Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,

Slides:



Advertisements
Similar presentations
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Advertisements

7 tasks identified Flight Arrival Interaction Detection Resolution Planning Resolution Implementation Monitoring Other Trajectory Changes Co-ordination.
Preliminary Hazard Analysis of EUROCONTROL Concept of Operations 2011 using the FAST method European Organisation for the Safety of Air Navigation presented.
European ATFM From current operation towards the future Patrick Ky
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
The Performance Framework Episode 3 - CAATS II Final Dissemination Event Laurent Tabernier EUROCONTROL Project Episode 3 Brussels, 13 & 14 Oct 2009.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
1 EUROPEAN COMMISSION CLIMATE CHANGE UNIT ICAO/UNFCCC expert meeting Montreal, April 2004 Hartmut Behrend European Commission DG ENV.C.2, Brussels.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
Continuous Climb Operations (CCO) Saulo Da Silva
Introduction Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Safety case development in ATM R&D Safety feedback for decision-makers and concept developers Episode 3 - CAATS II Final Dissemination Event Jelmer J.
Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Gaming and Modelling Pablo Sánchez-Escalonilla AENA Episode 3 Brussels,
SESAR and ASAS Opportunity
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
BUSINESS CASE Episode 3 - CAATS II Final Dissemination Event Ignacio Zozaya Boeing Research & Technology Europe CAATS II Brussels, 13 & 14 Oct 2009.
Review Continuous Descent Operations Manual Roosevelt Pena (Dom Rep)
Study Continuous Climb Operations
SESAR Single European Sky Air traffic management Research
Episode 3 / CAATS II joint dissemination event Michael Standar Chief, Operational Concept and Validation.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
David Bowen Head of ATM Operations and Systems
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009.
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
Overview Day 1 Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
1 ATM System Wide Modeling Capabilities in Fast-Time Simulation 1 st Annual Workshop – NAS-Wide Simulation in Support of NextGen Dec. 10th – George Mason.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
Episode 3 E3-WP0-MWPM PPT-V th ExCom Slides 1 Episode 3 - Ex-Com Final Report Tools & Validation Dr. Ralph Leemüller R&D Division - DFS.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Joint wrap-up of event Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Episode 3 1 Final Report Performance Aspects Ex-Com #6 - Brussels, December 15th 2009
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Collaborative Decision Making (CDM) Saulo Da Silva
Welcome to the SESAR SWIM Master Class 2013
The Role of Air Traffic Control in A CDM ENVIRONMENT
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
Introduction of TBO within OptiFrame
Continuous Climb Operations (CCO) Saulo Da Silva
OPTIFRAME : Project Overview
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
OptiFrame WP1: Project Management
Continuous Climb Operations (CCO) Saulo Da Silva
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
Complex World Event 8 April 2015 EUROPEAN COMMISSION.
4D Trajectory Management
Soren Dissing - EUROCONTROL
Presentation transcript:

Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels, 13 & 14 Oct 2009

Episode 3 - CAATS II Final Dissemination Event 2 Content Objective of Concept Detailing Documentation Produced Concept Detailing Process Example results Operational Scenario example:  OS-35 High density TMA Arrival – Flying CDA Merging Lessons Learnt Conclusions

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 3 Objective of Concept Detailing  Supporting validation activities - Concept descriptions for exercises Process Model Detailed Operational Descriptions DODs Operational Scenarios Storyboards Support implementation of SESAR Target Concept  Production of specifications - Need comprehensive coverage - Sufficient level of detail - Future OSED production

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 4 SESAR Operational Concept ATM Process Model The ATM Process Model Detailed Operational Descriptions OSED ‘Template’

LONG TERM MID/ SHORT TERM EXECUTION POST FLIGHT Years to ~6 months~6 months to ~15 min Cooperative planning General and Lexicon Long Term Planning Collaborative Airport Planning Runway Management Apron and Taxiway Management Network Management in Execution Short/Medium Network Planning Conflict Management in En Route Conflict Management Arrival & Departure DODs Scope of DODs

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 6 DOD Development Process SESAR sources e.g. Concept of Operations (D3), Operational Improvement Steps (D5) Initial DODs (Jan 08) Expert ReviewsExercise Needs Interim DODs (Jan 09) Expert ReviewsExercise Results Final DODs (Dec 09) DODs

