A Technology Ranking Methodology for the Cost-Benefit Analysis of Transmission Investments in Europe A Technology Ranking Methodology for the Cost-Benefit.

Slides:



Advertisements
Similar presentations
DG Joint Research Centre Institute for Energy and Transport
Advertisements

Study Committee Representatives Annual Report December, 2012
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Interline Unified Power Quality Conditioner
System Strength Discussion
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Application of Power Electronics
Presented by: Bikram Choudhury Regd. No. : Department of Electrical And Electronics Engineering FACTS Devices For Smart Grid 2 July 2015.
A Presentation On….. 1.
High Voltage Power Electronics Technologies for Integrating Renewable Resources into the Grid RenewElec Workshop Carnegie Mellon University October 22,
Working Party on Transport Trends and Economics, 21 st session Geneva, 9-10 September 2008 Supply chain challenges for transport.
Flexible AC Transmission Systems: Placement, Control, and Interaction
Flexible AC Transmission System Overview
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Master in Advanced Power Electrical Engineering © Copyright 2005 Techno-economic aspects of power systems Ronnie Belmans Dirk Van Hertem Stijn Cole.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
Network of Excellence in Internet Science Network of Excellence in Internet Science (EINS) 2 nd REVIEW Brussels, 4-5 February 2014 FP7-ICT
Valorisation and dissemination of EAF technology
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
REALISEGRID: a FP7 project for assessing the benefits provided by infrastructure development in a pan-European power system Gianluigi Migliavacca ERSE.
1 The Tres Amigas SuperStation VLPGO November 2011.
TRANSMISSION PLANNING IN EUROPE: FROM CURRENT METHODOLOGIES TO A NEW SYSTEMIC APPROACH Angelo L’Abbate, Gianluigi Migliavacca, ERSE (former CESI RICERCA)
THYRISTOR BASED FACTS CONTROLLER
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
23/04/2017 TITRE PRESENTATION 1.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
Electricity Industry Innovation Challenges Woodrow Wilson Cross-Border Forum on Energy Issues 8 March 2007 Washington, DC Stan Rosinski Program Manager.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Electric Energy Systems Smart Grids and IEA ENARD – Annex II: DG System Integration into Distribution Networks Helfried Brunner Operating Agent AnnexII.
Preliminary Analysis of Alternatives for the Long Term Management of Mercury John Vierow Science Applications International Corp. Reston, VA May 1, 2002.
CRITICAL THINKING AND THE NURSING PROCESS Entry Into Professional Nursing NRS 101.
Issues of Grid Integration of Renewables : Creative solutions 09/11/2012Mickaël HERVY01 / 11.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Power Quality By Using FACTS. CONTENTS INTRODUCTION WHAT IS FACTS? FOR WHAT PURPOSE FACTS ARE USED? BASIC TYPES OF FACTS CONTROLLERS BENEFITS OF UTILISING.
Smart grid project - interim report - Interim report for the 6th Steering Group Meeting of the Priority Area 2 Budapest,13 June 2013 The project is supported.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
HVDC Transmission.
Eurostat I) Context & objectives of KIP INCA project Project owner is the Environment Knowledge Community (EKC) EKC is an EU inter-services group involving.
Unified Power Flow Controller
Eric Peirano, Ph.D., TECHNOFI, COO
Eric Peirano, Ph.D., TECHNOFI, COO
Eric Peirano BRIDGE Support Team, Technofi
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
A new platform for testing TSO-DSO coordination schemes
FACTS BY SVC, FLEXIBLE AC TRANSMISSION
IG BASED WINDFARMS USING STATCOM
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
EE6501 POWER SYSTEM ANALYSIS
Public workshop: CBA 3.0 –come and improve with us the transmission and storage assessment methodology Brussels 07 November 2017.
Transmission Solutions
Reactive Power Compensation And Voltage Control Training
India Smart Grid Week, 2016 Yogendra Patwardhan
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
26th February 2015 Teleconference
A Symmetrical Hybrid Power Flow Controller
Gas Quality & TSO – LSO Coordination
26th February 2015 Teleconference
Incentives for electricity infrastructure – ERGEG view
FACTS BY SVC, FLEXIBLE AC TRANSMISSION
Date and venue: 23 September, MSFD PCG, DG Environment, Brussels
Presentation transcript:

