LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Sources of predictability and error in ECMWF long range forecasts Tim Stockdale European Centre.

Slides:



Advertisements
Similar presentations
THOR Annual Meeting - Bergen 9-11 November /25 On the impact of initial conditions relative to external forcing on the skill of decadal predictions:
Advertisements

Page 1© Crown copyright 2004 Seasonal forecasting activities at the Met Office Long-range Forecasting Group, Hadley Centre Presenter: Richard Graham ECMWF.
User Meeting 15 June 2005 Monthly Forecasting Frederic Vitart ECMWF, Reading, UK.
Sub-seasonal to seasonal prediction David Anderson.
The role of the stratosphere in extended- range forecasting Thomas Jung Alfred Wegener Institute Helmholtz Centre for Polar and Marine Research Germany.
Climate Prediction Division Japan Meteorological Agency Developments for Climate Services at Japan Meteorological Agency 1.
Role of Air-Sea Interaction on the Predictability of Tropical Intraseasonal Oscillation (TISO) Xiouhua Fu International Pacific Research Center (IPRC)
ECMWF long range forecast systems
WCRP OSC 2011: Strategies for improving seasonal prediction © ECMWF Strategies for improving seasonal prediction Tim Stockdale, Franco Molteni, Magdalena.
Willem A. Landman Ruth Park Stephanie Landman Francois Engelbrecht.
Resolution and Athena – some introductory comments Tim Palmer ECMWF and Oxford.
1 Seasonal Forecasts and Predictability Masato Sugi Climate Prediction Division/JMA.
© Crown copyright Met Office Regional/local climate projections: present ability and future plans Research funded by Richard Jones: WCRP workshop on regional.
Review of Northern Winter 2010/11
ENSEMBLES RT4/RT5 Joint Meeting Paris, February 2005 Overview of Seasonal-to-Decadal (s2d) Activities during the Initial 18 Months Francisco J. Doblas.
28 August 2006Steinhausen meeting Hamburg On the integration of weather and climate prediction Lennart Bengtsson.
© Crown copyright Met Office Andrew Colman presentation to EuroBrisa Workshop July Met Office combined statistical and dynamical forecasts for.
Exeter 1-3 December 2010 Monthly Forecasting with Ensembles Frédéric Vitart European Centre for Medium-Range Weather Forecasts.
1 Assessment of the CFSv2 real-time seasonal forecasts for Wanqiu Wang, Mingyue Chen, and Arun Kumar CPC/NCEP/NOAA.
Performance of the MOGREPS Regional Ensemble
© Crown copyright /0653 Met Office and the Met Office logo are registered trademarks Met Office Hadley Centre, FitzRoy Road, Exeter, Devon, EX1.
India summer monsoon rainfall in ECMWF Sys3 – ICTP, August Indian summer monsoon rainfall in the ECMWF seasonal fc. System-3: predictability and.
Recent developments in seasonal forecasting at French NMS Michel Déqué Météo-France, Toulouse.
DEMETER Taiwan, October 2003 Development of a European Multi-Model Ensemble System for Seasonal to Interannual Prediction   DEMETER Noel Keenlyside,
ECMWF Forecasts Laura Ferranti, Frederic Vitart and Fernando Prates.
GOVST III, Paris Nov 2011 ECMWF ECMWF Activities on Coupled Forecasting Systems Status Ongoing research Needs for MJO Bulk formula in ocean models Plans.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology Oscar Alves CAWCR (Centre for Australian.
EUROBRISA Workshop – Beyond seasonal forecastingBarcelona, 14 December 2010 INSTITUT CATALÀ DE CIÈNCIES DEL CLIMA Beyond seasonal forecasting F. J. Doblas-Reyes,
ECMWF training course, 2006: Predictability on the seasonal timescale Predictability on the Seasonal Timescale Tim Stockdale and Franco Molteni Seasonal.
Workshop on Sub-seasonal to Seasonal Prediction, Exeter, 1-3 December Operational Seasonal Forecast Systems: a view from ECMWF Tim Stockdale The.
EUROBRISA WORKSHOP, Paraty March 2008, ECMWF System 3 1 The ECMWF Seasonal Forecast System-3 Magdalena A. Balmaseda Franco Molteni,Tim Stockdale.
Operational sub-regional Long-Range Forecasting Unit at RA VI Regional Climate Center – South-East European Virtual Climate Change Center Vladimir Djurdjevic.
1.Introduction Prediction of sea-ice is not only important for shipping but also for weather as it can have a significant climatic impact. Sea-ice predictions.
Franco Molteni, Frederic Vitart, Tim Stockdale,
Course Evaluation Closes June 8th.
MINERVA workshop, GMU, Sep MINERVA and the ECMWF coupled ensemble systems Franco Molteni, Frederic Vitart European Centre for Medium-Range.
3. Products of the EPS for three-month outlook 1) Outline of the EPS 2) Examples of products 3) Performance of the system.
Stratosphere-Troposhere Coupling in Dynamical Seasonal Predictions Bo Christiansen Danish Meteorological Institute.
Modes of variability and teleconnections: Part II Hai Lin Meteorological Research Division, Environment Canada Advanced School and Workshop on S2S ICTP,
ECMWF Training course 26/4/2006 DRD meeting, 2 July 2004 Frederic Vitart 1 Predictability on the Monthly Timescale Frederic Vitart ECMWF, Reading, UK.
Verification of operational seasonal forecasts at RA-VI Regional Climate Center South East European Virtual Climate Change Centre Goran Pejanović Marija.
© Crown copyright 2007 Forecasting weeks to months ahead Dr. Alberto Arribas Monthly-to-Decadal area, Met Office Hadley Centre Exeter, April 2014.
Figures from “The ECMWF Ensemble Prediction System”
Franco Molteni, Tim Stockdale, Frederic Vitart, Laura Ferranti
Jim Kinter David Straus, Erik Swenson, Richard Cirone
Lothar (T+42 hours) Figure 4.
JMA Seasonal Prediction of South Asian Climate for OND 2017
Challenges of Seasonal Forecasting: El Niño, La Niña, and La Nada
Teleconnections in MINERVA experiments
Course Evaluation Now online You should have gotten an with link.
Met Office GPC Adam Scaife Head of Monthly to Decadal Prediction Met Office © Crown copyright Met Office.
Course Evaluation Now online You should have gotten an with link.
Climate prediction activities at Météo-France
Eun-Pa Lim and Harry H. Hendon Science to Services
Sub-seasonal prediction at ECMWF
DEMETER Development of a European Multi-model Ensemble System for
Seasonal Prediction Activities at the South African Weather Service
Prospects for Wintertime European Seasonal Prediction
WGCM/WGSIP decadal prediction proposal
Caio Coelho (Joint CBS/CCl IPET-OPSLS Co-chair) CPTEC/INPE, Brazil
Predictability of the NAO? Adam Scaife
Predictability assessment of climate predictions within the context
ECMWF activities: Seasonal and sub-seasonal time scales
Deterministic (HRES) and ensemble (ENS) verification scores
T. Ose, T. Yasuda (MRI/JMA), Y. Takaya, S. Maeda, C. Kobayashi
Decadal prediction in the Pacific
GloSea4: the Met Office Seasonal Forecasting System
MOGREPS developments and TIGGE
Operational Seasonal Forecast Systems:
Sub-seasonal and Seasonal prediction at ECMWF
Presentation transcript:

