CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project Management 6e..
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Advanced Project Management - CPH
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computers: Tools for an Information Age
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Project Management Session 7
Chapter 5: Project Scope Management
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Design, Implementation and Maintenance
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Project Management and Scheduling
The program work breakdown structure (WBS) establishes the essential
Project Management Education
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Effective Methods for Software and Systems Integration
Work Breakdown Structure
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
CPSC 871 John D. McGregor Processes – a first iteration Module 1 Session 1.
Chapter 2 The process Process, Methods, and Tools
Work breakdown structure
1 Lecture 3.1: Project Planning: Work Breakdown Structure (WBS) [SEF Ch 9] Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Week 6: Project Management E1102 – Design Fundamental Using Advanced Computer Technologies Spring 2010.
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
DEFINING THE PROJECT CHAPTER 4.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
© Copyright 2011 John Wiley & Sons, Inc.
Resources Performance time Project Planning Phase : Generating Tasks & Identifying Responsibilities 1.
Geog 469 GIS Workshop Project Management.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
WEEK 3 Project Planning.
© 2005 Prentice Hall, Decision Support Systems and Intelligent Systems, 7th Edition, Turban, Aronson, and Liang 6-1 Chapter 6 Decision Support System Development.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Creating a Work Breakdown Structure with Microsoft Project.
MENG 446 : Management of Engineering Projects
Breakdown Work Structure Applying Management Tools to a Project.
Advanced Software Engineering Dr. Cheng
Introduction to Project Management
Module nine PMP® Mastery 2016 APMG Create WBS
Work Breakdown Structure
Introduction to Tech Communication & Project Management Arthur C.M. Chen , Rm
Chapter 3 Managing the Information Systems Project
Defining the Activities
PLANNING & SCHEDULING (First Part)
Presentation transcript:

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 1 Session Outline What is a WBS and where is it useful? What is successive decomposition? How is the WBS used on a program? How can I tell if I have a good WBS? Numbering notation. Examples. Common errors. Outline

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 2 Where is WBS Useful? Rocket Science? Brain Surgery? CVISN?

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 3 The Work Breakdown Structure Is... “Product-oriented hierarchy of goods and services.” Form: inverted tree; or indented list. Visualizing the entire project. Common framework for planning and control. Vehicle to divide work into tasks that are: Manageable Independent Measurable Integratable Graphically displays entire project. Clear definition of all effort. “Top Assembly Drawing” of the project. “Product Breakdown Structure” or “Project Breakdown Structure” more apt name! Or perhaps “Work Buildup Structure”. WBS Definition

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 4 and so on, while it makes sense more decomposition Create a WBS via Recursive Product-Oriented Decomposition (Call This Level 1) Principal ProductAssociated Support Product Level 2 Associated Support Service Level 2 Principal ProductSub-ProductAssociated Support Product Level 3 Associated Support Service Level 3 Sub-Product Sub-Sub- Product(s) Associated Support Product Level 4 Associated Support Service Level 4 WBS Construction

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 5 Example: Break Down 100% (1 of 2) 100% Decomposition Summation

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 6 Example: Break Down 100% (2 of 2) and so on, while it makes sense more decomposition 20%10% 60%25%10%5%20% 3%2% 100% Summation

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 7 By decomposing, eventually you get to activities that can be assigned and scheduled. WBS Construction

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 8 Example Extended WBS for a Complex Program Note the different orientations from top to bottom. WBS unfolds and evolves as scope and design become known. WBS unfolds and evolves as scope and design become known. WBS Definition The Work to be Done!

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P2 - 9 WBS for Brain Surgery (tree format) Illustrative Sources: 1. Bailey & Loves’s Short Practice of Surgery, 22 nd Edition, edited by Charles V. Mann, R.C.G. Russell, and Norman S. Williams. Chapman & Hall Medical, ISBN Brain Surgery – Complication Avoidance and Management, by Michael L. J. Apuzzo, M.D. Churchill Livingstone, Inc., ISBN See Chapter 1, “Preoperative and Surgical Planning for Avoiding Complications” by Robert G. Grossman.

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Surgical Treatment Project 1.0 Diagnosis History General Medical Condition Specific Complaint Clerking?? (for elective surgery??) Clinical Exam Imaging Ultrasonography Plain Radiography (X-Ray) Computed Tomography (CAT Scan) Magnetic Resonance Imaging (MRI) Blood and Tissue Tests Likely Diagnosis Risk Assessment Education of Patient (e.g. anatomy) Alternative Analysis & Trade-Offs Treatment Plan 2.0 Planning of the Operation Communications Among Team Patient and Team Positioning (for neurosurgery) Acquisition of Needed Instruments & Equipment Scheduling of Needed Specialists Practice Run-Throughs 3. 0 Preoperative Patient Care Verify Patient can Handle Stress of Surgery Stop Drugs that Would Interfere with Surgery 4.0 Execution of the Operation (Actual Surgery) Verify Patient Identity and Location of Surgery Anesthesia Patient Under the Knife Real-time Diagnostic Biopsies Therapeutic Surgery Vital Signs and Fluid-Loss Monitoring Neurophysiological monitoring (during neurosurgery) Maintain Neat and Clean Operative Field Wrap-up: Verify Small Part Count (sponge, needle, cottonoid, Michel clips) Operative Notes and Chart Updates 5.0 Postoperative Care Written Care Orders Briefing of Recovery Staff by Surgeon Vital Signs and Fluid-Loss Monitoring Neurophysiological Monitoring 6.0 Long-Term Patient Care Follow-up Clinical Visits Physical Therapy Illustrative WBS for Brain Surgery (indented list)

