Services For Engineers & Contractors N Pier 1Pier 2 SR3 Cooler, Pier No 2 Photos Drummy Spalled Spalled & drummy Crack Cold Joint Panel Joint Photo “Cooler.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

FOOTING SYSTEMS Reference - As Residential slabs and footings - construction and BCA.
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
2.2 STRUCTURAL ELEMENT BEAM
Pipe Cutting, Beveling, Clamping & Aligning Systems.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Semiconductor Materials and Device Characterization
P247. Figure 9-1 p248 Figure 9-2 p251 p251 Figure 9-3 p253.
WS Atkins Bridge Engineering Research Activities Mike Chubb.
REPAIR MANUAL Dr. Mohammed Maslehuddin Research Institute
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
GEOPHYSICAL STUDIES SITE B GEOPHYSICAL STUDIES PROGRESS OSPER PROJECT SITE B BRUCE SMITH ROBERT BISDORF RAY HUTTON MARK TABACHECK ROBERT HORTON.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Engineering NDT Advanced NDE Pressure Equipment Integrity Management Lab Analysis Development of NDT Inspection Techniques For Heavy Wall Stainless Steel.
FoundationsFoundations The National Association of Certified Home Inspectors.
One Team: Relevant, Ready, Responsive and Reliable Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi Concrete.
ON LINE TRANSFORMER OIL REGENERATION PROCESS OF GT-8
Today’s agenda: Electric Current. You must know the definition of current, and be able to use it in solving problems. Current Density. You must understand.
Visual Survey Tools Defect classification guide
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Damage to Bolu Viaduct from Earthquakes in Turkey Euridice A. Oware Advisor: Dr. Mete Sozen.
Papworths Glossary Of Terms. Visual Assessment  Use grinding core cuts to assess corrosion  Need a standard to define corrosion degree  Correlate with.
The Schoharie Bridge Collapse, Scour By Group 18 4 th Year Civil Engineering Date: 28 th of October 2005.
Daire McCormack Natasha Brady Peadar Barrett.  Constructed in 1928 and spanned the Ohio River between Point Pleasant, West Virginia and Kanauga, Ohio.
CTD - Salinity and Temperature at Depth Jonathan Walter University of North Carolina at Wilmington CHM Jonathan Walter University of North Carolina.
Project #6 Surface Modification of Carbon Nanotubes for Property Improvement Cuong Diep – pre-junior, Chemical Engineering Milena Fernandez – pre-junior,
AMAZE (PU) Spray Applied Waterproofing AMAZE (PU) Spray Applied Waterproofing AMAZE ECO PRODUCTS Presented to: Project Name: ALL PROJECTS.
MAX DNP CO LTD YouTube " max wire saw machine". 1 BIG POWER WIRE SAW MACHINE.
Preparing a Cutting List. A cutting list is an accurate and very detailed list of the different parts that will make up your project/product. Your cutting.
VI-D-15(PP) Disassembly of the Small Engine Figure 1.
Weathering and Erosion
……………..Continued Recap Grinding Machine Operations on grinding machine 1.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
60 Find the start point.. Draw a construction line horizontally across the page. 60.
Scale Bars Scale Bars: images often carry a scale bar which is a horizontal line drawn on the image. The scale bar shows how long the line is in.
Stainless steel 316 CNMG MF 2025 C5-PCLNL HP 3,0 1,5 1,0 0,5 0,25 0,10,15 0,20,25 0,30,350,40,5 1 v c 180 m/min Coolant pressure 7 bar Feed.
Sanitary Engineering Lecture 13
Copyright  2003 McGraw-Hill Australia Pty Ltd PPTs t/a Electrical Principals for the Electrical Trades 5e by Jenneson Slides prepared by Anne McLean Figure.
The reading is 7.38 mm. The reading is 7.72 mm.
ACKURA MACHINING SOLUTIONS 13/42A1, Tex park Road, Coimbatore India. Phone : ,
Sri Gowrish CNC Pvt. Ltd., Coimbatore
AURA LASERFAB PVT. LTD. An ISO 9001:2008 Certified Company
Date of download: 10/10/2017 Copyright © ASME. All rights reserved.
Replacement of Vehicle Bridge over Spring Creek Centre County, PA
Introduction Used for covering spaces in the form of roof or floor
Basswood Lengths and Quantities 12” (305 mm) Bottom Horizontals
Silicon Epitaxial Wafer for Discrete
Cutting Sample Simultaneous 5axis Cutting modes are developed at Version 5. “Undercut Z-level Finishing” creates tool paths at undercut part. “Swarf cutting”
Resistivity modeling.
4th Annual Construction Law Summit
Lead Content Calculation
CMS Gantry for Detector Lowering
Friday, January 19, 2018 (Discussion – Ocean Temperature and Density; Continue Discovery Education Unit - Studying the Hydrosphere, Concept - Ocean Water)
Electrical Stopping Power Electrical Resistance
Heller Horizontal Machining Centres
Concrete A structural material made by combining cement, sand, aggregate, and water.
Comparison of Seismic and Well Data
Graphing.
Figure 1. Procedures for assigning confidence and likelihood qualifiers to the scientific evidence for anthropogenic ... Figure 1. Procedures for assigning.
C6.1 Wenner array. C6.1 Wenner array C6.1 Wenner array.
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg.
Reinforced concrete column
Desig n Compute moment per meter
For More Details:
Volume 28, Issue 2, Pages R58-R60 (January 2018)
Presentation transcript:

Services For Engineers & Contractors N Pier 1Pier 2 SR3 Cooler, Pier No 2 Photos Drummy Spalled Spalled & drummy Crack Cold Joint Panel Joint Photo “Cooler P2-02” Photo “Cooler P2-05”Photo “Cooler P2-04” Photo “Cooler P2-03” Photo “Cooler P2-08” Photo “Cooler P2-07” Photo “Cooler P2-06” Photo “Cooler P2-09” Photo “Cooler P2-10” Photo “Cooler P2-11” Photo “Cooler P2-12” Photo “Cooler P2-13” Photo “Cooler P2-01” Papworth’s Pty Ltd Narngulu Synthetic Rutile Plant January 2004 Inspection By F.Papworth Lyall Murphy Figure 41

Services For Engineers & Contractors Acid Leach Foundation Detail 1 in Area A Cover & Samples xxxx xxxx xxxx 39mm 40mm 41mm 40mm 41mm 42mm41mm 200mm 170mm 160mm 590mm === x Cover in mm, as measured with cover meter 75mm diameter grinding core cut Resistance for 4 probe Wenner method with probes at 50mm centres Vertical 25mm Ø bar cover = 40mm Horizontal 12-15mm bar cover = 67mm Depth of Carbonation = 0mm 630mm 1.29m …. R=2520ohms ALF/S4 ALF/S3 ALF/S2 A B C D E F G H I J K L M N O P Q N …. Detail 1 Papworth’s Pty Ltd Narngulu Synthetic Rutile Plant January 2004 Inspection By F.Papworth Lyall Murphy Figure 5

Services For Engineers & Contractors