L2 chains for single-beam menu Muon full reconstruction T2Calo starting from MBTS Ricardo Gonçalo, Denis Damazio.

Slides:



Advertisements
Similar presentations
Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
Advertisements

Releases & validation Simon George & Ricardo Goncalo Royal Holloway University of London HLT UK – RAL – 13 July 2009.
ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
Inefficiencies in the feet region 40 GeV muons selection efficiency   Barrel – End Cap transition 10th International Conference on Advanced Technology.
TDAQ week Lisbon, October HLT Algorithms Planning Discussion Discussion: (suggested timing) Aims for this meeting (2 mins) Milestones (1 min) Review.
RAL Summer School September, 2004 Efstathios (Stathis) Stefanidis High Level Trigger Studies for the.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
The ATLAS High Level Trigger Steering Journée de réflexion – Sept. 14 th 2007 Till Eifert DPNC – ATLAS group.
Stefania.Spagnolo, Dip. Fisica, Univ. Lecce CERN, Nov. 2006, ATLAS Trigger and Physics week Muon Event Filter Stefania Spagnolo Dip. Fisica, Univ. Lecce.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
Real Time 2010Monika Wielers (RAL)1 ATLAS e/  /  /jet/E T miss High Level Trigger Algorithms Performance with first LHC collisions Monika Wielers (RAL)
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Trigger-aware analysis Current status Under development What’s missing Conclusions & Outlook Ricardo Gonçalo (RHUL)
What’s in the ATLAS data : Trigger Decision ATLAS Offline Software Tutorial CERN, August 2008 Ricardo Gonçalo - RHUL.
Trigger validation for Event size TrigDecision Jets Electrons Ricardo Gonçalo, RHUL Physics Validation Meeting – 9 October 2007.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
1 Trigger “box” and related TDAQ organization Nick Ellis and Xin Wu Chris Bee and Livio Mapelli.
Ricardo GoncaloPESA Algorithms - 18/7/061 Level 2 e/  menu.
Trigger Offline DQ Monitoring DQ Meeting – 27 Oct 2009 Ricardo Goncalo for Trigger Offline Monitoring.
Jet Trigger On-Call Shift Summary Ricardo Gonçalo - LIP.
HEP 2005 WorkShop, Thessaloniki April, 21 st – 24 th 2005 Efstathios (Stathis) Stefanidis Studies on the High.
Event Filter and Trigger Menu L=10 31 cm -2 s -1 Sergio Grancagnolo on behalf of the Muon Trigger software group.
ATLAS ATLAS Week: 25/Feb to 1/Mar 2002 B-Physics Trigger Working Group Status Report
Summary and feedback on trigger AODs Introduction Overview of trigger data in the AODs Trigger-aware analyses and feedback Outlook Ricardo Gonçalo (RHUL)
Marco Delmastro 23/02/2006 Status of LAr EM performance andmeasurements fro CTB1 Status of LAr EM performance and measurements for CTB Overview Data -
DPDs and Trigger Plans for Derived Physics Data Follow up and trigger specific issues Ricardo Gonçalo and Fabrizio Salvatore RHUL.
1 “Steering the ATLAS High Level Trigger” COMUNE, G. (Michigan State University ) GEORGE, S. (Royal Holloway, University of London) HALLER, J. (CERN) MORETTINI,
Valeria Perez Reale University of Bern On behalf of the ATLAS Physics and Event Selection Architecture Group 1 ATLAS Physics Workshop Athens, May
Status of trigger software and EDM Ricardo Gonçalo, RHUL – on behalf of ATLAS TDAQ.
The ATLAS Trigger: High-Level Trigger Commissioning and Operation During Early Data Taking Ricardo Gonçalo, Royal Holloway University of London On behalf.
Trigger Offline Expert Report Simon George (RHUL), Ricardo Gonçalo (RHUL) Trigger General Meeting – 25 th November 2009.
TDAQ Upgrade Software Plans John Baines, Tomasz Bold Contents: Future Framework Exploitation of future Technologies Work for Phase-II IDR.
IOP HEPP: Beauty Physics in the UK, 12/11/08Julie Kirk1 B-triggers at ATLAS Julie Kirk Rutherford Appleton Laboratory Introduction – B physics at LHC –
Muon Trigger Slice Report Sergio Grancagnolo for the Muon Trigger group INFN-University of Lecce CERN Jan 23, 2007.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – April 12, 2007 Outline: Reminder of plans Status of infrastructure.
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting January.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
AOD/ESD plans Status and plans focusing on LVL2 e/  and some items for discussion On behalf of: J.Baines, P.Casado, G.Comune, A.DiMattia, S.George, R.Goncalo,
Trigger validation for Many thanks to Long Zhao, Chihiro Omachi, Julie Kirk, Giovanni Siragusa, Patricia Conde Muiño, Andreas Reinsch, Olya Igonkina,
PESAsim – the e/  analysis framework Validation of the framework First look at a trigger menu combining several signatures Short-term plans Mark Sutton.
Status of Monitoring in HLT ALgorithms Ricardo Gonçalo, RHUL – BNL Analysis Jamboree – Aug. 6, 2007.
Trigger Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) on behalf of trigger community Physics Validation Meeting – Feb. 13, 2007.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
ATLAS T RIGGER P ERFORMANCE Ricardo Gonçalo Royal Holloway University of London On behalf of the ATLAS Collaboration LHC Days at Split, 4-8 October, 2010.
7 October 2004Steve Armstrong ATLAS Overview Week Freiburg1 Online Physics Event Selection: The e /  Slice Steve Armstrong Brookhaven National Laboratory.
Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.
E/gamma report Ricardo Gonçalo for the e/γ slice.
Jet Slice – use of TopoClusters Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 20 August 2014.
Trigger Algorithms and Performance Ricardo Gonçalo, Royal Holloway ATLAS Overview Week - CERN 10 October 2007.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
Trigger study on photon slice Yuan Li Feb 27 th, 2009 LPNHE ATLAS group meeting.
Muon HLT: status of the algorithms and performance Sergio Grancagnolo for the Muon HLT group.
Trigger release and validation status and plans David Strom (Oregon), Simon George (RHUL), Ricardo Gonçalo (RHUL)
UPDATE First Look at Trigger Efficiencies from AOD for ttH, H  bb Catrin Bernius UCL ATLAS Physics Meeting
1 Data taking period E1 Plots E1 - August 5th. Producing the plots Triggers used Plots I.Trigger. II.Luminosity. III.Jets. IV.Leptons. V.MET. What Next?
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
ATLAS B trigger Overview of B trigger Di-muon algorithms Performance (efficiency/rates) Menu for data taking experience 7/1/20101ATLAS UK Meeting,
Commissioning of the ATLAS High Level Trigger with Single Beam and Cosmic Rays 1.Review of HLT architecture 2.Tools needed for Commissioning 3.Operational.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Ricardo Gonçalo, RHUL BNL Analysis Jamboree – Aug. 6, 2007
The University of Manchester
High Level Trigger Studies for the Efstathios (Stathis) Stefanidis
The First-Level Trigger of ATLAS
MOORE (Muon Object Oriented REconstruction) MuonIdentification
Presentation transcript:

