Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Taking off and ESTIMATING
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Pricing Subcontractors’ Work
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
E STIMATION 1 Excavation 2 lesson 5. E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation.
Concrete Pre Cast Panel By Peter Spence ID:
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Chapter 9 Pricing the Work. Introduction Non-computer estimates are priced in two stages: –Stage one: Prepare a recap by sorting and listing all takeoff.
Paulina wawryca Paweł bilski Piotr mazur. Project risk.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Eight Cert IV - M. S. Martin March 2012.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
RESOURCE PLANNING Learning Objectives Produce resource charts from bar charts Demonstrate how, for example, activity float can be used to modify a schedule.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Construction process Types of contracts Halmstad University Construction management Piotr Mazur Paulina Wawryca Paweł Bilski.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
EM15 – Contractors COST MANAGEMENT
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
Measuring Masonry Work
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Ms. Gripshover Landscaping Unit 12. Identify the difference between an estimate and a bid. Describe landscape specifications. Prepare a cost estimate.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Construction Contracts and Project Delivery Methods
Construction Math This presentation gives examples of scenarios one would use math in construction situations.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Specification & Quantities Estimating
TYPES OF CONTRACTS.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Lesson 8 Pricing the Landscape Plan. Next Generation Science/Common Cores Standards Addressed! n CCSS.Math.Content.7.R P.A.3 Use proportional relationships.
Can you afford NOT to have a QS managing your construction budget?
Chapter 13 Estimates for Remodeling Work
Measurement and Payment
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Roles and responsibilities PM
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
Estimating Project Costs
Costing and Project Evaluation
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Contractor’s Post-contract Cost Management Processes
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Types of contract selection based upon following:
COST PLANNING AND ESTIMATION
PS&E – Plans, specifications and estimate
Estimating the Cost for the Concrete Pad
Awarding Criterion for late tender: the lowest bid- why?
Estimating the Cost for the Concrete Pad
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Contractual Arrangement
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Estimating the Cost for the Concrete Pad
TCU-PROJECT: 7TH Semester Course
6th. Semester Schedule: 1st. Week
Presentation transcript:

Estimating & Tendering

Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation

Types of contract -Lump Sum or Hard Money contracts -Cost plus %-age contracts -Cost plus fixed fee contracts

TERMINOLOGY Provisional Cost sum, is a cost to supply and fix an item Prime cost item, is the price for supply only

Example 1 A $ PC sum was allowed for A/C in the contract. The actual cost ended up being $8 500, so the client gets a $1 500 refund. Example 2 A $ PC sum was allowed in the contract. Actual cost was $ Charge the client the extra $1 500 plus your margin of say 10-%, a total of $ Example 3 $35/m2 for a 100 m2 tiled floor was allowed in the contract. If the tiles the client chose cost $30/m2, the client gets a refund of $5/m2 x 100 m2 = $500.

More Terminology Client Contingencies: This is an amount set into the contract to cover an unknown amount of work. Say you allow $ for excavating through rock. At the completion of the contract the contractor must accurately account for the actual costs and offset it against the allowance made. Contractor Contingencies: Contractors can use contingency allowance for unknown events that they are contractually bound for. In this instance it covers the contractors risk and can be a %-age on the contract value and dependant on how risky you think the job is. If the contingency is not used, it is not returned to the client but increases the contractor’s profit.

Factors to consider when tendering -How much work have you already got on? Do you want or need more work? -Can you handle more work and is it going to be profitable? -Are you technically and financially capable? -Who is the client or Architect? Good to work with? -How many tenderers are there likely to be? -Who is the main competition? Are they desperate for work? -What are your chances of success?

EARTHWORKS Demolition? Clearing and levelling the site Setting out new buildings Excavating for footings

Minor demolition example Estimate: Machine hire: 20 $60/hr = $1 200 Labour: 1 person 20 $25/hr = $500 Truck hire: 15 $50/hr = $750 Dumping fees: 85 $8/ton = $680 Total = $3 130

Terminology A Foundation is the prepared soil that you are going to start building on A Footing is usually made from reinforced concrete and is the first thing you build upon that foundation

ESTIMATING SHEET Project:Estimator: Location:Extended Date:Sheet No. of Form 1/A DescriptionUnitQuantityRateEstimate

Example – raft slab footing 5 x 5 m in plan with 500 x 300 mm beams around the perimeter and a 100 mm thick slab. Edge rebate for brickwork

TRENCHING incl edge form Description Unit Qty Rate $ Setting out: 1 person ½ day hr Backhoe 1 day hr Clear site to 150 mm m Labour: 2 persons 1 day hr Spoil removal 6.8 m3 ton Total to summary $1 786

CONCRETE placement and finishing Description Unit Qty Rate $ Labour 2 persons 1 day hr Concrete pump* No Vibrator (own) No Miscellaneous 100 Total to summary $930 Due to limited site access Concrete supply m $720

Quantity of concrete (Use centre lines to measure) 5000 mm 5000 – 2 x 60 = – 2 x 150 = – 2 x 300 = – 2 x 350 = Slab: 4.4 x 4.4 x 0.1 = 1.94 m3 Beam: 0.3 x 0.5 x 4.7 x 4 = 2.82 m3 Wedge: 0.15 x 0.15 x 0.5 x 4.3 x 4 = 0.19 m3 Rebate: x x 4.88 x 4 = m m3 Add 20% 0.95 m3 5.7 m Say 6 m3

REINFORCING Description Unit Qty Rate $ Reo bars 6 Y16 20 lm x % lap/waste lm Ligatures pre-fab 0.6 m cts. 20/ % No Fabric F72 to slab 5 x 5 = 25m2 + 20% laps m Chairs and ties item DPM 100 x 2 m roll No Total to summary $810 Labour 2 persons 1 day hr $480

SUMMARY Labour Trenching $1 786 Reo $480 Concrete $930 Material Reo $810 Concrete $720 Total $4 726

Example – Carpentry Say we have a four walled room 5 x 5 m with 2.7 m high walls. All timber is 70 x 35 pine with studs at 600 mm c/c. Description Unit Qty Rate $ 70x35 top and bottom plates lm x35 studs lm x35 noggins lm Damp Proof Course roll No Nails and Dynabolts item 20 First fix carpenters 2p x 2 day hr Miscellaneous 100 Total to summary $1 691

How many bricks per square metre of wall? Standard brick size 230 x 76 mm Mortar joints nominally 10 mm Area taken up by one brick is x = m2 We get 1/ = bricks/m2 For small areas round off to 50/m2 and add a %-age for waste

Tendering process -Ensuring that you are invited to tender, if that is limited -Taking the tender documents, which consist of drawing, specifications and sometimes a bill of quantities, and breaking them down into packages. These packages must be appropriate for your subcontractors to bid for. -Inviting subcontractors to bid and evaluating the bids. -Adding up all construction costs plus the preliminaries or overheads plus your margin to form the tender price. -Finally, you need to submit the tender as per the instructions, and don’t be late!