“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
The TIMING System … …as used in the PS accelerators.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
SPS Beam Loss System The SPS Beam-Loss System Hardware: Gianfranco Ferioli Software: Lars K. Jensen CERN SL/BI SL/OP Linkman: Antoine Ferrari.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Kicker generator and controls installation in ECA5? Etienne CARLIER
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
V. Kain AB/OP1Chamonix XV What is required to safely fill the LHC? V.Kain AB/OP Input from: B.Goddard, M.Jonker, Y.Kadi, R.Losito, V.Mertens, B.Puccio,
RF acceleration and transverse damper systems
ABT-EC EYETS Activities 2nd reports
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Overview of the Beam Interlock System
R. Denz, A. Gomez Alonso, AT-MEL-PM
PLC-based control systems at SOLEIL - ICALEPCS 2017
Injectors BLM system: PS Ring installation at EYETS
MKD/MKB Review Meeting Scope and Definition
TE-ABT PLC and SCADA usage
J. Uythoven for the MPE-MI & MS Teams
352MHz Klystron Control for the 3MeV Linac test stand
Safe Injection into the LHC V.Kain AB/CO
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Safe Injection into the LHC V.Kain AB/CO
Interlocking of CNGS (and other high intensity beams) at the SPS
TPC Detector Control System
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Beam Interlocks for Detectors and Movable Devices
Interlocking strategy
Hardware Commissioning
Close-out.
Presentation transcript:

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER 05-Dec-2001

Assumptions Major client is operation Commissioning means equipment ready for test with beam Sector test: Q2/2004 Access to restricted underground area UA87 possible up to the end of Q3/2003 SPS extraction and TT40 commissioning up to TED400354: Q2/2003 TI8 commissioning up to TED87765: Q3/2003

Sector Test (+ CNGS) – SL/BT Equipment MKEMSE TED TBSE TBSE TCDI TED TCDIMKITDITCDD T40 SPS extraction kicker SPS extraction septa HCA421/422MKE4 MSE SR8 UA87/SR8MKI8 TDI TCDD LHC injection kicker LHC injection dump LHC injection collimator TED TCDI SPS – LSS4TI8 TT41 LHC – RA87 SPS – LSS4 TI8 TT40 Electronics Location EquipmentHardware Location TT41 beam stopper Neutrino target T40 TBSE T40 TI8 beam dump downstream TI8 collimator TT41 LHC – RA87 T40 beam dump upstreamTEDTT40HCA422 Q1/2003 Q3/2003 ??? Q1/2004 Q1/2004 Q1/2004 Commissioning Q1/2003 Q1/2005

Architecture Master PLC Ethernet Profibus-DP Decentralised I/O Deported I/O Slow control  Elementary cycle independent  State control  Monitoring CompactPCIVME Fast Acquisition  500Ms/s, 200MHz  Analysis (FFT, Fuzzy, DSP) SCADA OP Application SL/CO – SL/OP Fast Control  Elementary cycle dependent  Timing delay  Voltage Equipment Server TED, TBSE, TCDI, TDI, TCDD, MSE, MKE, MKI MKE, MKI

MKE – SPS Extraction Kicker (SL/BT Responsibility) Power trigger Timing [1] Terminating resistor [2] HV power supplies Fast interlock [2] Heater PS [2] Slow interlock [2] Monitoring [2] Thyristor unit Safety switch Extraction interlock Serie production CommissioningDevelopmentInstallation ۷ ۷ Q4/2002 ۷ ۷ ۷۷ Q3/2002 ۷۷ Q4/2002 ۷۷ DO-Q4/2001 ۷ Q3/2002 Q2/2002 ۷ Q4/2002 Q1/2003 DO-Q1/2002Q4/2002Q1/2003 Q3/2002Q4/2002 ۷ Q2/2002 Mains distributor [1]Q1/2002Q3/2002Q4/2002 Q3/2002 Q4/2002 Q1/2003 Q3/2002 [1] : low level software still to be developed [2] : low level software included

MKI – LHC Injection Kicker (SL/BT Responsibility) Power trigger Timing [1] [3] Terminating resistor [2] RCPS (Triumf) [2] Fast interlock [2] Heater PS [2] Slow interlock [2] Monitoring [2] Thyristor unit Safety switch Injection interlock Serie production CommissioningDevelopmentInstallation ۷ Q4/2003 ۷ ۷۷ Q3/2002 ۷۷ Q4/2002 ۷ Q3/2003 ۷ Q3/2002 Q2/2002 Q4/2002 Q3/2003 Q1/2004 DO-Q1/2002Q2/2003Q3/2003 Q3/2002Q4/2002 ۷ Q2/2002 Mains distributor [1]Q1/2002Q2/2001Q4/2002 Q3/2002 Q4/2002 Q1/2003 Q3/2002 ۷۷ Q2/2003 [1] : low level software still to be developed [2] : low level software included [3] : Fast timing based on Highland Technology (or similar) VME board DO-Q3/2002Q2/2003

