Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.

Slides:



Advertisements
Similar presentations
RFQ Tuning and RFQ Control Status
Advertisements

Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Thomas Jefferson National Accelerator Facility CWL/Kovar/March 1, 2007 Page 1 Determining Loaded-Q for SRF Cavities Used In ERLs (What do you mean it is.
Shuichi Noguchi, KEK6-th ILC School, November Beam-Operation Cavity Voltage Control by Feedback & Tuner Dumping of HOM’ s by HOM Dumper  Bunch Induced.
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
Lorentz force detuning measurements on the CEA cavity
Stephen Molloy RF Group ESS Accelerator Division
1 ALICE rf project meeting Kai Hock, Cockcroft / Liverpool 19 May 2008.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
LLRF Cavity Simulation for SPL
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Tom Powers LLRF Systems for Next Generation Light Sources LLRF Workshop October 2011 Authored by Jefferson Science Associates, LLC under U.S. DOE.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
1 Simulation for power overhead and cavity field estimation Shin Michizono (KEK) Performance (rf power and max. cavity MV/m 24 cav. operation.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
Cornell digital LLRF system S. Belomestnykh LLRF05 workshopCERN, October 10, 2005.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
1 new module Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
EXAMPLE OF REDUCED CRYOMODULE HEAT CAPACITY DUE TO HELIUM PRESSURE RETURN LEVELS 0L04 CASE HISTORY.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
ESS LLRF and Beam Interaction
Cost Optimization Models for SRF Linacs
Test of the dressed spoke cavity
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
LINAC AG • IAP • Goethe Universität Frankfurt
Tuner system Zhenghui MI 2017/01/17
Cavity Theory Feng QIU.
Test plan of ESS HB elliptical cavity
Outlook of future studies to reach maximum gradient and current
Test plan of ESS HB elliptical cavity
Joint Accelerator Research JGU & HZB
Cavity resonance control
Experience with High Loaded Q cavity Operation at JLAB
Jefferson Lab Low Level RF Controls
Cost Optimization Models for SRF Linacs
CEPC RF Power Sources System
Performance Recovery at CEBAF
Accelerator Physics Particle Acceleration
USPAS Course on Recirculated and Energy Recovered Linear Accelerators
ERL Director’s Review Main Linac
RF Issues in Energy Recovery Linacs
Strategic Communications at TRIUMF
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial PRACTICAL ASPECTS OF OPERATION  Interlocks  Optimizing Loaded-Q  Pulsed response as a function of loaded-Q  Multiple cavities driven by a single source

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial CRYOMODULE INTERLOCKS  NEVER OPERATE A CRYOMODULE WITH THE COUPLER INTERLOCKS BYPASSED  Coupler Interlocks Arc detector(s) Coupler vacuum Window temperature Water flow (If water cooled) Electron probe (Useful but not required) Water temperature (Useful but not required)  Cryomodule Cavity vacuum Helium level Helium pressure (Useful but not required depending on cryo plant) Insulating vacuum (Useful but not required)  RF Driven Interlocks Quench detection E 2 /P FWD ratio Gradient Present with RF off

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial OPTIMIZING LOADED-Q Where  δf is the frequency shift of the cavity from the generator frequency  ψ B is the phase of the resultant* beam relative to cavity gradient and  β = (Q 0 – Q L ) / Q L You need to take the derivative of this equation with respect to Q L in order to calculate the minimum klystron power necessary. * Note: For an multiple beams at once, i.e. an energy recovered linac (ERL), the resultant beam current is the vector sum of the beams

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial MODERATE AMOUNT OF MATH

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial REDUCED SOLUTION FOR SRF CAVITIES OPERATED ON CREST But life is never perfect

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial THE EFFECTS OF TUNING ON OFF CREST CW BEAM LOADING On beam turn on the forward power increases the phase shifts and microphonics effects are multiplied The tuner operates with a goal of making ψ Kly equal to zero by shifting the frequency by δf S which compensates for the I 0 R C sinψ B term. Thus ψ Kly → 0 and P Kly is minimized to : Where δf M is the frequency shifts due to microphonics Thus in this case: 0

