4/12/2015Spring 2009 F’ton Base RC Report 1 Rear Commodores’ Report Mary-Ellen Zwicker & Mike MacDonald.

Slides:



Advertisements
Similar presentations
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Design Specifications stairs The ArcelorMittal Asset Risk Management.
Advertisements

DENSITY.
F&T Inc. OVERHEAD CRANE SAFETY.
ISO 9001:2008 Co. Manufacturers & Exporters of Hydraulic Tank Jacking Equipments, Power Packs & Vacuum Boxes.
OR, WHY DO SOME THINGS FLOAT WHILE OTHERS SINK.
BEDRE GJENNOM KUNNSKAPSDELING SHARING TO BE BETTER CAKE Q2 LIFTING INCIDENT.
Geometry Unit Project 6th grade.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Max/min Finding Roots. You should know the following about quadratic functions: How to graph them How to find the vertex How to find the x- and y- intercepts.
A-REI Solve equations and inequalities in one variable. 1. Solve quadratic equations in one variable.
Brake System Diagnosis and Repair
Summit’s “TOOLBOX SAFETY TALK”
Road Committee Report 31 May Road Committee Report Outline Community Day Accomplishments General Comments on Road Conditions Activities Planned.
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
SHIP NOMENCLATURE. DO NOW  In the United States, we commonly use the English system of measuring length & distance (feet, inches, miles…).  In most.
MSC 132 Fishing Gear Technology I With Excerpts from: Fisherman’s Workbook compiled by J. Prado, Fishing News Books, Oxford:1990 Yale Cordage Ropes For.
Integrated Natural Science. for Detroit Public Schools Ropes and Pulleys Kat Woodring.
Final Presentation Crew: Mike Lanteigne Wallace Barkhouse Scott Donahoe Blair MacKay Captain: Dr. Jimmy Chuang April 4 th 2012.
The In's and Out's of Locking Through a Dam By RiverBill.
 Complete review questions 1-13  Take out everything you have done so far for your Budget Project and have it on your desk. › I’m coming around to check.
What’s a “Basin”? A depression that holds water A bird bath What holds the water of Lake Michigan What contains the water of an ephemeral pond Does it.
4.8 Solving Problems with Trigonometry. What you’ll learn about More Right Triangle Problems Simple Harmonic Motion … and why These problems illustrate.
Physics 6A Work and Energy examples Prepared by Vince Zaccone For Campus Learning Assistance Services at UCSB.
Module 7 – Power Systems: Tethers
Foundations of Physical Science Workshop: Ropes & Pulleys - Work.
Problems Chapter 4,5.
Perimeter & Area 5.1. Define perimeter and area. Find the perimeter of a figure. Use two methods to find the area of compound figures. Apply the area.
Petroleum Engineering 406 Lesson 9b Station Keeping.
Indirect Measurement Lab Presentation Galileo Gansters Period ¾.
Vectors and Projectile Motion Chapter 3. Adding Vectors When adding vectors that fall on the same line, using pluses and minuses is sufficient. When dealing.
4.7 Optimization Problems In this section, we will learn: How to solve problems involving maximization and minimization of factors. APPLICATIONS OF DIFFERENTIATION.
LESSON 4: PAINTING A ROOM Consumer Math p
Tides Chapter 1: Earth, Moon, & Sun Figure 9 Predicting: What would happen if these people stayed on the beach too long? They could get trapped on the.
EMAN Land Use & Zoning Meeting: 6/13/11 1 Sedgwick Station Neighborhood Beautification We Need EMAN & Devon Village Help Our Goal: Beautify Sedgwick Station.
Multi-Year Plan Status Report to Membership Fredericton Yacht Club Fall Meeting 2008.
THE COST OF MANUFACTURING How much does manufacturing cost?
Vectors and Projectile Motion Chapter 3. Adding Vectors When adding vectors that fall on the same line, using pluses and minuses is sufficient. When dealing.
Heavy Weather And Boat Handling Seattle Safety at Sea Seminar 25 Feb 2012 Paul H. Miller, D.Eng. P.E. Professor of Naval Architecture United States Naval.
Chapter 5 Work, Power and Energy Work, Power and Energy.
Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special.
Modeling Real World Phenomena with Sinusoids. Sinusoidal Models Objective Given a verbal description of a periodic phenomenon, write an equation using.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Brittany Moore 8/29/12. motion: movement What two things are important in describing motion: Distance Time Do you have to see something literally move.
How To Make A Haunted Hayride Created: March 7 th, 2010 By: Taylor Cooper.
Warm Up Apr. 22nd Graph two full periods.
EXAMPLE 1 Subtracting Integers –56 – (–9) = – = –47 –14 – 21 = –14 + (–21) = –35 Add the opposite of –9. Add. Add the opposite of 21. Add. a. –56.
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
Surface Area and Volume Mrs. Hubbard Room 152. Volume  Volume is the amount of space inside an object.  Volume is measured in cubic units, since there.
HOW is the subtraction of integers related to the addition of integers? The Number System Course 2, Inquiry Lab before Lesson 3-3.
T5.8 Max/min Finding Roots Topic 5 Modeling with Linear and Quadratic Functions 5.8.
CUTTER SUCTION DREDGES. Cutter Suction Configuration Cutter Suction Configuration ` Water Level Chart Datum Channel Design Depth Channel Design Overdepth.
SPRING GENERAL MEETING MARCH 28, AGENDA 1.INTRODUCTORY REMARKS 1.WELCOME DEBBIE SHORTEN AS VC 2.APPROVAL OF THE AGENDA 3.APPROVAL OF FALL MINUTES.
Measurement GLE # 18 The arrow points to a measurement of
Quadratic Word Problems
SBN Far Detector Installation & Integration
Cardboard Boat Design • Consider its Size - building & transporting
Sam Sensenig Jess Rudick Eleanor Hatch
SERVICES, LLC 1 1.
Gasunie is one of the biggest gas infrastructure companies in Europe
Conservation of Energy
Rear Commodores’ Report
F&T Inc. OVERHEAD CRANE SAFETY.
Filling Your Classroom w/ Tennis Balls Not Enough Numbers
Suryoday Technologies ISO 9001:2015 Co.
Ladner Harbour.
Finding a Trigonometric Model
Robotics Lifting Things
Replacing TrueAir Thermostat with Ecobee SI
Rear Commodore's Report
Presentation transcript:

