UNSW Strategic Educational Development Grants

Slides:



Advertisements
Similar presentations
DOs and DONTs Joan-Anton Carbonell Kingston University EC External Expert TEMPUS Modernising Higher Education TEMPUS INFORMATION DAY.
Advertisements

ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
UQ Teaching and Learning Small and Large Strategic Grants Scheme Second Round Applications 30 October 2007.
Performance management guidance
PaceSetter in HMRC Competitive Dialogue Procurement Invitation to Participate in Dialogue Supplier Outline Solution Template NB: This is intended only.
Demonstration of sustained effective leadership in academic practice and academic development Evidence of impact on high quality student learning Draw.
Trainer Recognition and Accreditation. New Arrangements for Trainer Recognition and Accreditation  In August 2012, the GMC released a document ‘Recognising.
Writing an Effective Proposal for Innovations in Teaching Grant
UQ Teaching and Learning Small and Large Strategic Grants Scheme 14 June 2007.
Performance management guidance
Global Poverty Action Fund Community Partnership Window Funding Seminar January 2014 Global Poverty Action Fund Community Partnership Window Funding Seminar.
Seminar on IT Project Management for the Social Welfare Sector LF Applications in Respect of IT Projects Mr KOK Che-leung Chief Social Work Officer (IST)
1 Teaching Excellence Network Citations Workshop Associate Professor Catherine Sinclair (Academic Coordinator, ALTC Initiatives) Associate Professor Janne.
All Ireland Institute for Hospice and Palliative Care Process, criteria, structures…
Writing Carrick Institute Learning and Teaching Grants Tips for success Judith Lyons Learning and Teaching Development.
Challenge Questions How good is our operational management?
Date (Arial 16pt) Title of the event – (Arial 28pt bold) Subtitle for event – (Arial 28pt) Internal models Gareth Truran Head of Department, London Markets.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Making a successful application for a Teaching and Learning Strategic Grant Some advice arising from a Carrick Institute Leadership Development Grant project.
Teaching and Learning Grants Workshop Teaching and Learning Enhancement at UQ Professor Deborah Terry 8 February 2008.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Workshop for New Zealand Health Delivery Research Investment Stream Project Applicants.
COD Institutional Effectiveness Process (IEP) Planning, Assessment, Allocation Learn More.
Presentation by Wendy Launder General Manager CRC and Small Business Programs.
UNSW Teaching Fellowships Information for Applicants Professor Stephen J. Marshall Director, Learning and UNSW.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Grant Round 2016 Making an application Institute for Teaching and Learning September 2014 Dr Alison Kuiper 1.
Foundation Degrees Foundation Degree Forward Lichfield Centre The Friary Lichfield Staffs WS13 6QG — Tel: Fax: —
IAOD Evaluation Section, the Development Agenda (DA) and Development Oriented Activities Julia Flores Marfetan, Senior Evaluator.
School Finances for Finance Subcommittees School Councils.
March 26-28, 2013 SINGAPORE CDIO Asian Regional Meeting and Workshop on Engineering Education and Policies for Regional Leaders Programme Evaluation (CDIO.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Biennial Report October 2008.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Carrick Grants Scheme Overview of key aspects and application processes Professor Deborah Terry 8 February 2007.
Define the project identify potential funding sources gather information write and package the proposal submit the proposal to a funder Piece of cake?
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Grant Round Drafting your application Institute for Teaching and Learning September 2014 Dr Alison Kuiper 1.
Oregon 10-Year Plan for Oregon Project Boards and Commissions Briefing.
Common Core State Standards: Supporting Implementation and Moving to Sustainability Based on ASCD’s Fulfilling the Promise of the Common Core State Standards:
1 Part 4 Self-review and certification Your progress as a curriculum developer Part 4 Self-review and certification Your progress as a curriculum developer.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
July 2007 National Quality Assurance and Accreditation Committee & Quality Assurance and Accreditation Project Role of Action Planning in The Developmental.
Kathy Corbiere Service Delivery and Performance Commission
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Capabilities Analysis Briefing for Chancellor and Senior Leaders.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
SIF II Briefing Session 21 st September Briefing Session Content SIF Cycle I – overview Funding and arising issues SIF Cycle II – Process for evaluation.
National Coordinating Center for the Regional Genetic Service Collaboratives ( HRSA – ) Joan A. Scott, MS CGC, Chief, Genetics Services Branch Division.
1 DEMONSTRATION PROJECTS TO ENSURE STUDENTS WITH DISABILITIES RECEIVE A QUALITY HIGHER EDUCATION PROGRAM Performance Measurement, Program and Project Evaluation.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Grant Timms Senior Examiner Assignment brief December 2013 / March 2014 Marketing Leadership & Planning.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Project Planning and Management Gail Campbell and Tom Broadhurst.
Stages of Research and Development
Strategic Information Systems Planning
2017/18 SIP Request Process September 2016.
Presentation on the Application Process
Professor Salary Incentive Program
Teaching Excellence Development Fund
Helene Skikos DG Education and Culture
Definition of Project and Project Cycle
OLT Information session
Assessing Academic Programs at IPFW
Portfolio, Programme and Project
PRESENTATION TITLE Faculty Enhancement and Instructional Development (FEID) Proposal Support Sharon Seidman, Ph.D. (HHD) and Erica Bowers, Ed.D. (Director,
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
AICT5 – eProject Project Planning for ICT
Presentation transcript:

