Transition from Q1- 8th to Q1- 9th edition

Slides:



Advertisements
Similar presentations
AWARENESS OF ISO 9000 (2000) By C. Das Additional Director
Advertisements

[Organisation’s Title] Environmental Management System
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
ISO 9001:2000 Documentation Requirements
Environmental Management System (EMS)
DOCUMENTATION REQUIREMENTS Based on ISO 9001:2008
Understanding the Requirements Qimpro Standards Organization
ISO 9001: Countdown to 2015 Presented by Ellen Diggs Ellen Diggs Consulting February 11, 2015 It’s Not Just for Manufacturing Anymore!
Draft BY QI organization June 2014
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Quality Management System
TEMPUS ME-TEMPUS-JPHES
ISO 9001 Interpretation : Exclusions
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition November 2008.
ISO 9001:2008: Key changes and transition process
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Medicare Certification Systems Thilak Wickremasinghe, Director/CEO Sri Lanka Accreditation Board.
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Annex 1 – Changes in the detail
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
13th &14th July 2010 Gaelle Rousseau-Lamour
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Quality Management System
ISO STANDARDS TRAINING & CONSULTING
Introduction to ISO New and modified requirements.
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Understanding ISO 22000:2005 TCISys.com.
Introduction to ISO 9001:2000.
ISO 14001:2004, Environmental Management System
Visit us at E mail: Tele:
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
QUALITY MANAGEMENT STATEMENT
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
New ISO Standards Transition Workshop (Auditors)
QUALITY MANAGEMENT SYSTEM
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
10 June 2016 | Proprietary and confidential information. © Mphasis 2013 Overview of ISO 9001:2008 Mar Internal Auditor Training.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Quality Management: Mutually beneficial supplier relationships.
External Provider Control
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Quality Management Systems – Requirements
Transition ISO 9001:2008 to ISO 9001:2015
How to conduct Effective Stage-1 Audit
ISO-9001:2000 Quality Management Systems
Presentation transcript:

Transition from Q1- 8th to Q1- 9th edition

Changes to Q1– 9th Edition Header Changes to Q1– 9th Edition Additional Requirements Section 1: Scope Section 2: Normative References Section 3: Terms, Definitions, and Abbreviations Section 4: Quality Management System Requirements Section 5: Product Realization Section 6: Quality Management System Monitoring, Measurement, Analysis, and Improvement. Annex A: Use of API Monogram by Licensees Annex B: Cross-reference from API Q1, 9th Edition to API Q1, 8th Edition Annex C: Cross-reference from API Q1, 8th Edition to API Q1, 9th Edition API 2013 Summer Session—Q1 9th Edition June 25, 2013 Lafarge | Presentation | Confidential 10/04/2017

Additional Requirements Approximately 93 additional requirements were added Legal is mentioned 19 times vs 1 Documented Procedures 29 vs 13 Shall-- 228 vs 213 Shall: As used in the standard denotes a minimum requirement in order to conform to the specification. API 2013 Summer Session—Q1 9th Edition June 25, 2013

1.0 Scope Allowable Exclusions 5.4 Design and Development Header 1.0 Scope Allowable Exclusions 5.4 Design and Development 5.7.1.2 Servicing 5.7.1.5 Validation of Processes for Production and Servicing 5.7.5 Customer-supplied Property 5.8 Control of Testing, Measuring and Monitoring Equipment 5.7.1.5 The organization shall validate processes for production and servicing where the resulting output cannot be verified by subsequent monitoring or measurement, and as a consequence, deficiencies become apparent only after the product is in use or the servicing has been delivered. Validation shall demonstrate the ability of these processes to achieve planned results. API 2013 Summer Session—Q1 9th Edition June 25, 2013 Lafarge | Presentation | Confidential 10/04/2017

2.0 Normative References ISO 9000, Quality management systems—Fundamentals and vocabulary– Required All others will pertain to business API 2013 Summer Session—Q1 9th Edition June 25, 2013

3.0 Terms, Definitions and Abbreviations Header 3.0 Terms, Definitions and Abbreviations Two sections now 1. Terms and Definitions— 11 new terms and definitions added 2. Abbreviations— 10 abbreviations shall be applied API 2013 Summer Session—Q1 9th Edition June 25, 2013 Lafarge | Presentation | Confidential 10/04/2017