4/12/2015Spring 2009 F’ton Base RC Report 1 Rear Commodores’ Report Mary-Ellen Zwicker & Mike MacDonald

4/12/2015Spring 2009 F’ton Base RC Report 2 Rear Commodores Report The RC Committees Planning mooring field Budgeting organizing

4/12/2015Spring 2009 F’ton Base RC Report 3 The RC Committees The organization of the committees Chair with members as needed(Task oriented) Committees will be better defined in long term. Be small and do something small Develop budget, do the task, retain knowledge Chairs handle regular things Special Project chairs handle “add ons” The RCs and chairs will adapt committees to make the committees work.

4/12/2015Spring 2009 F’ton Base RC Report 4 The RC Committees Developed a list of “must, should, and would like to” do (over $50,000) We have to control budgets and restrain spending We have limited budget but want to do something in most of the committees given we don’t know the state of the lease.

4/12/2015Spring 2009 F’ton Base RC Report 5 Priorities Spend as little as possible on things we can’t move. Risk Management. Organizing the budget.

4/12/2015Spring 2009 F’ton Base RC Report 6 Projects on Land Repair fencing Replace the water system Two zone control, two hours at a time. Electrical inspection (required by Insurance Co.)

4/12/2015Spring 2009 F’ton Base RC Report 7 Projects afloat Floating docks Repaired and floated again Adding rubber mats between docks Pontoon boat Winter cover (done) Depth sounder (done) Welding a safety cage for driver.

4/12/2015Spring 2009 F’ton Base RC Report 8 Projects that sink Mooring field inspections and maintenance Full mooring field Replacing 6-8 mooring chains with nylon Not adding any new moorings this year.

4/12/2015Spring 2009 F’ton Base RC Report 9 Mast Crane Cannot afford to have it inspected and “rated” Motion: The Mast Crane should be installed for members usage at their own risk in its present condition.

