2014 Workshop and Plenary Nathaniel Packard IIBA – International Institute of Business Analysis Brenda Byers, I.S.P., ITCP, PMP, TOGAF9 CIPS – Canada’s.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
Internal Control–Integrated Framework
Business Architecture
Dr Jim Briggs Masterliness Not got an MSc myself; BA DPhil; been teaching masters students for 18 years.
CISB444 - Strategic Information Systems Planning
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
Certified Business Process Professional (CBPP®)
Purpose of the Standards
How can projects be controlled?
2014 Workshop and Plenary Sandra Hoskins, I.S.P, ITCP, PMP, MBA CIPS – Canada’s IT Professional Organization IIBA – International Institute of Business.
Enterprise Architecture
Welcome ISO9001:2000 Foundation Workshop.
Internal Auditing and Outsourcing
Project Human Resource Management
What is Business Analysis Planning & Monitoring?
Chapter : Software Process
Decision Making Dr Vasuprada Kartic NAC Batch IX PGDCPM.
Copyright Course Technology 1999
Developing an IS/IT Strategy
Depth of Knowledge A HEAP of Complexity. BLOOM’S TAXONOMYBLOOM’S REVISED TAXONOMY KNOWLEDGE “The recall of specifics and universals, involving little.
Professional Certificate – Managing Public Accounts Committees Ian “Ren” Rennie.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Business Analysis and Essential Competencies
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Unit 1 – Preparation for Assessment LO 1.1&1.2&1.3.
The Revised Bloom’s Taxonomy (RBT): Improving Curriculum, Instruction, and Assessment in an Accountability-Driven, Standards-Based World Developed and.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
A COMPETENCY APPROACH TO HUMAN RESOURCE MANAGEMENT
Inspire Personal Skills Interpersonal & Organisational Awareness Developing People Deliver Creative Thinking & Problem Solving Decision Making, Prioritising,
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
Ferris Bueller: Voodoo Economics Voodoo_Economics_Anyone_Anyone. mp4Voodoo_Economics_Anyone_Anyone. mp4.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Dillon School District Two Revised Bloom’s Taxonomy.
2014 Workshop and Plenary Nick Malik CAEAP – Center for the Advancement of the EA Profession.
Using questions to achieve Higher Order Thinking
Bloom’s Taxonomy vs. Bloom’s Revised Taxonomy. Bloom’s Taxonomy 1956 Benjamin Bloom, pyschologist Classified the functions of thought or coming to know.
The New Bloom Folwell Dunbar, Knowledge Comprehension Application Analysis Synthesis Evaluation BLOOM 1956.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Revised Bloom’s Taxonomy
Job Analysis - Competency Modeling MANA 5322 Dr. Jeanne Michalski
Queen’s Management & Leadership Framework
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Introduction to Project Management.  Explain what a project is?  Describe project management.  Understand project management framework.  Discuss the.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
2014 Workshop and Plenary Brenda Byers, I.S.P., ITCP, PMP, TOGAF9 CIPS – Canada’s IT Professional Organization.
12-CRS-0106 REVISED 8 FEB 2013 APO (Align, Plan and Organise)
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 Click to edit Master title style What is Business Analysis Body of Knowledge?
The Instructional Design Process
Generic competencesDescription of the Competence Learning Competence The student  possesses the capability to evaluate and develop one’s own competences.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
Bloom’s Revised Taxonomy Creating Higher Level Discussions.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Collaborative & Interpersonal Leadership
Start End What is a project? Definition from PMBOK -
Project Human Resource Management
Requirements Analysis Scenes
Identify the Risk of Not Doing BA
Chapter 10: Bloom’s Taxonomy
Asset Governance – Integrated Strategic Asset Management
Portfolio, Programme and Project
CEng progression through the IOM3
Presentation transcript:

2014 Workshop and Plenary Nathaniel Packard IIBA – International Institute of Business Analysis Brenda Byers, I.S.P., ITCP, PMP, TOGAF9 CIPS – Canada’s IT Professional Organization

2014 Workshop and Plenary Review the process to date Review the format of the competencies definitions Review the documented competencies so far Determine next steps Presented for background and understanding of terms Approve the current format Approve the competencies so far Validate direction Goal: To validate the competencies proposed so far from the June summit