4.0 Quality Management System Requirements 4.1 to 4.3 Changes mainly to these sections are verbiage 4.4 Documentation Requirements 4.42 Procedures: New section “All procedures referenced within this specification shall be established, documented, implemented, and maintained for continued suitability.” 29 Documented Procedures 4.4.4 Use of External Documents in Product Realization “When API product or other external specification requirements, including addenda, errata, and updates, are used in the design or manufacture of the product, the organization shall maintain a documented procedure for the integration of these requirements into the product realization process and any other affected processes.” This there has to be a documented procedure on how you are going to incorporate the changes in product specifications in the product realization. 4.5 Control of Records Control of records has been rewritten. The record requirements have increased dramatically. API 2013 Summer Session—Q1 9th Edition June 25, 2013

5.0 Product Realization 5.1 Contract Review 5.2 Planning Title change from 7.2 in Q1 8th . Information rearranged but same intent 5.2 Planning Section 7.1 in Q1 8th edition has been better identified and some new requirements added. 5.3 Risk Assessment and Management---New Section “The organization shall maintain a documented procedure to identify and control risk associated with impact on delivery and quality of product. The procedure shall identify the techniques, tools and their application for risk identification, assessment, and mitigation.” Suggestion that a matrix for risk management be developed. This section will entail the most work in the new edition of Q1. 5.4 Design and Development. (Excluded in most cement QMS) New verbiage has been added for some new requirements API 2013 Summer Session—Q1 9th Edition June 25, 2013

5.0 Product Realization 5.5 Contingency Planning----New Section 5.5.1 “The organization shall maintain a documented procedure for contingency planning needed to address risk associated with impact on delivery and quality of product. Contingency planning shall be based on assessed risks (see 5.3), and output shall be documented and communicated to the relevant personnel and updated as required.” 5.5.2 Planning Output. 5.6 Purchasing---Significant changes were made 5.6.1 Purchasing Control 5.6.1.1 Procedure Have to determine the criticality Maintain a list of approved suppliers and scope of approval. 5.6.1.2 Initial Supplier Evaluation – Critical Purchases QMS of supplier needs to be evaluated and on-site evaluation API 2013 Summer Session—Q1 9th Edition June 25, 2013

5.0 Product Realization 5.6.1.2 Initial Supplier Evaluation – Critical Purchases a) verification that the supplier’s quality management system conforms to the quality system requirements specified for suppliers by the organization; and b) assessment of the supplier to ensure its capability to meet the organization’s purchasing requirements by: i) performing an on-site evaluation of relevant activities, or ii) performing first article inspection to ensure conformance to stated requirements, or iii) identifying how the supplied product conforms to stated requirements when limited by proprietary, legal, and/or contractual arrangements. 5.6.1.3 Initial Supplier Evaluation -- Noncritical Purchases verification that the supplier’s quality management system conforms to the quality system requirements specified for suppliers by the organization; or assessment of the supplier to meet the organization’s purchasing requirements; or assessment of the product upon delivery or activity upon completion. 5.6.1.4 Supplier Re-evaluation For re-evaluation of all suppliers (critical and noncritical), the requirements of 5.6.1.3 shall apply. 5.6.1.5 Supplier Evaluation– Records 5.6.1.6 Outsourcing API 2013 Summer Session—Q1 9th Edition June 25, 2013

Header 5.0 Product Realization 5.7 Production and Servicing Provision ---Close to 7.5.1 Q1 8th ed slightly modified and broke into two sections 5.7.1 Control of Production and Servicing 5.7.1.1 Production 5.7.1.2 Servicing ---Exclude 5.7.1.3 Process Control Documents 5.7.1.4 Product Realization Capability Documentation-----New 5.7.1.5 Validation of Processes for Production and Servicing—Exclude 5.7.2 Product Quality Plans -- New States what will be required if a quality plan is required by contract. A minimum of these need to be followed. description of the product to be manufactured; required processes and documentation, including required inspections, tests, and records, for conformance with requirements; identification and reference to control of outsourced activities; identification of each procedure, specification, or other document referenced or used in each activity; and identification of the required hold, witness, monitor, and document review points. API 2013 Summer Session—Q1 9th Edition June 25, 2013 Lafarge | Presentation | Confidential 10/04/2017

5.0 Product Realization 5.7 Production and Servicing Provision-- Continued 5.7.3 to 5.7.6 no major changes from 8th 5.7.7 Inspection and Testing 5.7.7.1 General “The organization shall maintain a documented procedure for inspection and testing to verify that product requirements have been met. The procedure shall include requirements for in-process and final inspection and testing. Records of required inspection and testing shall be maintained per documented procedures (see 4.5).” 5.7.7.2 In-process Inspection and Testing “The organization shall inspect and test the product at planned stages as required by the product quality plan (see 5.7.2), process control documents (see 5.7.1.3), and/or documented procedures. Evidence of conformity with the acceptance criteria shall be maintained.” 5.7.7.3 Final Inspection and Testing The organization shall perform all final inspection and testing in accordance with the product quality plan (see 5.7.2) and/or documented procedures to validate and document conformity of the finished product to the specified requirements. Personnel other than those who performed or directly supervised the production of the product shall perform final acceptance inspection at planned stages of the product realization process. API 2013 Summer Session—Q1 9th Edition June 25, 2013