UNSW Strategic Educational Development Grants Information for Applicants Professor Stephen J. Marshall Director, Learning and Teaching @ UNSW

Nature of UNSW’s Strategic Educational Development Grants Applicants for Strategic Educational Development Grants will be faculties seeking support for faculty endorsed and driven large scale strategic projects aimed at enhancing the educational performance of UNSW in a number of key priority areas outlined in UNSW L&T Strategy 2014-2018 Project funding is to support the development, initial implementation and early evaluation of educational initiatives. There are no plans to allocate additional funding to sustainably implement educational changes recommended by the projects - a key principle of a projects development must be that there is no net increase in the cost of program delivery. It is anticipated that projects will run across 1 to 3 semesters with the majority of projects being 2-3 semesters in duration. A maximum of $100,000 per grant is available each semester for three semesters.

Funding Priority Areas In 2014 – 2016 UNSW’s Strategic Educational Development Grant funding priorities include projects directed at: sustainably enhancing the quality of large scale stage 1 and 2 courses delivering improved, personalised large scale assessment and feedback utilising innovative educational technologies to implement/facilitate high quality blended learning enhancing the student experience through the considered use of the “flipped classroom”.

Project Deliverables Submission of a Progress Report in the required format (1-2 pages) to the DVC(A) at the end of each semester A Final Project Report in the required format (8-10 pages) to the DVC(A) at the end of the project Evidence of sustained change in policy and/or practice in one or more of UNSW’s priority areas for educational change Open sharing throughout the University of any insights, developments or materials (including educational technology, software, and/or resources) that have resulted from the proposed project.

Application Process The primary process of application for a UNSW Strategic Educational Development Grant is through a written project proposal that addresses each of the following on the required Application Form: Project Summary (250 words maximum) Project Description (4 x A4 pages maximum) Outcomes and Rationale for how the project will address one or more of UNSW’s current priorities for L&T Innovation Grants. Approach – a description of what will be done to ensure that the proposed project delivers its stated outcomes including a description of the project’s proposed governance, management, and work packages. Value/Need for the Project – a description of the potential usefulness of the proposed project and its outcomes to the development of policy and/or practice in learning and teaching in the applicant’s faculty/school or UNSW as a whole. Project Timeline (1 x A4 page maximum) Project Deliverables (1 x A4 page maximum) Project Budget - A fully justified (2 x A4 pages maximum) description of how the total costs associated with the proposed project will be met, including a description of how funding received via the UNSW Strategic Educational Development Grant will be deployed to develop, deliver, assess/evaluate and report the outcomes of the project.

Endorsements Since it is intended that the outcomes of projects/initiatives funded by this grant be sustainable, it is necessary for ALL applicants to be endorsed by the Dean of the faculty or faculties concerned and anyone else with responsibility for approving any on-going budget, resources or organisational changes that may be necessary to sustain these outcomes.

Selection Criteria The clarity of the articulated outcomes and arguments to demonstrate how the project will address one of UNSW Learning and Teaching Priorities for 2014-2018. The potential usefulness of the proposed project and its outcomes in significantly improving UNSW’s educational performance. The strength of the conceptual and theoretical frameworks that underpin the proposed approach. The appropriateness and coherence of the proposed approach with the project’s stated outcomes. The appropriateness of the project’s proposed governance and management arrangements. The appropriateness of the project’s plans for the evaluation, dissemination and embedding of project outcomes in the policies/practices of the applicant’s faculty/school or UNSW as a whole. The appropriateness of the Project’s proposed budget and the strength of its justification.

