEN 315 Spring 2011 Dr. Gary Gaukler. Introduction to Aggregate Planning Goal: To plan gross work force levels and set firm-wide production plans, based.
LESSON 8: AGGREGATE PLANNING
1 Chapter 3 Aggregate Planning McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
3-1 Chapter 3 Aggregate Planning McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
©2005 McGraw-Hill/Irwin 3-1 Chapter 3. Aggregate Planning (Steven Nahmias)
Aggregate Planning.
1 AGGREGATE PLANNING Production Planning and Control 2 Haeryip Sihombing Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka.
Production and Operation Managements Professor JIANG Zhibin Department of Industrial Engineering & Management Department of Industrial Engineering & Management.
CHAPTER 3 Aggregate Planning McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
Presentation transcript:

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Chapter 3 Aggregate Planning

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Introduction to Aggregate Planning Goal: To plan gross work force levels and set firm-wide production plans. Concept is predicated on the idea of an “aggregate unit” of production. May be actual units, or may be measured in weight (tons of steel), volume (gallons of gasoline), time (worker-hours), or dollars of sales. Can even be a fictitious quantity. (Refer to example in text and in slide below.)

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 The Hierarchy of Production Planning Decisions

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Overview of the Problem Suppose that D 1, D 2,..., D T are the forecasts of demand for aggregate units over the planning horizon (T periods.) The problem is to determine both work force levels (W t ) and production levels (P t ) to minimize total costs over the T period planning horizon.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Important Issues Smoothing. Refers to the costs and disruptions that result from making changes from one period to the next. Bottleneck Planning. Problem of meeting peak demand because of capacity restrictions. Planning Horizon. Assumed given (T), but what is “right” value? Rolling horizons and end of horizon effect are both important issues. Treatment of Demand. Assume demand is known. Ignores uncertainty to focus on the predictable/systematic variations in demand, such as seasonality.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Relevant Costs Smoothing Costs  changing size of the work force  changing number of units produced Holding Costs  primary component: opportunity cost of investment Shortage Costs  Cost of demand exceeding stock on hand. Why should shortages be an issue if demand is known? Other Costs: payroll, overtime, subcontracting.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Cost of Changing the Size of the Workforce

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Holding and Back-Order Costs Back-orders Positive inventory Slope = C P Slope = C i $ Cost Inventory

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Aggregate Units The method is based on notion of aggregate units. They may be Actual units of production Weight (tons of steel) Volume (gallons of gasoline) Dollars (Value of sales) Fictitious aggregate units

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Example of fictitious aggregate units. (Example 3.1) One plant produced 6 models of washing machines: Model # hrs. Price % sales A K L L M M Question: How do we define an aggregate unit here?

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Example continued Notice: Price is not necessarily proportional to worker hours (i.e., cost): why? One method for defining an aggregate unit: requires:.32(4.2) +.21(4.9) (5.8) = worker hours. Forecasts for demand for aggregate units can be obtained by taking a weighted average (using the same weights) of individual item forecasts.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Prototype Aggregate Planning Example (this example is not in the text) The washing machine plant is interested in determining work force and production levels for the next 8 months. Forecasted demands for Jan-Aug. are: 420, 280, 460, 190, 310, 145, 110, 125. Starting inventory at the end of December is 200 and the firm would like to have 100 units on hand at the end of August. Find monthly production levels.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Step 1: Determine “net” demand. (subtract starting inv. from per. 1 forecast and add ending inv. to per. 8 forecast.) MonthNet Predicted Cum. NetDays Demand Demand 1(Jan) (Feb) (Mar) (Apr) (May) (June) (July) (Aug)

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Step 2. Graph Cumulative Net Demand to Find Plans Graphically

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Constant Work Force Plan Suppose that we are interested in determining a production plan that doesn’t change the size of the workforce over the planning horizon. How would we do that? One method: In previous picture, draw a straight line from origin to 1940 units in month 8: The slope of the line is the number of units to produce each month.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Monthly Production = 1940/8 = or rounded to 243/month. But: there are stockouts.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 How can we have a constant work force plan with no stockouts? Answer: using the graph, find the straight line that goes through the origin and lies completely above the cumulative net demand curve:

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 From the previous graph, we see that cum. net demand curve is crossed at period 3, so that monthly production is 960/3 = 320. Ending inventory each month is found from: Month Cum. Net. Dem. Cum. Prod. Invent. 1(Jan) (Feb) (Mar) (Apr.) (May) (June) (July) (Aug)

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 But - may not be realistic for several reasons: It may not be possible to achieve the production level of 320 unit/month with an integer number of workers Since all months do not have the same number of workdays, a constant production level may not translate to the same number of workers each month.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 To overcome these shortcomings: Assume number of workdays per month is given K factor given (or computed) where K = # of aggregate units produced by one worker in one day

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Finding K Suppose that we are told that over a period of 40 days, the plant had 38 workers who produced 520 units. It follows that: K= 520/(38*40) = = average number of units produced by one worker in one day.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Computing Constant Work Force Assume we are given the following # of working days per month: 22, 16, 23, 20, 21, 17, 18, 10. March is still critical month. Cum. net demand thru March = 960. Cum # of working days = = 61. Find 960/61 = units/day implies /.3421 = 46 workers required.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Constant Work Force Production Plan Mo # wk days Prod. Cum Cum Net End Inv Level Prod Dem Jan Feb Mar Apr May Jun Jul Aug

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Addition of Costs Holding Cost (per unit per month): $8.50 Hiring Cost per worker: $800 Firing Cost per worker: $1,250 Payroll Cost: $75/worker/day Shortage Cost: $50 unit short/month

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Cost Evaluation of Constant Work Force Plan Assume that the work force at end of Dec was 40. Cost to hire 6 workers: 6*800 = $4800 Inventory Cost: accumulate ending inventory: ( ) = Add in 100 units netted out in Aug = Hence Inv. Cost = 2193*8.5=$18, Payroll cost: ($75/worker/day)(46 workers )(167days) = $576,150 Cost of plan: $576,150 + $18, $4800 = $599, ~ $600K

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Cost Reduction in Constant Work Force Plan In the original cum net demand curve, consider making reductions in the work force one or more times over the planning horizon to decrease inventory investment.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Cost Evaluation of Modified Plan I will not present all the details here. The modified plan calls for reducing the workforce to 36 at start of April and making another reduction to 22 at start of June. The additional cost of layoffs is $30,000, but holding costs are reduced to only $4,250. The total cost of the modified plan is $467,450.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Zero Inventory Plan (Chase Strategy) Here the idea is to change the workforce each month in order to reduce ending inventory to nearly zero by matching the workforce with monthly demand as closely as possible. This is accomplished by computing the # units produced by one worker each month (by multiplying K by #days per month) and then taking net demand each month and dividing by this quantity. The resulting ratio is rounded up and possibly adjusted downward.

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 n I got the following for this problem: Period # hired #fired 1 10 Cost of this 1 10 Cost of this 2 20 plan: 2 20 plan: 3 9 $555, $555,

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 How to disaggregate? Have to disaggregate a aggregate plan to a master production schedule (MPS) MPS will then be used to plan for material requirements of the production and detailed scheduling

Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Fall, of 31 Optimal Solutions to Aggregate Planning Problems Via Linear Programming Linear Programming provides a means of solving aggregate planning problems optimally. The LP formulation is fairly complex requiring 8T variables and 3T constraints, where T is the length of the planning horizon. Clearly, this can be a formidable linear program. The LP formulation shows that the modified plan we considered with two months of layoffs is in fact optimal for the prototype problem. Refer to the latter part of Chapter 3 and the Appendix following the chapter for details.