4/12/2015Spring 2009 F’ton Base RC Report 10 Planning of Mooring field

4/12/2015Spring 2009 F’ton Base RC Report 11 Current Situation of Field Stats (Oct 18/ ft above Datum) Depths StringAverage MaxMin A B C D E F Upper field Lower field Height of Wharf 9 ft above this. (4.5M above datum)

4/12/2015Spring 2009 F’ton Base RC Report 12 Current Situation of Field

4/12/2015Spring 2009 F’ton Base RC Report 13 Current Situation of Field To get a starting point for calculations I am using two 30 foot vessels with painters that will let them get 5 feet from the mooring ball as the basis for calculations “Too close” indicates the vessels are with 5 feet of each other. Negative values indicate an overlap of that many feet. Calculations assume ball remains on surface, if ball is pulled under the distances are based on pennant length and unknown. (E3 was condemned and calculations are invalid)

4/12/2015Spring 2009 F’ton Base RC Report 14 Current Situation of Field The following 10 moorings are too close when water datum is at 4.5m(level of upper wharf). Upper fieldLower field MooringMooringDistanceMooringMooringDistance B2B3-29.2D4E4-4.8 B3B4-27.6E1E2-1.3 B7B8-16 C2C3-8.6 C3C C4C5-4 C6C74.7 C7C8-9.9

4/12/2015Spring 2009 F’ton Base RC Report 15 Current Situation of Field The following 22 moorings are too close when water datum is at 1.3m Upper fieldLower field MooringMooringDistanceMooringMooringDistance A1B1-6.2D1D2-6.3 A2A3-8.8D1E21.2 A2B2-8.3D4E A3B2-10.7E1E A3B3-13.6E6F6-3.6 A4B4-14.9F2F3-7.7 B2B B3B B6B74.8 B7B There are 39 moorings C2C C3C C4C C5C63.9 C6C C7C8-34.4

4/12/2015Spring 2009 F’ton Base RC Report 16 Marking size of boats on mooring balls The length of boat is considered acceptable if all possible distances in a column are positive. (E3 was assumed to be a 26 ft nylon line) Maximum size of a boat on a mooring assuming a summer low of 1.3 meters and using the existing chains. (x indicates a boat less than 16 feet is too big to swing on that mooring.) ABCDEF x x x * *2828 7xx*42 8 xx* 9*32 10*

4/12/2015Spring 2009 F’ton Base RC Report 17 Marking size of boats on mooring balls Assuming a water level of 3.5 Meters with B3 and B8 removed ABCDEF remove * * *42 8 Remove19* 9*40 10*

4/12/2015Spring 2009 F’ton Base RC Report 18 Assuming a Custom Mooring Line at surface at upper wharf less 1 meter The following moorings are too close when the water is 3.49 M MooringMooringDistance B7B80.8 The 11 following moorings are too close for 30 footers at 1.3m Upper fieldLower field MooringMooringDistanceMooringMooringDistance B2B3-17.2D3E3-9.8 B3B4-9.6D4E40.7 B7B8-38.5E1E2-5.4 C2C3-1.1 C3C4-8.7 C4C5-6.5 C6C C7C8-15.2

4/12/2015Spring 2009 F’ton Base RC Report 19 Assuming a Custom Mooring Line at surface at upper wharf less 1 meter Changing the size of boats to 28 feet the 11 following moorings are too close Upper fieldLower field MooringMooringDistanceMooringMooringDistance B2B3-13.2D3E3-5.8 B3B4-5.6D4E44.7 B7B8-34.5E1E2-1.4 C2C32.9 C3C4-4.7 C4C5-2.5 C6C7-7.9 C7C8-11.2

4/12/2015Spring 2009 F’ton Base RC Report 20 Assuming a Custom Mooring Line at surface at upper wharf less 1 meter Changing the size of boats to 22 feet the 11 following moorings are too close Upper fieldLower field MooringMooringDistanceMooringMooringDistance B2B3-1.2 B7B C6C74.1

4/12/2015Spring 2009 F’ton Base RC Report 21 Assuming a Custom Mooring Line at surface at upper wharf less 1 meter Marking sizes on mooring balls. This does not mean that the mooring block is heavy enough to hold a boat of that size. Sizes of mooring blocks are yet to be determined. Reducing the length of the mooring line reduces the holding power of the mooring, which makes the size of the mooring block more important.

4/12/2015Spring 2009 F’ton Base RC Report 22 Assuming a Custom Mooring Line at surface at upper wharf less 1 meter Marking sizes on mooring balls. Maximum size of a boat on a mooring assuming a summer low of 1.3 meters ABCDEF * * *42 8 moved22* 9*40 10*

4/12/2015Spring 2009 F’ton Base RC Report 23 How do we proceed? Start from scratch A boat “L” long can go anywhere? ( What is “L”? ) Make areas for different sized boats Plan on marking moorings for length. How many moorings? Live with what we have? Proceed with Custom Mooring Lines? Is overlap acceptable?