Timelines and Closing Dates for Applications Proposals for projects to be funded by a UNSW Teaching Fellowship Grant will be called for ONCE in 2014 for commencement in January 2015.   Call for Proposals 21 August 2014 Close for Support from DVC(A) 27 Oct 2014 Close for Endorsed Applications 13 November 2014 Notification of Outcomes to Applicants 11 December 2014 Successful Round Projects Commence 6 Jan 2015

Preparing Your Application

Avoid Common Conceptual Weaknesses Failure to adequately describe the NEED for educational change What is the educational issue that the project seeks to address? Why is this an issue? What is /are the educational contexts in which this issue arises? Why/how does this issue arise in these contexts? What is/are the impact(s) on learning/teaching when this issue arises?

Avoid Common Conceptual Weaknesses Failure to adequately describe and justify the PROPOSED educational change What do you propose needs to change to address this issue? Why do you believe such a change will address this issue? What is the conceptual and theoretical justification for this approach? Failure to clearly articulate the purpose and intended outcomes of the proposed project What role will the proposed project play in addressing this issue? What will the project facilitate and/or deliver that will help to realise the proposed educational change and address this issue?

A Framework for Identifying and Justifying the Need for Educational Change MAP and DESCRIBE Current Practice IDENTIFY Strengths and Weaknesses of current practice Determine the assumptions, values and beliefs that INFORM Current Practice         RECONCEPTUALISE current practice based on these new assumptions, values and beliefs Determine how these assumptions, values and beliefs NEED TO CHANGE for the future CONFRONT the appropriateness of these assumptions, values and beliefs for future practice    

Avoid Common Conceptual Weaknesses Failure to adequately describe and justify the approach to be taken to effect the change What dimensions of current practice need to change? How do each of these dimensions of current practice need to change? What needs be done to realise the changes required to each of these dimensions of current practice?

A Framework for Identifying Foci for Educational Change

A Framework for Planning Educational Change IDENTIFY the work packages and deliverables that will need to be realised to effect the proposed change ESTABLISH the governance, management and organisational arrangements necessary to oversee and effect the change INITIATE the change by accessing and aligning the necessary resources to each work package         Resolve any outstanding or emerging issues in order to INSTITUTIONALISE desired change Monitor and EVALUATE the effectiveness of combined work packages to realise the desired change IMPLEMENT and Monitor each work package to ensure that they deliver as required    

Avoid Common Conceptual Weaknesses Failure to adequately describe and justify the approach to be taken to managing and effecting the educational change Who will be responsible for the overall governance of the project – i.e., for ensuring the project is appropriately planned and managed, and that it delivers what is required in time and in budget? Who will be responsible for the overall management of the project and the coordination of the various work packages and teams to ensure that the project utilises its available resources effectively and efficiently to deliver what is required in time and in budget? Who will contribute to the realisation of each work package?

Typical Project Governance and Management Structure ? Project Governing Board Project Leader Project Advisory Group ? ? Project Manager Project Team ? Work Package 1 Work Package 2 Work Package 3 Work Package 4

Avoid Common Conceptual Weaknesses Failure to adequately describe and justify the approach to monitoring and evaluating the educational change How will the progress of each work package be monitored? Who will be responsible/involved? What will be the indicators of successful progress/completion of each work package? How will the project’s overall success be monitored and evaluated? Who will be responsible/involved in monitoring the project’s progress? What will be the indicators of appropriate progress? Who will be responsible for evaluating the overall success of the project? What will be the indicators of the project’s overall success?

A Framework for Planning the Evaluation of Educational Change Purpose of the Evaluation Formative? Summative? Foci of the Evaluation ? Timing of the Evaluation Stakeholders interests in the evaluation Indicators and measures of success Process of the evaluation Dissemination and reporting of the findings of the evaluation

Avoid Common Technical Weaknesses Project is not appropriate for the particular type of grant The scope of the project is too great for the funds available The project does not address any or all of the required priorities for funding The project neither addresses a particular educational need, nor is it particularly innovative in either its design or proposed outcome(s) Applicants do not meet the eligibility criteria for the grant Inexperienced / inappropriate experience Project description does not effectively address all required selection criteria Too much time spent on one criterion over another or one or more criteria are not addressed at all

Avoid Common Technical Weaknesses Project budget is inappropriate Seeks funding for categories of expenditure that are not approved Budget expenses do not align with proposed project method/approach Budget expenses are distributed inappropriately throughout the life-cycle of the project Budget expenses are excessive given the nature and scope of the project Budget comprises a series of ambit claims Derivation of budget expenses not articulated Justifications for budget expenses not provided

Project Planning Template

Avoid Common Technical Weaknesses Grant Application not submitted in the required format NOT on the correct form NOT structured in the required manner (uses all required headings) NOT in the correct font or font size Does NOT contain all of the endorsements required etc.