A Technology Ranking Methodology for the Cost-Benefit Analysis of Transmission Investments in Europe A Technology Ranking Methodology for the Cost-Benefit Analysis of Transmission Investments in Europe Vafeas Athanase, Galant Serge, Pagano Tiziana, Technofi L’Abbate Angelo, ERSE (former CESI RICERCA) Häger Ulf, Technische Universität Dortmund Fulli Gianluca, JRC – European Commission SPECIAL SESSION: SUSPLAN & REALISEGRID 10th IAEE, EUROPEAN CONFERENCE 7-10 September 2009 in Vienna, Austria

14/04/ TREN/FP7/EN/219123/REALISEGRID Challenges related to the transmission grid expansion in Europe A collective quick scan tool to select candidate technologies The results of the quick scan tool obtained for two specific technologies  Superconducting cables  VSC-HVDC: Voltage Source Converter-High Voltage Direct Current ConclusionsOutline

14/04/ TREN/FP7/EN/219123/REALISEGRID Future critical investments for interconnected transmission systems involve several TSOs with cross border issues For given project, many technological options are available due to the many possible promising transmission system technologies There is a need for a preselection of options based on techno-economic criteria It is then critical to filter out unrealistic technology options before any cost benefit analysis is processed This work deals with the development and use of such a collective quick scan tool: It is a building block of the roadmap construction process for new transmission technologies in the electricity grids Challenges

Several technology options for a given project WP1 filtering process WP3 filtering process: cost / benefit analysis A collective quick scan tool CollectiveQuick scanQualitative Reduced technology options 14/04/2015 4

5 TREN/FP7/EN/219123/REALISEGRID It is a decision model based on the assessment of: i- the technical performance potential for the system ii- the technical barriers impeding their use in the transmission system Time horizon is taken into account to support the building of a roadmap (2020 and 2030) TSOs are asked to assess a given promising technology on an individual basis (4 marks per technology per TSO for each time horizon) Once marks are collected, a collective workshop involving all TSOs allows an analysis of consensus / dissent areas for each studied technology The collective technology quick scan tool: key features

14/04/ TREN/FP7/EN/219123/REALISEGRID Each selected innovative power technology has to be integrated into the specific environment of a Transmission System Operator (TSO) This integration process has several interrelated components to be taken into account:  the socio-economic integration  the socio-cultural identity of the company  the existing knowledge within the company  the know-how of its experts Why the rating can differ from a TSO to another? Dimensions influencing the TSO’s environment Integration into existing knowledge Integration into Social and cultural identity Integration into existing know-how Integration into the relational, social, economic environment

14/04/ TREN/FP7/EN/219123/REALISEGRID Technical Performance potential for the system Technical barriers towards System integration accessiblebreakthrough basicperipheral Techno 1 Summary of Ranking for Techno 1 1:Limited level of barriers in term of technology maturity and accessibility 2: Low level of barriers 3: Average level of barriers 4: Significant level of barriers 5: Major level of barriers 1: Limited improvement brought by the technology in terms of security and stability 2: Low improvement 3: Average improvement 4: Significant improvement 5: Major improvement The technology ranking methodology: Description

14/04/ TREN/FP7/EN/219123/REALISEGRID Application in REALISEGRID The REALISEGRID ranking of innovative power technologies by TSOs gives a first short list of promising technologies prior to an in-depth evaluation of the costs & benefits of their real-life implementation This first circle of the 4 REALISEGRID TSOs will be enlarged to additional ones in a Stakeholder board to be held on Sept 29 th 2009 in Paris The preliminary outputs will be used during 2 nd year of REALISEGRID to answer the following questions:  Which technologies show the highest potential in terms of technical system integration and performance to be considered in CBA studies?  What is the ideal development roadmap spanning the period , which will guide investments to support the grid integration of such technologies?

