May 19, 2009JWST Partner's Workshop1 NIRCam Status Marcia Rieke University of Arizona JWST Partner’s Workshop Ottawa, Canada May 19, 2009 JWST-PRES-012902.

Slides:



Advertisements
Similar presentations
OTA Status Report K.Ichimoto/Y.Suematsu, NAOJ Following institutes/companies are in collaboration. J-side:ISAS (Institute of Space and Astronautical Science)
Advertisements

CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
30-meter cabin refurbishment for a large Field Of View: status of on-going study S.Leclercq 28/04/2008.
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 2.3 September 19,
C. Beichman, Dimitra Touli, Gautam Vasisht, Roger Smith Tom Greene
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Pre-launch Characterization of the CERES Flight Model 5 (FM5) Instrument on NPP S. Thomas a, K. J. Priestley b, M. Shankar a, N. P. Smith a, M. G. Timcoe.
DHS/DFS description, JWST Informal Monthly, November 2003 Sivaramakrishnan Co-phasing JWST during commissioning using Dispersed Hartmann Sensing or Dispersed.
SECCI/COR2 Status Report SECCHI CONSORTIUM MEETING D. Socker, S. Plunkett, A. Vourlidas.
1 NIRCam Monthly Science Team Telecon March 6, 2008.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NGAO NGS WFS design review Caltech Optical Observatories 31 st March 2010.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
F444W F300M F277W F356W F480M F335M F360M F460M F410M F430M LWF1 LWF2 LWF3 LWF4 LWF5 LWF6 LWF7 LWF8 LWF9 LWF10 LWF11 LWF12 F322W2 LWF F250M Imaging pupil.
The background for this poster shows a life size drawing of one NIRCam module. The other side is a mirror image. The two modules are mounted back-to-back.
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
October 1 -10, 2014JEM-EUSO Workshop - Toulouse1 Balloon – EUSO Xenon / UV LED Flasher Calibration Evgeny Kuznetsov for UAH / MSFC GLS team University.
CCD testing Enver Alagoz 12 April CCD testing goals CCD testing is to learn how to – do dark noise characterization – do gain measurements – determine.
Mark Clampin Observatory Project Scientist Goddard Space Flight Center 217 th American Astronomical Society Meeting JWST Telescope Optics: Progress Report.
IR filter wheel UVIS filter wheel (one of twelve) Characterization Tests of WFC3 Filters S. Baggett 1, R. Boucarut 2, R. Telfer 3, J. Kim Quijano 1, M.
Optical Design Work for a Laser-Fiber Scanned
MCAO Adaptive Optics Module Mechanical Design Eric James.
MCAO Adaptive Optics Module Subsystem Optical Designs R.A.Buchroeder.
HESSI Imaging Capability Pre Environmental Review Brian R. Dennis GSFC Tuesday, February 29, 2000.
NIRCam: A 40 Megapixel Camera for JWST
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
NIRCam ETU Testing at LMATC, Palo Alto Kailash C. Sahu.
Chris Chrzanowski Charles Frohlich Swales Aerospace, Inc.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
NIRCam DHAS and Array Characterization
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Optical surface measurements for very large flat mirrors Jim Burge, Peng Su, and Chunyu Zhao College of Optical Sciences University of Arizona Julius Yellowhair.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Optical Subsystem Roy Esplin Dave McLain. Internal Optics Bench Subassembly 2 Gut Ray Dichroic Beamsplitter (MWIR reflected, LWIR transmitted) LWIR Lens.
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
Zero field The 25 ‑ m f /0.7 primary mirror for the Giant Magellan Telescope (GMT) is made of seven 8.4 ‑ m segments in a close packed array. Each of the.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
4/20/2004s.e.mathews1 Steward Observatory Technical Division Mechanical Engineering Seminar Series Seminar #1 April 20, 2004.
Image Quality –Which Metric Should I Choose? Jed Hancock Optical Sciences 521.
Kailash C. Sahu NIRCam: Status Update 1m Cold, space-facing side
FLAO_01: FLAO system baseline & goal performance F. Quirós-Pacheco, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA MIRI VM2 Testing Scott Friedman and the MIRI Test Team (special thanks to Paul Eccleston, Alistair.
NIRCam at a Glance. The JWST Observatory Coffee 5/02/2013 2/24, Diameter: 6.5 m.
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
Periscope Configuration
The INS NIRCam Team.
System Performance Metrics and Current Performance Status George Angeli.
NIRISS and Transit Spectroscopy (What you should know before observing with NIRISS) Loïc Albert for the NIRISS Team Enabling Transiting Exoplanet Science.
11-Jun-04 1 Joseph Hora & the IRAC instrument team Harvard-Smithsonian Center for Astrophysics The Infrared Array Camera (IRAC) on the Spitzer Space Telescope.
Extended Detector Cutoff Considerations WFIRST Project Office May
NIRISS Science Team Meeting Oct 2015 NIRISS Activities in CV3 André Martel.
Peterson xBSM Optics, Beam Size Calibration1 xBSM Beam Size Calibration Dan Peterson CesrTA general meeting introduction to the optics.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
The High Altitude Observatory (HAO) at the National Center for Atmospheric Research (NCAR) The National Center for Atmospheric Research is sponsored by.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y APS Formation Sensor.
February 21, 2002TIPS meeting1 "Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." TIPS.
1 WFC3 – Critical Science Review Science Driven CEIs Requirements.
ACS WFC Flat-Field Changes Temperature change from -77 C to -81 C on July 4, 2006 leads to expected changes for flat fields. Are L-flat measures stable.
“Phase C” Design of the JWST/FGS Tunable Filter Imager TIPS/JIM June 15, 2006 Alex Fullerton STScI / UVic.
MIRI day 3 june 2010 Biography of JWST MIRI SMO FM MIRI day 1.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
NRC – 1 – D3 NIRCam Instrument-test Task DescriptionVersion Vector boresight and focus Responsible Parties Principal: Christopher Willmer.
Jitter test Responsible Parties Test Goals
Single Object & Time Series Spectroscopy with JWST NIRCam
NIRSpec pipeline concept Guido De Marchi, Tracy Beck, Torsten Böker
JWST NIRCam Time Series Observations
Chris Willott, Loic Albert, René Doyon, and the FGS/NIRISS Team
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
Optics Alan Title, HMI-LMSAL Lead,
Presentation transcript:

May 19, 2009JWST Partner's Workshop1 NIRCam Status Marcia Rieke University of Arizona JWST Partner’s Workshop Ottawa, Canada May 19, 2009 JWST-PRES

May 19, 2009JWST Partner's Workshop2 Read Noise with ASICs A set consisted of sample ramps. Data taken using development unit ASICs and Qual FPA

May 19, 2009JWST Partner's Workshop3 How to Use Subarrays An open question in using the subarray readout mode is whether special calibrations are needed for each subarray location and size or whether data can be extracted from full frame data. For 2-sample (CDS) data, we may recommend taking darks before the exposure –SCAs run from an ASIC may not have the reset anomaly that we see running in buffered mode w/ a Leach controller Reference pixels do not provide any benefit. –Again need to be careful about possible ASIC vs Leach or buffered vs unbuffered mode caveats Flats can be used from full frame data. no ref pix corr ref pix corr

May 19, 2009JWST Partner's Workshop4 Illuminated Subarrays Arrays run simultaneously so LED variations are seen in all. NIRCam will use a subarray or “window” readout mode to extend dynamic range. It may be the principal mode for observing transits by extra-solar planets. A 128x128 subarray was used with four SCAs (two shown here) in our test dewar. Illumination was provided by 2micron LED, and a series of 2-sample ramps were taken.

May 19, 2009JWST Partner's Workshop5 Subarray Flatfielding Gray scale and plot show the result of ratioing subarray to full frame data. Neither image was linearity-corrected. The variations of +/-2% agree with expectations from counting statistics. Full frame flats appear to be fine for use with subarrays.

May 19, 2009JWST Partner's Workshop6 C038 C045 C044 C043 FM1 Dark (black is good) B1 B3 B4B2 B1 B3 B4B2 FM1 Illuminated (white is good) Red box is coronagraphy field. Flight Short Wavelength FPAs are in Assembly

May 19, 2009JWST Partner's Workshop7 C074 C105 C104 C101 A4 A2 A1 A3 FM2 Dark (black is good) FM2 Illuminated (white is good) Red box is coronagraphy field.

May 19, 2009JWST Partner's Workshop8 Flight Wide Filters Plot below shows the transmission functions for the flight candidates. Dashed line is the requirement. Out of band blocking is also excellent. Req.

May 19, 2009JWST Partner's Workshop9 ETU Optic Test Pupil Wheel Config FWA ETU Optic Test PW2 – FLAT FIELD PINHOLES PW3 – Uncoated Fused Silica PW10 – Uncoated Fused Silica PW11 – WEAK LENS - 6 PW12 – ETU DHS 2 PW1 – CIRCULAR APERTURE PW9 – WEAK LENS - 7 PW7 – FILTER SURROGATE PW6 – DHS MASS SURROGATE PW4 – FILTER SURROGATE PW8 – OUTWARD PINHOLES PW5 – FILTER SURROGATE

May 19, 2009JWST Partner's Workshop10 ETU Optic Test Filter Wheel Config FWA ETU Optic Test FW8 – FILTER F187N FW12 – DHS FILTER F150W2 FW11 – FILTER F070 FW9 – IMAGING PUPIL FW1 – FILTER SURROGATE FW10 – FILTER SURROGATE FW7 – WEAK LENS - 8 FW3 – FILTER F115W FW4 – FILTER F070W FW5 – FILTER F200W FW6 – FILTER F212N FW2 – FILTER SURROGATE Optics used in acceptance test