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 7 Review Process DODs Reviewed by Experts  Current Operations in ANSPs, ATFCM, Airlines, Military  SESAR Definition Phase CONOPS (222)  Some new material added through review Early user of Review Room  Allowing potentially contradictory comments to be easily identified Hot topics identified debated  Via – difficult to record transparency v spam effect  Via Discussion Room – good  Answers by Exercises or escalated to Co-ordination Cell Development of a Lexicon  Developed agreed definitions for over 20 SESAR terms  Available as document and on

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 8 Additional Concept Detail Lexicon Definitions  Paraphrasing text from Target Time of Arrival, Shared Business Trajectory, Revision  Proposed in Episode 3 - Arrival Management, Constraint, Tolerance Window New text in the DODs  SBT to RBT agreement gives ~time, Episode 3 proposed set of conditions  New Roles and Descriptions of Responsibilities - Airport driver role, complexity manager responsibilities Hot Topics deferred for S-JU activities  Successive authorisation v increased workload AUO-0302  Extent and meaning of CDM in execution phase 222/D.2

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 9 DODs, Scenarios & Storyboards DODs  Specifications of main ATM processes Operational Scenarios  Descriptions of how processes work together in an operation  Operational scenarios fundamental to expert groups, prototyping and gaming  Importance increased over time v Use Cases Storyboards  Diagrammatic representation of parts of ATM operations  Developed or reviewed in Expert Groups  New in Episode 3

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 10 Concept wide view now Zoom in to the TMA …

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 11  Operational Scenarios primarily developed to meet Episode 3 Validation Exercise needs  Update with Episode 3 validation exercise results and Episode 3 Expert Group comments where available General Development Process Operational Scenarios (OS) 27 OS developed within Episode 3 SESAR sources e.g. Concept of Operations (SESAR D3), Operational Improvement Steps (SESAR D5) Detailed Operational Descriptions (DODs) 9 DODs developed within Episode 3

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 12 Operational Scenario Example OS-35 High density TMA Arrival – Flying CDA Merging Input from SESAR:  Section F3.5 of SESAR ConOps refers to aircraft that "as far as possible, fly their individual optimum … descend profiles" in medium/low complexity TMAs  Section H2.3 of SESAR ConOps refers to high complexity TMAs where a trade-off between throughput, punctuality and environmental performances will be made  The Operational Improvement steps (OI-steps) addressed are - AOM-0701 Continuous Descent Approach (CDA) - AOM-0702 Advanced Continuous Descent Approach (A-CDA)

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 13 Operational Scenario Example Input from early interim DOD G-General:  Contained initial high level CDA scenario “Flying CDA merging without Structured Routes” Input from additional sources used (EUROCONTROL and ICAO documents, European and international studies) Operational Scenario was composed:  The TMA described in this scenario consists of medium/low complexity and high traffic density  Aircraft have ATM Service and Capability Level 2, scenario is set around 2015 time frame

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 14 Operational Scenario Example The CDA scenario is set in a Point Merge airspace structure Scenario describes the processes and interactions between human actors and systems for the following cases:  Nominal CDA procedure  CDA procedure with tactical ATC controller intervention  CDA procedure with wind impact IAF

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 15 Operational Scenario Example Scenario was updated with Episode 3 Validation Exercise results and comments from Episode 3 TMA Expert Group Scenario contains hop topic discussion boxes with open issues. Example from case with tactical intervention:  Hot Topic: How can the CTA and RTA of an aircraft be revised?  Expert discussion: Next generation of AMAN tools should dynamically and continuously compute revised CTA and a place in the arrival sequence Scenarios will be disseminated as an annex of Detailed Operational Descriptions

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 16 Zoom from the detail to Big Picture …

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 17 Lessons Learnt No Concept Authority  Same topic discussed repeatedly  But discussion needed for understanding Difficult to integrate exercise results  Process defined, but difficult to agree responsibilities  Consistency across DODs, Scenarios & Storyboards  In progress at the moment Hot Topics identified & described  Difficult, contentious or ambiguous problems  Resolution, escalation or deferred for SESAR-JU Review Room and Discussion Room  Management of discussion  Debates recorded

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 18 Conclusions Developed a Concept Detailing Process  ATM Process Model & DODs  Operational Scenarios & Storyboards  Checks for completeness & coherence  Identification of Hot Topics Concept detailing started from SESAR D3  Input from operational experts (incl airlines)  DODs, Scenarios and Storyboards available Lessons Learnt