April 30, 2009 County Accountants’ Conference. Merry Daher Federal Aid Plans Engineer Phone: (651) 366 3821 Fax : (651) 366-3801

Slides:



Advertisements
Similar presentations
Emergency Response via the Web Two emergencies in August 2007 highlight the Internet as a dynamic communication tool.
Advertisements

Presented by Dan Erickson And Colleen VanWagner.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
District 4 Local Assistance
Minnesota Department of Transportation State Aid for Local Transportation Prepared for Minnesota County Highway Accountants Conference April 29, 2010.
Centralized Bidder Inquiry System An example of a sample project inquiry.
Local Agency Bonds. Issuing a Bond  The municipality decides they need an influx of cash and a bond issue is how they decide to get it.  Working with.
1 CONNECTICUT DEPARTMENT OF TRANSPORTATION’S ARRA REPORTING July 9, 2009 R5 CTDOT Internal Version.
District Information Session For the American Recovery and Reinvestment Act.
Section 3 Steed Robinson – Office of Community Development  9/4/2014.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.
American Recovery and Reinvestment Act of 2009 ARRA Reporting Requirements April 14, 2009 Webinar.
FAMILY EDUCATIONAL RIGHTS AND PRIVACY ACT Electronic Signatures This work is the intellectual property of the author. Permission is granted for this material.
1 IDOT Vendor Portal Training August 5, 2013 Illinois Department of Transportation Presenter: Betsy Calcara.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Not Your Father’s Single Audit Tammie Brown John Fisher U.S. Department of Health & Human Services.
Title Slide visuals can be included. MnDOT Highway Construction Outlook Abby McKenzie Office of Investment Management MSPS January 28, 2010.
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT (LADOTD)
2009 CDBG/CHIP Recipients’ Workshop CDBG LABOR STANDARDS.
CDBG Labor Standards Tonya Mole, Pam Truitt  September 4, 2014.
WELCOME Title V Emissions Inventory SPARS Training – Site Management.
EReporting For New Users Division of Retirement and Benefits Toll Free
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
HOW TO DO BUSINESS WITH THE STATE OF SOUTH CAROLINA John R. Stevens, CPPB State Procurement Officer Procurement Services Division S.C. Budget & Control.
2014 CDBG Applicants' Workshop Section 3 Overview (see also DCA Policy– Appendix R)
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts Contract Closeout Application.
1 Acquisition Office SYMTRAC TM – The Importance of Compliance presented by Evita J. Fields.
1 Michigan and the American Recovery and Reinvestment Act of 2009 August 11, 2009 State Board of Education.
3 CDBG Disaster Recovery Workshop Tuesday, March 20, 2012.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Western Region CSREES Administrative Officer’s Meeting Monterey, California October 4 – 6, 2005 Janet Downey, Staff Accountant OEP, POFMB, Oversight Section.
RALPH COMER TENNESSEE DEPARTMENT of TRANSPORTATION January 19, 2010 THE ASSOCIATION OF GOVERNMENT ACCOUNTANTS TDOT's Approach to Economic Stimulus Funding:
Labor Standards Pam Truitt  September 10, Key Regulations & Statutes  Davis-Bacon Act  Copeland Act (Anti-kickback Act)  Contract Work Hours.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Tribal Strategies, Inc. Building a Strong Foundation Small Business Update Tulsa, Oklahoma February 1, 2010 Karen J. Atkinson Tribal Strategies, Inc.
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
Vice-President Academic & Provost Lunch & Learn Session on Faculty Advertising October 24, 2013 Susan Oestreich Office of the Vice-President Academic &
Lynnette Roshell
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
NEW USER REGISTRATION. Completing New User Registration activates your profile! Users only need to complete this process once. Let’s get started…
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
1 CONNECTICUT DEPARTMENT OF TRANSPORTATION’S ARRA REPORTING June 1, 2009 R2 CTDOT Internal Version.
2013 CDBG Recipients' Workshop CDBG Labor Standards.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Federal-Aid Funding County Highway Accountants Conference May 10, 2007 zpowerpoint/ProjManagersCriticalIssuesBOB Feb07.ppt.
American Recovery & Reinvestment Act Discussion February 13, 2009.
3 CDBG Disaster Recovery Program InformationWorkshop Tuesday, January 13, 2009.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Lions District 2-E2 Secretary Training March 14, 2015.
MOBILE ACCESS & PDS CONNECTS
Central Minnesota Area Transportation Partnership Primer Welcome
Construction Oversight
What is FAFSA.
State Aid Construction
Washington Metropolitan Area Transit Authority (WMATA)
Completing the State Aid Payment Request
State Transportation Bond Funds
Force Accounts.
Federal Funding for Agreements
Washington Metropolitan Area Transit Authority (WMATA)
The American Recovery and Reinvestment Act of 2009
State Aid Construction
Presentation transcript:

April 30, 2009 County Accountants’ Conference

Merry Daher Federal Aid Plans Engineer Phone: (651) Fax : (651)

What we will go over today ARRA (American Recovery & Reinvestment Act of 2009) HPP Funding Breakdowns & Paybacks Advertising

ARRA 100% Federal Funds (for Eligible items) Same requirements as any other Federal project PLUS Federal Certification by Washington DC Additional Proposal Contents Additional Reporting Requirements 100% Audit Probability (CFDA No. is )

ARRA Reporting Advertisement date Federal Permit approvals Award date DBE goal & clearance Notice to Proceed date Percent Complete Contractor Information...

Contractor Information Contractor Name Addrress address

Out-State ARRA Program 24 out-state road projects 19 projects have come in 15 are out for bids 23 out-state bridge projects 18 projects have come in 14 are out for bids First to be let is in Morrison County – today.

Metro ARRA Program Three tiers STP Tier I – 3 proj. previously in STIP MnDOT will contribute ARRA $ Tier II – 2 proj. already in STIP that will be made whole by ARRA $ Tier III – 32 will get some ARRA $ - not 100% for construction only ARRA Enhancement – 6 – 16 projects to be selected (1.3 million max ARRA$)

2009 Construction Projects Summary Out State – 47 ARRA projects Metro – 43 – 53 ARRA projects Out State – 127 Regular projects Metro – Regular projects

Advertising – Bid Opening Designated Publication Trade Journal Mn/DOT Website Timing determined by MN Statute County: 3 weeks + 10 days Towns: 2 weeks + 10 days

E-Advertising The SALT site can be accessed from MN/DOT webpage listing Mn/DOT projects SALT site will contain abbreviated ads linked to full ads. Submit ads through One Office or SALT Website Expect 2 day turn around for posting once information is approved.

E-Advert Basic Requirements 1)Your County must have a website or link where the full ad can be placed. (i.e. County Website, One Office, Quest.cdn) 2) “Non” One Office users will need a logon ID & password.

E-Advert SALT web advertising will parallel Construction Bulletin for about a year Important to transition away from CB as the Trade Journal for business consistency Need to work out affidavit of Publication (This is to satisfy auditors on state advertising req’ts)

QUESTIONS??