May 19, 2009JWST Partner's Workshop11 DHS Element in ETU Pupil Wheel

May 19, 2009JWST Partner's Workshop12 Precision alignment and KOH bonding of ETU PIL optics is complete Assembly is being integrated with mechanism for further environmental tests ETU Pupil Imaging Lens Assembly

May 19, 2009JWST Partner's Workshop13 ETU Short Wave Fold Mirror Assembly WFE Pre-Vibe: 11.4 nm rms WFE Post-Vibe: 11.8 nm rms Vibration ConfigurationSWFM Assembly

May 19, 2009JWST Partner's Workshop14 ETU SWFM Cryo-cycling Results Mirror exceeded spec in first Cycle, then maintained acceptable surface figure through Cycles 2 and 3 Note: chart shows only data points taken at points of thermal equilibrium Requirement 17.8 nm (CA) Bottom of 3 rd Cycle: 13.8 nm rms

May 19, 2009JWST Partner's Workshop15 Progress on Wavefront Error Recall that the NIRCam optical train as first realized in the Pathfinder did not meet its wavefront error requirement. Several causes were identified: 1) Mount-induced distortion 2) Coating-induced distortions 3) Poor alignment of lenses within a triplet An improved alignment scheme is helping, and the coating problem has been traced to thermal shock at JDSU. A new bonded mount design is the last improvement.

May 19, 2009JWST Partner's Workshop16 Short Wave Bonded ZnSe Singlet “Optic Saver” Standoff

May 19, 2009JWST Partner's Workshop17 Surface figure cooldown of SW ZnSe S1 Surf fig rms = 2.85nm Zernike coeffs for surface S1 deformation (mm) N M A(N,M) E-10 { Piston E-10 { X-tilt E-09 { Y-tilt E-09 { Astigmatism E-06 { Focus shift E-09 { Astigmatism 0 or E-11 { Trefoil Y E-08 { Coma 3rd ord Y E-09 { Coma 3rd ord X E-06 { Trefoil X E-09 { Tetrafoil Y E E-07 { Spherical 3rd + Focus E E-09 { Tetrafoil X E-09 { Pentafoil Y E E-09 { Coma 5th ord Y E-09 { Coma 5th ord X E E-10 { Pentafoil X E-09 { Hexafoil Y E E E-08 { Spherical 5th + 3rd + Focus E E E-06 { Hexafoil X

May 19, 2009JWST Partner's Workshop18 Surface figure cooldown of SW ZnSe S2 Surf fig rms = 2.74nm Zernike coeffs for surface S2 deformation (mm) N M A(N,M) E-10 { Piston E-10 { X-tilt E-10 { Y-tilt E-09 { Astigmatism E-06 { Focus shift E-09 { Astigmatism 0 or E-10 { Trefoil Y E-07 { Coma 3rd ord Y E-08 { Coma 3rd ord X E-06 { Trefoil X E-10 { Tetrafoil Y E E-07 { Spherical 3rd + Focus E E-10 { Tetrafoil X E-10 { Pentafoil Y E E-09 { Coma 5th ord Y E-09 { Coma 5th ord X E E-11 { Pentafoil X E-09 { Hexafoil Y E E E-06 { Spherical 5th + 3rd + Focus E E E-06 { Hexafoil X

May 19, 2009JWST Partner's Workshop19 Differences in transmitted WFE in NIRCam SW Path at 2.0  m for 5 field points from cool-down mount-induced surface figure changes SW ZnSe lens rms = 2.08nm rms = 2.15nm rms = 2.09nm rms = 1.97nm rms = 2.48nm Prediction is 2.48 nm versus 8.02 budget allocation

May 19, 2009JWST Partner's Workshop20 Test Article Margin of Safety Tests Bonding Tests Epoxy samples for testing. Sample lens substrates with metal pucks attached have successfully been cryo-cycled to 16K Characterization of epoxy samples for CTE and other properties is underway Margin of safety test has been designed with testing to occur in June

May 19, 2009JWST Partner's Workshop21 ETU Build Flow Cold Alignment Cycle 1 Cold Alignment Cycle 2 Cold Alignment Cycle 3 Check Stability Nudge Install PIL, FPA Install Baffle Covers AT FPA & Wavefront Sensing Tests AT Module B Plug ‘n’ Play, Pt 1 AT TRR OMA Tolerance Review OMA Calibration Review WFE Review OMA Build OMA Calibration OMA TRR Warm Alignment Data Review Predict WFE, focus with OMA OMA Tolerance Analysis Predict WFE with p-SMART Module B Plug ‘n’ Play, Pt 2 p-SMART Test SFPA / SMART Metrology Alignment Plan Review Monte Carlo Analysis Review WFS Review Module Integration August  Delivery to GSFC in Oct.