L2 chains for single-beam menu Muon full reconstruction T2Calo starting from MBTS Ricardo Gonçalo, Denis Damazio

Status report The goal is to exercise trigger algorithms using single beam data Most events will be empty Beam-gas : can look like an event with CM frame hugely boosted wrt the lab Beam-halo : it’s beam-gas upstream of ATLAS; looks like muons parallel top the beam Would like to use these topologies to run calorimeter and muon algorithms at L2 – Where to start from (L1 item) – How to produce RoIs – What chains to configure? Pretty much starting/ongoing work and not much to show yet – Will shamelessly use this meeting to get some opinions and then implement what seems sensible Ricrdo GonçaloTrigger Menus - 26 Aug

L2 muon full scan Plan to use a chain modified from mu4_dimu_fs Starts from L1_MU4 HLT chain counter 390 – L2_MU4_DiMu_FS – EF_MU4_DiMu_FS Uses TrigDiMuonFast at L2 Plan to use existing L2 setup in new chain A muon trigger from the endcap is possible (see talk by Masaya) in the last Core & Slices meeting Ricrdo GonçaloTrigger Menus - 26 Aug

T2Calo_egamma starting from MBTS For regular menu: – Two chains starting from either MBTS_A or MBTS_C. – MBTS_A one starts EndCapA (positive eta) egamma chain. – MBTS_C does the same for a negative eta egamma chain. – Still missing chain names definition? – Again T2Calo in forced positions. OR: – All TE to generate RoI position from MBTS id (16 MBTS scintillators on each side) – Changes to Electron.py? – Need some data sample which has MBTS information for the default menu and calorimeter (Will? Regina? David?) – Rates? (well…luminosity?) For cosmics Start from any MBTS_Ax or MBTS_Cy L1 items Use AllTE algorithm by Alex Cerri to combine the MBTS TEs Start one chain for side A and one for side C RoI forced to be big chunk of endcaps Chain proceeds as normal for photons Add ID part when possible? Initial prototype built by Denis and submitted to Alex Ricrdo Gonçalo4Trigger Menus - 26 Aug. 2008

Egamma chain Plan for egamma single-beam: – Starting from L1_EM3 (?) e5_allTracking e5_SiTracke 5_IDSCAN e5_TRTSegFinder – These could be the chains starting from MBTS e5_unseeded – with L2 tracking g5 (ie, e5_noTrack) The cleanest way would be to have AllTE algos to start off the unseeded chains Alternative to start 2 chains from MBTS_A and MBTS_C Event Filter egamma with AllTE from Phillip (see next talk) L2 tracking not yet ready – experts busy Ricrdo GonçaloTrigger Menus - 26 Aug

Conclusions Not very much to show yet, work ongoing Finding best way to create these chains Expect to have something next week Ricrdo GonçaloTrigger Menus - 26 Aug

backup Ricrdo GonçaloTrigger Menus - 26 Aug

Ricrdo GonçaloTrigger Menus - 26 Aug