2014 Workshop and Plenary Competency Workshop Objectives Define competency categories Determine the knowledge, skills, abilities (ie. Competencies) required in each category Assign each competency a mastery-level. The mastery-level is commensurate with a Role. For example, Influence - a User Interface Designer would have a mastery-level of 1, while the Chief Architect would be assigned a Level 4. This will lead to: Position/ role descriptions grouping the Position Family Competencies - Common to whole family grouping a set of Leadership competencies Completing a Competency Dictionary and map A clear, consistent, understandable and transparent progression path How to enter, and exit, and navigate and progress the career path

FEAPO 2014 Workshop and Plenary EA Position Families Enterprise Arch. Solution Arch. Design & Analyst Arch. EA Position Roles/ Paths SecurityInfrastructureTechnical… Competencies (categorize and list) Management/ Leadership Foundational / Core Technical Levels of Proficiency (4 to 6) UnderstandingApplying Analyzing/ Evaluating Creating

2014 Workshop and Plenary Included IEEE, Business Architecture Guild, IIBA, BCS, SFIA, Software Assurance Competency Model Competency categorization Really just for structure and organization Competency specification: “-” I “= “ Similar to BTM document ex. SFIA-PRMG=3 Proficiency level use Bloom or come up with our own or even map to something like SFIA

2014 Workshop and Plenary 1. Remembering: Retrieving, recognizing, and recalling relevant knowledge from long-term memory. 2. Understanding: Constructing meaning from oral, written, and graphic messages through interpreting, exemplifying, classifying, summarizing, inferring, comparing, and explaining. 3. Applying: Carrying out or using a procedure through executing, or implementing. 4. Analyzing: Breaking material into constituent parts, determining how the parts relate to one another and to an overall structure or purpose through differentiating, organizing, and attributing. 5. Evaluating: Making judgments based on criteria and standards through checking and critiquing. 6. Creating: Putting elements together to form a coherent or functional whole; reorganizing elements into a new pattern or structure through generating, planning, or producing.

Source:

FEAPO 2014 Workshop and Plenary RefCompetencyStandard AT-1 Systems thinking – The ability to understand how processes within a system influence each other within the whole. BLOOM=2 AT2 Creative thinking - The successful generation and productive consideration of new ideas or the application of new ideas to resolve existing problem (IIBA) IIBA=B3 AT-3 Problem solving – The resolution (both reactive and proactive) of problems throughout the information system lifecycle, including classification, prioritisation and initiation of action, documentation of root causes and implementation of remedies to prevent future incidents. (SFIA-PBMG: problem management) SFIA-PBMG=B3 AT-4 Strategic thinking - The capability to recognise and exploit business opportunities provided by IT, (for example, the Internet), to ensure more efficient and effective performance of organisations, to explore possibilities for new ways of conducting business and organisational (SFIA-INOV: innovation) SFIA-INOV=B4 AT-5 …

FEAPO 2014 Workshop and Plenary RefCompetencyStandard AR-1 Modeling - Appropriately uses models to represent a simplified view of a complex reality and Ensures that information captured in different models is consistent and accurate (IIBA) The production of abstract or distilled representations of situations to aid the communication and understanding of existing, conceptual or proposed scenarios. Predominantly focused around the representation of processes, roles, data, organisation and time. Models may be used to represent a subject at varying levels of detail and decomposition. (SFIA) IIBA/SFIA=B4 AR-2 Design - the creation of a plan or convention for the construction of an object or a system that satisfies stated business objectives BLOOM=4 AR-3Process - The identification of new and alternative approaches to performing business activities. The analysis of business processes, including recognition of the potential for automation of the processes, assessment of the costs and potential benefits of the new approaches considered and, where appropriate, management of change, and assistance with implementation. May include the implementation of a process management capability/discipline at the enterprise level. (SFIA) (BPRE: Skill Business Process Improvement) SFIA-BPRE=B3

FEAPO 2014 Workshop and Plenary RefCompetencyStandard CO-1 Oral - Can communicate effectively in a variety of situations to ensure understanding (IIBA) (2.4.1) IIBA=B3 CO-2 Written - Can communicate effectively in a variety of situations to ensure understanding (IIBA)(2.4.3) IIBA=B3 FI – Finance RefCompetency Standard FI-1 Cost benefit analysis - Prioritizes effectively based on factors including business value, cost to deliver and time constraints (IIBA) (1.5.1) IIBA=B3 FI-2Budgeting BLOOM=5