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Sources of predictability and error in ECMWF long range forecasts Tim Stockdale European Centre for Medium-Range Weather Forecasts

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Outline Overview of System 4 Some recent research results

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Seasonal prediction at ECMWF Started in the 1990’s Strategy: fully coupled global GCMs Real-time forecasts since early 1997  Forecasts issued publicly from December 1997 Now using “System 4”  Lifetime of systems has been about 5 years each S1S2S4S3 Dec 1997 Mar 2002 Nov 2011 Mar 2007

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF System 4 seasonal forecast model IFS (atmosphere)  T L 255L91 Cy36r4, 0.7 deg grid for physics (operational in Dec 2010)  Full stratosphere, enhanced stratospheric physics  Singular vectors from EPS system to perturb atmosphere initial conditions  Ocean currents coupled to atmosphere boundary layer calculations NEMO (ocean)  Global ocean model, 1x1 resolution, 0.3 meridional near equator  NEMOVAR (3D-Var) analyses, newly developed. Coupling  Fully coupled, no flux adjustments  Sea-ice based on sampling previous five years

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Reduced mean state errors S4 S3 T850U50

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Tropospheric scores Spatially averaged grid-point temporal ACC One month leadFour month lead

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Capturing trends is important. Time-varying CO2 and other factors are important in this. There is a strong link between seasonal prediction and decadal/ multi-decadal climate prediction.

