SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction.

Slides:



Advertisements
Similar presentations
Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
Advertisements

A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
Measurement for Civil Engineering works
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
The Failure of Teton Dam
The Teton Dam Failure By Matthew Reddy and Robert Cundill.
Rock Slide on Sea to Sky Highway. The Issue Geology Short Term Solution Long Term Solution.
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
Viaduct I Failure, Caracas – La Guaira Highway, Venezuela Ali Jabalameli Yaút Peña Pattanun Chanpiwat.
 Location – Maneri to Uttarkashi, India  Length – 8.56km long, diameter 4.75m  Use – a power tunnel, part of the hydro-electric project on the River.
By James Scarisbrick, Tom Watkinson & James Yip. Introduction Taipei 101 is a 509.2m tall skyscraper situated in the northern region of Taiwan, in the.
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
East Branch Dam Safety Modification Project
1 Armour Ranch Road Bridge Emergency Repairs SB County Project Number 01STRM R015 Storm Damage caused during March 5 th 2001 storm.
Bridge Engineering (9-2) Suspension Bridges—A Case Study of Akashi Kaikyo Bridge I. Project Description: 1.1 Project Location 1 Tuesday, May 12, 2015.
Rion-Antirion Bridge, Greece. Presented by James Mitchell, Dan Bundy and Hung Nguyen.
Retaining Wall Design Slope Stability on US-189 MAQuiGr Engineering
Pakistan Earthquake 2005 Peter Parsons and Geraint Roberts.
TDOT Rockfall Management System
Malpasset Dam Disaster
Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.
CE 120 Introduction to Civil Engineering
CE 120 Introduction to Civil Engineering
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement Behdeen Oraee-Mirzamani Imperial College London,
TRENCHLESS TECHNOLOGY
John Osborne GS/SE March 2013
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
Department of Civil Engineering,
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
Wood Construction CTC-375.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Projects THE BASIL READ GROUP Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke. Dr Michael Roberts, TWP SAIMM Zimbabwe.
MNM Fatal Fall of Roof Accident Fall of Roof Accident April 15, 2011 (Idaho) April 15, 2011 (Idaho) Underground Silver Operation Underground Silver.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
Damage to Bolu Viaduct from Earthquakes in Turkey Euridice A. Oware Advisor: Dr. Mete Sozen.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
-Kazem Oraee (Prof) - Arash Goodarzi (Eng) - Nikzad Oraee-Mirzamani (Phd) -Parham Khajehpour (Eng) 34th International Conference on Ground Control in Mining.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
The Great Hanshin-Awaji Earthquake
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
BUILDING CONSTRUCTION
Foundation Failure. Foundation movement may result from a wide range of factors, which can include: Shrinking or swelling of clays caused by changes in.
Foundation types and uses
بسم الله الرحمن الرحيم Soil Nailing for slope stability
Development and Application of High Strength FRP Pipes as Grouted- Reinforcing Members in Slope and Tunnel KSCE Annual Conference and Civil Expo 2004 Daewon.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Engineering Geology Concepts.  What is Engineering Geology?  History of Engineering Geology  What are the importance of Engineering Geology?  Scope.
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
Copyright February 10, Introduction to Geotechnical Engineering Prof. Basuony El-Garhy Geotechnical Engineering and Foundations Civil Engineering.
Leads Institute of Technology & Engineering
CAD-Architecture Inst: Mr. Johnston Logan High School
Introduction to Geotechnical Engineering
Foundation – jay Desai.
Building on Difficult Soils
EAG346-Sem II 2014/2015 Lesson 2.
Geotechnical Engineering II
Hoover Dam.
4th Annual Construction Law Summit
Taum Sauk Dam Failure Missouri, 2005
Project Purpose & Description
REVISION 1 1. Foundations.
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
Geologic Geometry.
THE FAILURE OF SHIH-KANG DAM
Presentation transcript:

SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction Implications

SCHOOL OF CIVIL ENGINEERING Introduction to the Project Geological Conditions The Collapse Causes of Failure The Solutions Conclusions

SCHOOL OF CIVIL ENGINEERING Lane Cove Tunnel Collapse Sydney Australia Connecting the M2 Freeway at North Ryde to Gore Hill Freeway AU$1.1billion contract Awarded to Theiss & John Holland Joint Venture Source – Google Maps Data 2010

SCHOOL OF CIVIL ENGINEERING The Collapse Occurred on the 2 nd November 2005 The first collapse occurred at approx 01:40 am 02:00 am a hole was observed approximately 4-5m wide and had undermined approximately 1-2m under the road 06:00 am, a secondary collapse was heard and the hole had widened to approximately 8-9m

SCHOOL OF CIVIL ENGINEERING Dangerously the hole compromised the stability of a neighbouring tower block Damage to the unit block at Longueville Road, Lane Cove Source – Work Cover: New South Wales

SCHOOL OF CIVIL ENGINEERING 1. Geological conditions at the site 2. The large span width of the tunnel intersection 3. The proximity of the tunnel excavations to the ground surface 4. The nature of the tunnel roof support installations

SCHOOL OF CIVIL ENGINEERING Hawkesbury Sandstone & Ashfield Shale Lane Cove Tunnel lies predominately in the low strength Shale Site Engineer classed the bedrock as having low to very low strength The Presence of a (doleritic) Dyke Rock Mass Joints and Faults

SCHOOL OF CIVIL ENGINEERING Longueville Road retaining wall Rock Bolting Inadequate support system Advancement of one side of the tunnel to quick Specifications not adequate for region of tunnel

SCHOOL OF CIVIL ENGINEERING The tower block was evacuated and the road closed at 06:45 The hole was then filled with concrete and then the voids filled with grout to finalise the stabilization Approximately 2750 cubic metres of concrete and grout were pumped into the collapsed area

SCHOOL OF CIVIL ENGINEERING The Solution Pacific Highway Off- Ramp at south western corner of Kerslake Apartments. Void backfilling with concrete 3rd November 2005 Source – Work Cover: New South Wales

SCHOOL OF CIVIL ENGINEERING New foundations using piles Diverting the tunnel

SCHOOL OF CIVIL ENGINEERING Low Strength Shale Presence of dyke Jointing Failure Retaining wall drilling Poor rock stabilizing methods Rock bolting not installed to specification causing failure of the ground support system

SCHOOL OF CIVIL ENGINEERING