FEAPO 2014 Workshop and Plenary RefCompetencyStandard IS-1 Influence – engendering ‘buy-in’ for new ideas, and reducing resistance to necessary changes (IIBA) (2.5.2) IIBA=B3 IS-2 Negotiation - Encouraging stakeholders to reach win/win outcomes on a regular basis; Understanding of political implications in conflicts and negotiates in a politically sensitive manner (IIBA) (2.5.1) IIBA=B3 IS-3 Conflict resolution - Ensuring that participants in a discussion correctly understand one another’s positions; Encouraging stakeholders to reach win/win outcomes on a regular basis; Understanding of political implications in conflicts and negotiates in a politically sensitive manner (IIBA) (2.5.1) Effective resolution of conflict; Developing trust among team members (IIBA) (2.5.3) IIBA=B2 IS-4Political savvy - The preparation of a sustainability strategy taking into account any established corporate strategy, Evaluation and inclusion, as appropriate, of political, legislative, economic, social and technological factors. Identification of major external standards, practices or schemes to be adopted. Consultation with identified relevant parties, either internal or external. Obtaining agreement to the strategy and the commitment to act upon it. (SFIA) (as SUST: Sustainability Strategy) also (IIBA) (1.4.4) SFIA-SUST=B3

FEAPO 2014 Workshop and Plenary RefCompetencyStandard LE-1 Project Management – Demonstrate the ability to effectively plan, manage and lead a business technology project (SFIA) (as PRMG: Project Management) SFIA-PRMG=4 / B3 LE-2 Portfolio Management - The development and application of a systematic management framework to define and deliver a portfolio of programmes, projects and ongoing services. Includes the implementation of a strategic investment appraisal and decision making process based on a clear understanding of cost, risk, inter-dependencies, and impact on existing business activities, enabling measurement and objective evaluation of potential changes and the benefits to be realised. The prioritisation of resource utilisation and changes to be implemented. (SFIA) (as POMG: Portfolio Management) SFIA-POMG=B3 LE-3Effectiveness – Competency models describe the knowledge, skills, abilities and other personal characteristics required for a person to be successful in a job and to perform that job effectively. A competent person is one who is capable of performing a role effectively and in a fashion that meets the reasonable standards and expectations of those he or she interacts with. (IIBA)(Page 7) Not a separate competency

FEAPO 2014 Workshop and Plenary RefCompetencyStandard MA-1 Decision making – Confidence of the participants in the decision-analysis process that a decision is correct; Decisions are effective in addressing the underlying problem; The impact of uncertainty and new information when making decisions can be effectively assessed (IIBA) (2.1.1) IIBA=B3 MA-2 Strategic Planning – The management of the infrastructure and resources required to plan for, develop, deliver and support services and products to meet the needs of a business. The preparation for new or changed services, management of the change process and the maintenance of regulatory, legal and professional standards. The management of performance of systems and services in terms of their contribution to business performance and their financial costs and sustainability. The management of bought-in services. The development of continual service improvement plans to ensure the infrastructure adequately supports business needs. (SFIA) (as ITMG: IT Management) Understands overall business structure, strategy and impact on work efforts (IIBA) (1.4.3) SFIA- ITMG=5/B4 MA-3 Coaching and Mentoring – Verifying that learners have acquired information that has been imparted to them; Ability of learners to use new skills or demonstrate new knowledge (IIBA) (2.4.2) IIBA=B2 MA-4 Policy /governance – The establishment and oversight of an organisation's approach to the use of Information and IT, including acceptance of responsibilities in respect of both supply of, and demand for IT; strategic plans for IT, which satisfy the needs of the organization’s business strategy; transparent decision making, leading to valid reasons for IT acquisitions with appropriate balance between benefits, opportunities, costs, and risks; provision of IT services, levels of service and service quality which meet current and future business requirements; policies and practices for conformance with mandatory legislation and regulations, which demonstrate respect for the current and evolving needs of all stakeholders. (SFIA) (as GOVN: IT Governance) SFIA-GOVN=5 / B4

FEAPO 2014 Workshop and Plenary RefCompetencyStandard TE-1 Software applications – Be able to explain software development methodologies, lifecycle and techniques. BLOOM=2 TE-2 System integration - The incremental and logical integration and testing of components and/or subsystems and their interfaces in order to create operational services. (SFIA) SFIA-SINT=5/B3 TE-3 Software quality assurance – “ensuring that the agreed quality standards within an organization are adhered to and that best practice is [disseminated] throughout the organization” (SFIA)(as QUAS: Quality assurance) SFIA-QUAS=3/B2 TE-4

2014 Workshop and Plenary Expand on competencies in each category Ensure no gaps exist in competency areas Map categories to career families to validate consistency Ensure competencies cover all job descriptions (roles)