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P WBS is The Basis For Cost estimates and budgets. Milestones & schedules. Responsibility assignment. Allocation of resources. Schedule horizontal and vertical traceability. Risk analysis. Concurrence of participants. Integrating the total project effort. Summarizing costs, schedules, performance. Forcing the Project Manager to think through all elements of the project. WBS Definition

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Tests for a Good WBS:  Product-oriented hierarchy of goods and services.  Top level may be dictated by contract.  Basis for cost estimating, project organization, assigning responsibility, task scheduling, and status reporting.  Basis for understanding and communication.  Each element should be “manageable”.  Based on System Engineering: interfaces are minimized; units are stand-alone testable.  Eliminating one product element will delete the associated costs.  Segregate recurring from non-recurring costs.  Identifies and defines all effort to be expended: correlation of lower levels to specification tree, contract line items, data items, and work statement tasks.  Useful! Reflects the way the work is managed and performed.  Sufficiently low level to establish adequate visibility and confidence for cost estimating, project planning, and project control.  Technical/cost/schedule can be integrated at every level for each element. WBS Definition

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P WBS Levels & Numbering Notation Satellite Mission Project 1. Project Management 2. Science Instruments 2.1 Magnetometer 2.2 Spectrograph 3. Spacecraft Bus 3.1 Propulsion Subsystem 3.2 Attitude Control Subsystem 3.3 Command & Data Handling Subsystem C&DH Hardware Processor Card Memory Card C&DH Software Subsystem Integration 4. Ground Support Equipment WBS Definition Level 1 (Level 1) Level 2 (Level 2) Level 3 (Level 3) Level 4 (Level 4) Level 5 (Level 5)

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Exercise Scenario Exercise Imagine you are working at the Atlantic Pacific Sea Vision Fountain Pen Manufacturing Company Let’s develop a WBS for our proposed mechanical pencil project. Motto: “Yesterday’s Technology Solving Today’s Problems Tomorrow”

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Key Concept: The WBS is a product-oriented, hierarchical list of the work to be done. The program plan is linked to the system design through the upper levels of the WBS. CVISN State System Design Program Scope CVISN State Program Plan Program Implementation Detailed Design by Subsystem Detailed Design Rolling Wave Plans (3-6 months) Detailed Phase Plans Work Breakdown Structure Screening Project Plan Credentials Project Plan Safety Project Plan WBS Concept

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Where Does the Work Get Done?!! Satellite Mission Project 1. Project Management 2. Science Instruments 3. Spacecraft Bus 3.1 Propulsion Subsystem 3.2 Attitude Control Subsystem 3.3 Command & Data Handling Subsystem C&DH Hardware Processor Card Engineering Design Layout & Package Design Fabrication Assembly & Test C&DH Software Command Parsing Module Architectural Design Detailed Design Coding Unit Test Subsystem Integration Integration Plan Integrate Instruments with Bus 4. Ground Support Equipment WBS Definition Product-Oriented Nouns Process-Oriented Here is real work! Verbs

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Typical WBS for a State CVISN Program WBS Sample Level 1 Level 2 Level 3

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Elements Not to Include in WBS Do not use the structure of the contractor’s organization as the basis of a WBS. At the top levels do not begin by decomposing into the functions or cost categories associated with developing those products. Adapted from Department of Defense Handbook – Work Breakdown Structure, MIL-HDBK-881. Available at: Includes examples from the defense industry. Program DesignBuildTest HardwareSoftware What not to do! Do not use generic names -- use actual system names and nomenclature. No disembodied software -- software developed to reside on specific equipment must be identified as a subset of that equipment. WBS Definition

CVISN Planning Workshop The Johns Hopkins University Applied Physics Laboratory Day 0, P2 Work Breakdown Structure Review & Prep! 4/13/2015 5:28 PM P Common Errors When Creating WBS Does not include all of the work. Example: The project calls for a prototype and a final version, but the WBS shows only one of these. Or it shows the prototype in detail, and then simply lists the other without showing the work needed to produce it. The level of detail is not sufficient to manage the program. Example: The big pieces may be there, but they are not broken down sufficiently to enable the work to be assigned, tracked, and managed. (The test would be: Can you use this WBS to make a good, detailed CPM network?) Important but not readily apparent steps are left out. Example: The omission of integration and testing. The work is there, but it’s not arranged logically. Example: Lower-level product integration and testing is there, but its off on its own and you cannot tell what it is to be applied to or when. WBS Definition