Electromagnetic Septa (SL/BT Responsibility) Power Supply control [2] Magnet control [2] Cooling control [2] Girder positioning [2] Serie production CommissioningDevelopmentInstallation ۷۷ Q2/2002 ۷۷ ۷ Q1/2003 Q2/2002 Q1/2003 ۷۷ Q3/2002 [1] : low level software still to be developed [2] : low level software included

TED, TBSE, TCDI, TDI & TCDD Positioning: SERVO [2] Positioning: INOUT [2] Monitoring [2] Positioning: STEP [3] [1] Serie production CommissioningDevelopmentInstallation ۷ ۷ ۷ Q4/2002 TED TBSE80243 TED87765 TBSE TCDD Equipment Q3/2002 Q3/2002 Q3/2002 Q3/2002 Q3/2002 Q4/2002 Q4/2002 Q3/2003 Q3/2004 Q4/2003 Q1/2003 Q1/2003 Q3/2003 Q1/2005 Q1/2004 TDIQ3/2003Q4/2003Q1/2004 AllIdem positioning [1] : low level software still to be developed [2] : low level software included [3] : If required precision can not be reached with SERVO positioning system. TCDI???

Hardware dependencies MKE MSE TED Access systemCooling systemVacuumNetworkFast timingVME Front-endMPSMachine protectionSlow timing TBSE TCDI MKI TDI TCDD Beam instrumentationPLC Front-endPXI Front-endMachine energySignal visualizationElectrical distributionCables SpecificStandard

Hardware dependencies MKE Q MSE TED Access systemCooling systemVacuumNetworkFast timingVME Front-endPower SupplyMachine protectionSlow timing TBSE TCDI MKI TDI TCDD Beam instrumentationPLC Front-endPXI Front-endMachine energySignal visualizationElectrical distributionCables Q Q Q Q Q Q ??? Q Q Q ??? Q ??? Q Q Q ??? Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q4 2003

Hardware dependencies Installation Cabling LSS4 – HCA421 Q4/2001 Q1/2002 MSE TDE TBSE Upstream TCDI, TDI, TCDD MKI MKEECA4 – HCA421 Q1/2002 HCA421 Q2/2002 HCA421 - FC Q2/2002 LSS4 – HCA422 Q4/2001 Q1/2002 RA87-SR8 Q3/2002 TT40/TI8 – HCA422 Q4/2001 Q1/2002 TDE Downstream RA87-SR8 Q3/2002 RA87-UA87 Q3/2002 UA87 Q3/2002 UA87-SR8 Q3/2002 Request Installation

Hardware dependencies Electrical distribution ECA4 Q4/2001 Q3/2002 MSE TDE TBSE Upstream TCDI, TDI, TCDD MKI MKE LSS4 Q4/2001 Q1/2002 SR8 Q3/2002 TT40/TI8 Q4/2001 Q1/2002 TDE Downstream SR8 Q3/2002 UA87 pre. Q3/2001 Q1/2002 SR8 Q3/2002 Request Installation HCA421 Q4/2001 HCA422 Q4/2001

Software Dependencies Assumptions Q4/2001 : MSE’s in LSS2 & LSS6, TED & TBSE in TT60 & TT20 included into SPS2001 framework Q3/2002 : all the different types of SL/BT equipment included into and operated from SPS2001 framework (Kicker, Electro-magnetic septa and beam obstacles TED & TBSE) Q1/2003 : copy of the different device servers for equipment in the LSS4 extraction channel SL/BT will provide software up to the equipment server layer in accordance with SL/CO predefined equipment access contracts (server API)

Software dependencies Equipment access contracts (server API) Alarm Software Software interlock Q1/2002 Q4/2003 [Q2/2003] Commissioning Settings management Analogue signals acquisition and visualisation Operational Equipment VME front-end [MKI] State Settings & measurements Q4/2002 HW drivers: timing delay module [1] HW drivers: analogue out [2] HW drivers: analogue in [2] Device data Error handling ۷ ۷ ۷ [1] : Highland technology V850 [2] : tbs. SL/CO – SL/PO recommendation Q1/2002

Software dependencies SoftwareCommissioning Q1/2003 [Q1/2004] Post-mortem MKE [MKI] Q1/2003 [Q1/2004] Logging / Archiving Synchronisation mechanism, contract definition, inter-connection with machine protection Operational level: data definition, time stamping mechanism, contract definition, off-line analysis tools

Analogue signals acquisition and visualization Remote visualization of signals (nAos) –Synchronization Signals recording –Equipment post-mortem Continuous signals analysis –Equipment stability, pulsed regulation loop Remote scope –Signals acquired in the UA (no access during operation), selection, configuration, analysis & visualization in the SR –Cabling cost reduction

Critical items Cabling specification (All the technical choices have not yet been made at the equipment level but also at the LHC control architecture level) Analogue signal acquisition, analysis, display… SPS interlock and machine protection (for LSS4 extraction but also for beam dumping system) Integration of equipment into the control architecture (Equipment server contract specifications,…) LHC Beam Energy Measurement System (BEM)