STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Standards Review Subcommittee Update February 1, 2011.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Bulk Electric System Definition Task Force Update Joint Standing Committee Meeting October 21, 2010 Brian Theaker, BESDTF Chair.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair.
Overview of WECC Comments to FERC on the NOPR Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Kenneth Wilson WECC Staff
Definitional Exclusions Reporting Process. 2 Anticipated process to be communicated in coming months (Webinars, Special Outreach, etc.) Working with WICF.
FRCC Fall Compliance Workshop October , 2013
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
Compliance Application Notice Process Update and Discussion with NERC MRC.
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
NERC Reliability Standards - Development Process: Involvement & Needs Presentation to MOSC January 14, 2004 Khaqan Khan Independent Electricity Market.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Standards Review Subcommittee Update August 17, 2010.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Project Update TOP/IRO Reliability Standards NERC ORS May 6, 2014.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
NERC Project PRC-005 FERC Order No. 803 Directive ​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
RFC Webinar April 24, 2009 and May 1, 2009 Presented By: Mark Kuras Chair, Generator Verification SDT.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Missing Measures and Compliance Elements Standard Drafting Team (CESDT) Team Members: Maurice Casadaban (Chairman) Entergy Services John Blazekovich (Vice.
Project Standard Drafting Team (IRO SDT) Stephen Solis, IRO-SDT NSRS Meeting June 1, 2015.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC – NERC Standards Update
Rachel Coyne Manager, Reliability Standards Program
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
NERC Cyber Security Standards Pre-Ballot Review
Background (history, process to date) Status of CANs
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Workshop Session 1: Overview
Reliability Standards Development Plan
Project Definition of Bulk Electric System
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
Standards Review Subcommittee Update
Steve Rueckert – Director of Standards
NERC Reliability Standards Development Plan
Standards Development Process
Standards Review Subcommittee Update
North America Energy Standards Board
Presentation transcript:

STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT NERC PROJECT 2010-17

BES Definition PHASE 1 Proposed new BES Definition and Exception Process approved by NERC BOT and filed with the FERC in January, 2012 FERC NOPR issued proposing to approve the new definition and exception process but soliciting comments on some parts of the definition FERC Order issued on December 20—approved definition with some directed changes /clarifications FERC Order Major features/directed changes: Entities seeking exclusion of “local distribution facilities “ otherwise included in the BES would appeal directly to FERC (Seven Factor test used as starting point along with “other factors”) Lines >100 KV that are looped by a <100 KV line are not radial in nature and are not excluded under Exclusion E1 (although the < 100 KV loop(s) would be excluded unless brought in by the exception process). However, the entire system could qualify for Exclusion E3 (Local Network).

BES Definition FERC Order PHASE 1 Interconnection lines (>100 KV) for Generators included by I2 are directed to be included in the BES as part of E1 implementation. If owned by GO, NERC can register GO as TO/TOP with select set of applicable standards or consider tie-line as part of generator (applies to E3 also) Directs NERC to modify Exclusion E3 to include networks looped at voltages < 100 KV for consideration (proposed definition limited LNs to 100 KV to 300KV) Exception Process Confirms that burden of proof lies with submitting entity Expects Registered Entities and Regional Entities to identify sub-100 KV elements that should be included in the BES, but affirms FERC’s ability to order such elements (and any other elements) to be included in the BES

BES Definition PHASE 1 FERC Order Exception Process NERC can request the Regional Entities to include elements in the BES (aimed at sub-100 KV systems) Basic tenet is that Registered Entities will determine which of their facilities are part of the BES by the application of the BES Definition in its entirety. Registered Entities are required to notify the Regional Entities when an element is no longer part of the BES FERC suggested that other issues brought by commenters be pursued in Phase 2 by those stakeholders The FERC Order is subject to FERC’s due process for requests for rehearing, etc. and the BES SDT will respond to the final order.

BES Definition PHASE 1 Standard Drafting Team (SDT) posted for comments a detailed guidance document containing the BES Definition application methodology as envisioned by the SDT with detailed examples for various configurations Examples illustrated the hierarchy of applying the BES “core” definition and the Inclusions and Exclusions that make up the total BES Definition The comments and the FERC Order are currently being considered. Changes will be made to the guidance document when the FERC Order is finalized and again with the completion of Phase 2.

Phase 2—Standard Authorization Request (SAR) BES Definition Phase 2—Standard Authorization Request (SAR) The SAR was posted for comments in early 2012, comments incorporated and SAR was approved by the NERC Standards Committee SAR proposed four areas for further consideration Technical justification of appropriate thresholds for including Real and Reactive Resources in the BES Determine if there is a need to change the Phase 1 basis of a non-contiguous BES

BES Definition Phase 2--SAR Determine if there is technical justification to revise the 100 KV bright-line voltage level Determine if there is technical justification to allow power flow out of a local network (Exclusion E3) under certain conditions and, if so, what magnitude and duration should be allowed. In addition, the SAR proposed to clarify certain items based on industry comments and to determine if any other improvements in the definition could be made In addition, the SAR is broad enough to respond to changes due to the FERC Order on Phase 1 Definition

BES Definition Phase 2 The SDT formulated a problem statement containing details of the four Phase 2 issues--sent to the NERC Planning Committee (PC) for analysis by their appropriate technical subcommittees The PC recommended no changes in the definition with the exception of Exclusion E3 (Local Networks) PC recommended changes in E3 involve extension of “no outflow” to any of the interconnections of the LN with the BES and limiting the LN to 300 MW of load

BES Definition Phase 2 The BES SDT is considering changes in Inclusion I4 (Phase 1 dispersed power producing resources) to clarify I4 and more closely correlate with Inclusion I2 (traditional power producing resources) based on industry comments on the guidance document The BES SDT is considering a change in Exclusion E1 (radial line exclusion) also based on industry comments requesting clarification of the term “non-retail generation”

BES Definition Phase 2 In future meetings the BES SDT will be considering: Sequence of Exclusions in the definition based on the hierarchical application of the definition The NERC PC recommendations Possible changes to the ERO Statement of Compliance Registry Criteria based on revised BES Definition Additional Guidance Document revisions Response to directives in the FERC Order on Phase 1 Definition

BES Definition Phase 2 Schedule QUESTIONS? First Posting in April Successive Ballot in Q3 2013 Recirculation Ballot in Q3 2013 BOT Approval Q4 2013 QUESTIONS?