31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN.

Slides:



Advertisements
Similar presentations
CAAC ADS-B Implementation Introduction
Advertisements

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Overview of Continental En-route Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
Enroute Design 1 Lead Instructor:
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Performance based navigation: The ICAO PBN programme
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
PBN Plan Development Aviation Industry Forum 18 November 2009.
Enroute Design 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Regulatory Plan to support the future ATM system in Australia UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10.
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
EVOLUTION TOWARDS PERFORMANCE BASED NAVIGATION AND INCREASED OPERATIONAL FLEXIBILITY WORLDWIDE ALAIN BELANGER MANAGER PRODUCT PLANNING MARCH 12,
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Federal Aviation Administration 0 0 Required Navigation Performance (RNP) in the United States Presentation to: US/Europe International Aviation Safety.
Performance Based Navigation
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Aramco. We will first look at the evolution of navigation approvals. Next we will look at navigation specifications in detail. Finally we will look implementation.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
AABI Winter Meeting February 2015 PBN and RNP Training.
GNSS Aviation Applications
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
The Benefits of RNP-RNAV in Commercial Operations 4 th Steering Committee Meeting COSCAP-North Asia 2, 3 March 2005, Shanghai, PRC Captain Frank M. Hankins.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
The Research of One Engine Inoperation for RNP Presented by Wang Zhong.
From RNP Divergence to Performance Based Navigation Convergence
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March Dave Nakamura ICCAIA/Boeing Member to ICAO OCP and RNP SORSG.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
Performance Based Navigation Today & Tomorrow An FAA Perspective
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
1 Dave VanNess Implementation and Resource Development Coordinator Performance Based Navigation Programme ICAO, Montreal Dave VanNess Implementation and.
Overview of the PBN Airspace Implementation Processes
Performance Based Navigation The Future
FAA NAVAID Rationalization / Resiliency Overview
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Overview of Continental En-route Navigation Specifications
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Regional RAIM Prediction System – Progress Report
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
Workshop on preparations for ANConf/12 − ASBU methodology
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
China Sales Performance
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Oceanic and International Operations
Oceanic and International Operations
ASEAN PBN Routes Objectives:
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
RNAV and RNP Strategy in Japan
Geo Units Formation Dates In China
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN ICAO HQ Activities Overview
Presentation transcript:

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 2 BACK GROUND Operation at high elevation airports Traffic Increase

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 3 Operation At High Elevation Airports  General High Elevation Airport: At or above 1500 m (4922 ft) but below 2438 m (8000 ft). In service:12, On construction:3  Very High Elevation Airport: At or above 2438 m (8000 ft). In service:6, On construction:3 Bangda ( 4334m/14220ft )  More coming……

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 4 RNP/RNAV  WGS-84 is approved to be used in CAAC.  RNAV  RNP

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 5 RNAV/RNP - En route  Remote/Oceanic RNP10 South China Sea RNP4 FANS route , Parallel route L888 Y1 Y2 Y3  Busy Area RNAV 2 RNP 2

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 6

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 7 RNAV - Terminal  RNAV1/RNAV2 AC June Operation Guidance for RNAV1 &RNA2 in Terminal and Enroute Flight  RNAV SID/STAR : main international airports RNAV1 Beijing, Shanghai(2), Guangzhou, Shenzhen, Wuhan, Shenyang, Xian, Chengdu, Wulumuqi

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 8 RNP - Approach  AC Feb Airworthiness and Operation requirement for special SAAAR RNP procedure Equivalent to FAA Notice  AC Dec Airworthiness and Operation requirement for public SAAAR RNP procedure Equivalent to FAA AC  CAAC IB Jan.11, 2007 Construction criteria for RNP/AR procedure Equivalent to FAA Order

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 9 RNP projects  Lhasa,Boeing757,  Linzhi Air China , B ,July 2006 China Eastern, B ,May 2007  Jiuzhai Air China , B , Feb.2006  Airbus program  More airports/airlines ……

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 10 RNP AR projects  Lhasa, Night Flight, RNP0.3 June 2008  LiJiang China Eastern, Boeing, B ,May % RNP0.3 operation (6 Boeing operators and 4 Airbus operators)  YanJi, Bangda,HuangShan,XiNing Airport  Develop common application package for operators

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 11 P

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 12 Linzhi RNP  Location : Tibet , Valley of Yuluzhangbu River  Elevation:2949m/9675ft  Terrain: Narrow and steep valley  High mountains of 4000m around the airport  Complicated weather  The most challenged airport in China  10,000,000 USD for ground Navaids

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 13 Linzhi

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 14

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 15

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 16 PBN Roadmap  According to ICAO ’ s request  Guidance for fully implementing PBN  Time Frame:  Cooperation with Boeing  Expected to be released in March 2009

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 17 Advise Circular  AC Feb Operation Guidance for RNAV5 ICAO Template Recommend for Contract States

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 18 RNAV(GNSS) project  Test flight in CAAC flight college  Baro-VNAV combined  Drafting AC on RNP APCH

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 19 RNP equipage Retrofit  Project supported by CAAC  Focused on B737NG and A320 family  GPS Retrofit is also a part

31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 20 THANK YOU 29th,May, Verification flight