WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
NPDES NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM What SC private landowners should know before applying forestry pesticides Presented By: Joey Ferguson,
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
Public Health Pesticides and the Clean Water Act: Current Status Joseph M Conlon Technical Advisor.
1 Effluent Guidelines for Construction Greg Davis USEPA
©Lloyd Gosselink Rochelle & Townsend, P.C. Presented by: LAUREN KALISEK (512) Congress Avenue Suite 1900 Austin, Texas.
MT Department of Environmental Quality (DEQ) Water Protection Bureau February 12, 2014 Christine Weaver.
PGP Scenario #2 You are automatically covered. You do not have to submit a NOI.
Pesticides General Permit Development Of Proposed Draft Permit To Provide Permit Coverage by April 2011 Water Quality Advisory Workgroup Aug. 3, 2010.
Future of the Construction and Post Construction Water Quality Program
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
NPDES Pesticide General Permit NPDES Pesticide General Permit In October 2012, the DOH issued a NPDES General Permit to authorize point source discharges.
Ohio General Permit Conditions.  Applications “in, over or near” water  Must have NPDES by October 31, 2011  General NPDES permit.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
PGP Scenario #4 You are not qualified for PGP coverage. You may need an Individual NPDES Permit.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
National Pollutant Discharge Elimination System (NPDES) NPDES in effect on November 1, 2011 Presentation by : Tom Janousek, Pest Consulting Services, Omaha,
Module 7: Construction Phase
PGP Scenario #3 You are not automatically covered. You must submit a NOI.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
PGP Scenario #1 PGP Does Not Apply to You. Will you be applying a pesticide to a State water or will the pesticide get into a State water during its.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
City of Puyallup Planning Commission Presentation February 8, 2012.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Overview of the Final EPA Concentrated Animal Feeding Operations (CAFO) Regulations April 1, 2003.
Construction Site Best Management Practices and the Project Design Process.
Introduction to MS4 Stormwater Requirements (2009)
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Applicator Training April 2011 Elise Doucette. Legal Decisions 2008 The Nat’l Cotton Council of Am, et al. v. EPA. As a result, a NPDES permit is required.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
P ESTICIDE NPDES P ERMIT – D O Y OU N EED O NE ? Darin LeCrone & Leslie Lowry Illinois Environmental Protection Agency.
Stormwater Pollution Prevention Program Compliance
Municipal Separate Storm Sewer System (MS4) Permit
TPDES Construction Management at the City of Laredo
Sacramento County Stormwater Quality Program
John Tinger U.S. EPA Region IX
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
General NPDES Permit for Pesticide Application Point Source Discharges
Sacramento County Stormwater Quality Program
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY

Today’s Presentation  Introduction  Large Construction General Permit (LCGP)  Storm Water Pollution Prevention Plan (SWPPP)  Notable Changes to the LCGP  CWA Permits for Pesticide Application  Background  Permitting Information  Conclusion

Introduction  Clean Water Act  Discharge of any pollutant from a point source into surface water of the United States  WYPDES Program  Wyoming Pollutant Discharge Elimination System Storm Water Discharges - Construction Non-Storm Water Discharges - Pesticides

Introduction  “General Permit”  A Single Permit Issued to Cover a Large Number of Similar Discharges within an Area  WDEQ Reviews WYPDES Permit Applications  Determines if an individual permit is required

Large Construction General Permit  Wyoming Water Quality Rules & Regulations  Chapter 2  Minimization or Elimination in Storm Water Runoff Including Sediment  Land Disturbance of Five or More Acres  Does Not Have to be Contiguous  Smaller Construction part of Larger Development  LCGP Continues Until Site is “Finally Stabilized”  Re-vegetated to 70% of Natural Cover

Storm Water Pollution Prevention Plan  LCGP Requires a SWPPP  Must be submitted with Notice of Intent (NOI) to WDEQ 30 Days Before Construction Begins NOI - Describes the construction project  SWPPP  Describes Potential Pollution Sources  Best Management Practices (BMPs)

Notable Changes to LCGP  LCGP was renewed March 15, 2011  5 Year Permit - Expires March 15, 2016  Revised Definitions  “Finally Stabilized” - Vegetation Must be Adaptable  “Operator” - Expanded Entities that have the ability to modify project plans  “Reportable Quantity” - Reporting of Spills to WDEQ