14/04/ TREN/FP7/EN/219123/REALISEGRID Selected promising technologies Superconducting cables High Temperature conductors Gas Insulated Lines (GIL) XLPE underground cables Phase Shifting Transformers (PST) Real Time Thermal Rating (RTTR)-based lines/cables Wide Area Monitoring Systems (WAMS)/ Phasor Measurement Units (PMU) Flexible Alternating Current Transmission System (FACTS): SVC (Static VAR Compensator); STATCOM (Static Compensator); TCSC (Thyristor Controlled Series Capacitor); SSSC (Static Synchronous Series Compensator); UPFC (Unified Power Flow Controller); DFC (Dynamic Flow Controller); TCPST (Thyristor Controlled Phase Shifting Transformer) High Voltage Direct Current (HVDC): Voltage Source Converter (VSC)-based HVDC (VSC-HVDC) Current Source Converter (CSC)-based HVDC (CSC-HVDC) Power Storage (possibly operated by TSOs): Flywheel; Supercapacitor; and Superconducting Magnetic Energy Storage (SMES)

14/04/ TREN/FP7/EN/219123/REALISEGRID Selected promising technology families

14/04/ TREN/FP7/EN/219123/REALISEGRID Selected promising technology families

Technology ranking of a Superconducting cable TREN/FP7/EN/219123/REALISEGRID This exercise involves the experience of European TSOs involved in REALISEGRID

Technology ranking of a VSC-HVDC TREN/FP7/EN/219123/REALISEGRID

Conclusions: the quick scan tool in REALISEGRID Collective discussion Consensus / dissent 19 Collective workshops Techn. & scientific litt review TSOs: knowledge CBA REALISEGRID technology experts Supercond HVDC VSC RTTR … Short list for WP3 Performance (security and stability) Barriers (maturity and accesibility) 1st LIST of promising technologies SCAN criteria Road map

A methodology, validated by four TSOs, has been developed to be used for an early techno-economic assessment of innovative transmission technologies This methodology will allow:  filtering-out the set of key technologies that have to be further scrutinized  developing a 2020 and 2030 roadmap for the integration of innovative transmission technologies  performing a cost-benefit analysis, a key stage of the transmission planning process, which takes account of the candidate technologies TREN/FP7/EN/219123/REALISEGRID Conclusions

ADDITIONAL presentation on the two main dimensions of the quick scan tool Technical performance technical barriers (only if needed for questions) SPECIAL SESSION: SUSPLAN & REALISEGRID 10th IAEE, EUROPEAN CONFERENCE 7-10 September 2009 in Vienna, Austria

14/04/ TREN/FP7/EN/219123/REALISEGRID Technical Barriers towards system integration combine two factors :  Maturity : it measures TSOs’ vision about the state of development of the studied technology  Accessibility to the technology : it measures TSOs’ capacity to integrate the technology within their own operations The technology ranking methodology: Description

14/04/ TREN/FP7/EN/219123/REALISEGRID A linear combination of the two dimensions, ‘technology maturity” and “accessibility of technology”, gives a picture of the barriers to system integration The technology ranking methodology: Description

14/04/ TREN/FP7/EN/219123/REALISEGRID Technical Performance Potential depends on:  Security improvement  Stability improvement These two factors contribute to the reliability of the system when integrated in the long-run Assumptions  The improvement is defined with respect to the same transmission system without the integration of the studied technology  The technologies are assessed when implemented as a stand-alone solution  This is a limitation of the present work: e.g., the maximization of transmission capacity to face wind issues in some areas of Europe requires the joint use of RTTR, PST and WAMS Technical Performance potential for the system The technology ranking methodology: Description

14/04/ TREN/FP7/EN/219123/REALISEGRID A linear combination of the two dimensions, ‘security improvement” and “stability improvement”, gives a picture of the barriers to system integration The technology ranking methodology: Description