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF More recent ENSO forecasts are better

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF System 4 configuration Real time forecasts:  51 member ensemble forecast to 7 months  SST and atmos. perturbations added to each member  15 member ensemble forecast to 13 months  Designed to give an ‘outlook’ for ENSO  Only once per quarter (Feb, May, Aug and Nov starts) Back integrations from (30 years)  15 member ensemble every month  15 members extended to 13 months once per quarter

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF How many back integrations? Back integrations dominate total cost of system  System 4:5400 back integrations (must be in first year)  612 real-time integrations (per year) Back integrations define model climate  Need both climate mean and the pdf, latter needs large sample  May prefer to use a “recent” period (30 years? Or less??)  System 2 had a 75 member “climate”, S3 had 275, S4 has 450.  Sampling is basically OK Back integrations provide information on skill  A forecast cannot be used unless we know (or assume) its level of skill  Observations have only 1 member, so large ensembles are less helpful than large numbers of cases.  Care needed e.g. to estimate skill of 51 member ensemble based on past performance of 15 member ensemble  For regions of high signal/noise, System 4 gives adequate skill estimates  For regions of low signal/noise (eg <= 0.5), need hundreds of years

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF QBO 50hPa 30hPa System 3 System 4

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Problematic ozone analyses

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Stratospheric temperature trend problem. This is due to an erroneous trend in initial conditions of stratospheric water vapour. Stratospheric trends

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Land surface Snow depth limits, 1 st April

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Sea ice

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Tropical storm forecasts

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Model errors are still serious … Models have errors other than mean bias  Eg weak wind and SST variability in System 2  Past models underestimated MJO activity (S4 better)  Suspected too-weak teleconnections to mid-latitudes Mean state errors interact with model variability  Nino 4 region is very sensitive (cold tongue/warm pool boundary)  Atlantic variability suppressed if mean state is badly wrong Forecast errors are often larger than they should be  With respect to internal variability estimates and (occasionally) other prediction systems  Reliability of probabilistic forecasts is often not particularly high (S4 better)

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Recent Research

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF S4 extended hindcast set 15 members DJF Europe T2m>upper tercile Re-forecasts from 1 Nov, Reliability score: ROC skill score: members DJF Europe T2m>upper tercile Re-forecasts from 1 Nov, Reliability score: ROC skill score: 0.22 (Figures from Susanna Corti)

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF S4 extended hindcast set 15 members JJA Europe T2m>upper tercile Re-forecasts from 1 May, Reliability score: ROC skill score: members JJA Europe T2m>upper tercile Re-forecasts from 1 May, Reliability score: ROC skill score: 0.43 (Figures from Susanna Corti)

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF S4 ACC DJF Z500 S4 ACC perfect model limit

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Local p-value for perfect model Indistinguishable from perfect Worse than perfect Better than perfect

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Fig. 1. The Arctic Oscillation Index for DJF, as analysed from ERAI (blue) and as predicted by the S4 ensemble mean from the 1st November (red). The S4 ensemble mean is scaled by a factor of 6 to be of comparable amplitude to the observed index. ACC=0.61

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF QBO Period and downward penetration match observations Semi-annual oscillation still poorly represented A big reduction in vertical diffusion, and a further tuning of non-orographic GWD, has given a big additional improvement in the QBO compared to S4.

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF QBO forecasts S3 S4 New

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF NH winter forecasts: vertical diffusion

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF NH winter forecasts Even with 101 members, ensemble mean signal not always well defined

LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Conclusions Models are improving  Gradual but continuous improvement in scores  Reliability can be high in many situations Forecast systems still have deficiencies  Need calibration, and often cannot be trusted at face value  Some issues may affect real-time forecasts more than re-forecasts Further improvements lie ahead  Research results suggesting that previous estimates of predictability limits might be wrong.  Hard work needed to improve models and capture new sources of predictability.