Notable Changes to LCGP  SWPPP must be Consistent with TMDL  Total Maximum Daily Load Sediment, Suspended Solids, or Turbidity  NOI Requirements Expanded  “Common Plans of Development or Sale”  Must Identify Potential Storm Water Discharges to Waters with an Approved TMDL or on 303(d) List  Potential Discharges to Class 1 Waters

Notable Changes to LCGP  Effluent Limitations - New Federal Regulations  Erosion & Sediment Control Minimum Standards  Removal of Sediment Transported Offsite  Protection of Storm Drain Inlets  Offsite Tracking of Sediment to Paved Areas  Stabilization of Disturbed Areas for Stalled Activity

Notable Changes to LCGP  SWPPP Requirements Expanded  Joint SWPPPs Minimum Standards  Changes Made within 30 Days of Inspection  Uniform Format - SWPPP Template  Site Map Requirements  BMP Minimum Standards  Maintenance of Inspection Records

CWA Permits for Pesticide Application  FIFRA / CWA  Federal Insecticide, Fungicide & Rodenticide Act  Litigation  National Cotton Council v. EPA - Sixth Circuit Chemical Pesticides Regulated Under NPDES Program  January, 2009: Vacated EPA Rule  February, 2010: U.S. Supreme Court Denied Cert  EPA Requested Two Year Delay

CWA Permits for Pesticide Application  Effective Date: April 9, 2011  Extension: October 30, 2011  Wyoming Issued: March 14, 2012  Expire December 31, 2015  Regulatory Burden  Affects 5.6 Million Applications Annually  365,000 Applicators

Major Pesticide Discharge General Permit General Permit Authorizes Discharges of Pesticides TO, OVER, IN Water of surface waters of state associated with:  Mosquitoes and Other Flying Pests  Aquatic Weed and Algae Control  Aquatic Nuisance Animal Control  Forest Canopy Pest Control  Discharges to Class 1 Waters

Treatment Thresholds  Mosquitos and Other Flying Insect Pests  640 Acres of Treatment Area  Weeds and Algae  80 Acres of Treatment Area  20 Linear Miles at Water’s Edge  Forest Canopy  6400 Acres of Forest Canopy  Opt-In

Permit Categories  None  Minor  Pesticide Applications that do NOT Exceed Thresholds OR  Major  Pesticide Applications that DO Exceed Thresholds  Any Pesticide Application near Class 1 Streams of State

Minor Permit  No Fees  No Notice of Intent  No Annual Reporting Requirements  “Honor System” Permit  Only Need to Show if Complaint Filed and DEQ Investigates

Minor Permits  Permit Conditions  Narrative rather than Numeric  Based on Best Management Practices  Reference FIFRA Label Instructions  Equipment: Maintenance, Calibration and Cleaning Required  Monitoring  Record Keeping  Adverse Incident Documentation & Reporting

Major Permit  Filing Fee = $100 per year  Notice of Intent  Authorization  Annual Report due February 28 th  Covers Previous Calendar Year  Pesticide Pollution Prevention Plan

Notice of Intent  When to File  Contact Information  Location of Records  Treatment Area Locations  Type of Pesticide Use Pattern  Map  Other Information  Certification

Annual report  Form Available from DEQ later this Year  Application Information  Weather Conditions  Calibration/Repair Documentation  Adverse Incidents

Pesticide Pollution Prevention Plan  Deadlines  Know or Should Know: Prior to First Discharge  Did not Know or Should Not have Known: Prior to Exceeding Threshold  Emergency: No Later than 90 Days  2012: By December 31, 2012  Signature  Must Identify Responsible Individual  Must be Updated Once per Year

P4 Requirements  Protocols  Spill and Adverse Incident Response Procedures  Application Equipment  Lowest Effective Amount of Pesticide  Treatment Areas  Use Patters and Application Dates  Names of Product and Amount Used  Environmental Conditions

P4 Requirements (cont)  Document Unusual Effects to Non-Targets  Document Equipment Calibration, Cleaning and Repairs  Prior to First Application  Identify Target Species  Identify Factors Contributing to the Problem  Establish Densities of Target

P4 Requirements (cont)  Implement Efficient Means to Minimize Discharges from Pesticides  No Action  Prevention  Mechanical or Physical Methods  Biological Control Agent Used  Pesticide Use

P4 Requirements (cont)  If Pesticide Selected:  Conduct Surveillance  Assess Environmental Conditions  Evaluate using Pesticides against the Most Susceptible Development Stage of Target Pest

Questions  Kara Brighton Hageman & Brighton, P.C. 222 E. 21 st Street Cheyenne, WY