Header 5.0 Product Realization 5.7 Production and Servicing Provision-- Continued 5.7.8 Preventive Maintenance –New The organization shall maintain a documented procedure for the establishment of preventive maintenance for equipment used in product realization. The procedure shall identify requirements for: a) type of equipment to be maintained; b) frequency; and c) responsible personnel. Records of preventive maintenance shall be maintained (see 4.5). 5.8 Control of Testing, Measuring, and Monitoring Equipment—No Changes 5.9 Product Release—New The organization shall maintain a documented procedure to ensure release of product to the customer shall not proceed until the planned arrangements (see 5.7) have been satisfactorily completed, unless otherwise approved by a relevant authority and, where applicable, by the customer. Records shall be maintained to enable identification of the individual releasing the product (see 4.5). 5.7.8 NOTE Preventive maintenance can be based on risk, system reliability, usage history, experience, industry recommended practices, relevant codes and standards, original equipment manufacturer’s guidelines, or other applicable requirements. API 2013 Summer Session—Q1 9th Edition June 25, 2013 Lafarge | Presentation | Confidential 10/04/2017

5.0 Product Realization 5.10 Control of Nonconforming Product No major changes but clarifications have been made in this section. 5.11 Management of Change-- New Section 5.11.1 General The organization shall maintain a process for MOC. The organization shall ensure that the integrity of the quality management system is maintained when changes to the quality management system are planned and implemented. For MOC, the organization shall identify the potential risks (see 5.3) associated with the change and any required approvals prior to the introduction of such changes. The organization shall maintain records of MOC activities (see 4.5). 5.11.2 MOC Implementation The organization shall use the MOC process for any of the following that may negatively impact the quality of the product: a) changes in the organizational structure (see 4.2.2); b) changes in key or essential personnel (see 4.3.2); c) changes in critical suppliers (see 5.6.1.1); and/or d) changes to the management system procedures, including changes resulting from corrective and preventive actions (see 6.4). API 2013 Summer Session—Q1 9th Edition June 25, 2013

5.0 Product Realization 5.11 Management of Change-- New Section—Continued 5.11.3 MOC Notification The organization shall notify relevant personnel, including the customer when required by contract, of the change and residual or new risk due to changes that have either been initiated by the organization or requested by the customer. Example of MOC that could be required: Date Type of Change Description Department/Entities Affected Financial Impact Target Implementation Date Risk: Yes/No Corrective Action Taken Approval Authority API 2013 Summer Session—Q1 9th Edition June 25, 2013

6.0 Quality Management System Monitoring, Measurement, Analysis and Improvement 6.1 General—no changes 6.2 Monitoring, Measurement and Improving 6.2.1 Customer Satisfaction The organization shall maintain a documented procedure to measure customer satisfaction. The procedure shall address the frequency of measurement, obtaining customer feedback, key performance indicators (KPIs), and other information that the organization uses to determine whether the organization has satisfied customers in meeting identified requirements. Records of the results of customer satisfaction information shall be maintained (see 4.5). 6.2.2 Internal Audits Every twelve months not annually as before Audits will be performed by competent personnel independent Status of corrective actions shall be reported in the management review. 6.3 Analysis of Data Has been modified but no major changes API 2013 Summer Session—Q1 9th Edition June 25, 2013

6.0 Quality Management System Monitoring, Measurement, Analysis and Improvement This Section parallels Q1, 8th section 8.5.1, Continual Improvement. Just some clarifications have been made on Corrective and Preventive Actions. 6.5 Management Review Management review needs to be every 12 months not annually. Some additional requirements have been added to the management review Results of risk assessment Analysis of supplier performance. 6.5.2 Output Requirements “The assessment shall include any required changes (see 5.11) to the processes and any decisions and actions, required resources, and improvement to products in meeting customer requirements.” API 2013 Summer Session—Q1 9th Edition June 25, 2013

Annex A, B and C Annex A -- Use of API Monogram by Licensees Revisions have been made through Annex A but no major changes. Annex B – Cross-reference from API Q1, 9th Edition to API Q1, 8th Ed. Annex C – Cross-reference from API Q1, 8th Edition to API Q1, 9th Ed. API 2013 Summer Session—Q1 9th Edition June 25, 2013