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial THEORETICAL EXAMPLE OF TUNERS COMPENSATING FOR OFF CREST BEAM LOADING CEBAF 7-Cell Cavity L = 0.7 m (r/Q) = 960 E = 8 MV/m Q L = 2 x 10 7 δf = 10 Hz I 0 = 10 mA Pass one ψ B = -10º Pass two ψ B = 166º Resultant Beam 0.7 mA at 78°

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial THEORETICAL EXAMPLE OF TUNERS COMPENSATING FOR OFF CREST BEAM LOADING

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial PREDICTED AND MEASURED FORWARD POWER IN AN ERL The solid lines indicate the predicted values based on: Q L = 2 x 10 7 E = 5.6 MV/m. Δf = 10 Hz Test Process: Tune the cavity with no current. Disable the mechanical tuners. Ramp the current up and record the forward power and phase. Repeat with Tuners enabled.

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial Predicted and Measured RF Drive Phase In an ERL

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial EFFECTS OF MICROPHONICS AND IMPERFECT ENERGY RECOVERY IN AN ERL CAVITY E = 20 MV/m, I 0 = 100 mA

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial SELECTING LOADED-Q FOR OFF CREST BEAM  Selection of loaded-Q has implications on RF power requirements.  When the beam is operated on crest the process is straight forward and margins only have to be added for Microphonics, Uncertainties in cavity parameters such as Q L and operating gradient. Overall Margin Detuning effects.  When the beam is not operated on crest operational modes must be considered. Often this can substantially reduce the RF power requirements. Ramping current simultaneous with operating tuners. Allowed levels of pulsed operation Uncertainty of the relative beam phases in an ERL

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial MULTIPLE CAVITIES ON SINGLE SOURCE It can be a desirable to use a single source to drive multiple cavities. Reduced cost per Watt at higher RF –Power levels. Availability of klystrons or IOTs at desired levels for multiple cavities. Unavailability of klystrons, IOTs at desired power levels for single cavities. Reduced number of LLRF systems to drive cavities.

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial MULTIPLE CAVITIES ON SINGLE SOURCE It can work fine when: The cavities are operated near crest. The beam is not sensitive to minor variations in gradient and phase. Loaded-Qs are well matched. Gradients are close to the same for all cavities. The loaded-Qs are relatively low as compared to pressure sensitivity and microphonics. You have the advantage of a large number of cavities and individual errors are corrected by statistics. It can present problems when: The beam is sensitive to errors in gradients or phase. Detuning becomes significant as compared to the FPC bandwidths. Cavities are operated at different gradients. Cavities have different loaded-Qs Cavities are operated at different beam phases with respect to crest. While linacs are an area where this concept can be very practical, injectors are an area where the problems become important especially when space charge and cavity induced beam focusing are important.

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial SIMULATION METHOD  Use the basic complex RF voltage to complex gradient equation to calculate the field in each cavity, including beam phase and cavity detune angle.  Sum the real and imaginary parts of the electric field.  Compare the vector sum to the desired vector sum and calculate the error in the vector sum.  Add, with gain, the complex error to the complex RF voltage from the current pass.  Use this sum to calculate gradient in each cavity.  Repeat until the real and imaginary parts of the vector sum error are below a threshold. Where ψ is the cavity detune angle.

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial ERROR IN GRADIENT AND PHASE WHEN 1 OF 3 CAVITIES IS DETUNED Q L = 2e6 F 0 = 1497 MHz (r/Q) = 960 Ω/m L = 0.5 m β = 3000

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial PHASE ERROR IN WHEN THE PHASE IN 1 OF 3 CAVITIES IS DIFFERENT

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial GRADIENT ERROR IN WHEN THE PHASE IN 1 OF 3 CAVITIES IS DIFFERENT

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial Gradient Error in When the Loaded-Q of 1 of 3 Cavities is Higher Than the Others

DISTRIBUTION STATE A T. Powers /SRF Workshop 2011 Tutorial CONCLUSIONS Thank you for your attention. I hope what I have presented will be useful. Selected References. Padamsee, Knobloch, and Hays, RF Superconductivity for Accelerators, John Wiley & Sons T. Powers, “Theory and Practice of Cavity Test Systems” 2005 SRF Workshop. (Note: Includes all of the math for testing cavities) T. Powers, “RF Controls Experience with the JLAB IR Upgrade FEL”, 2009 ERL Workshop. J. Delayen, et. al., “Development of a Digital Self Excited Loop for Field Control in High-Q Superconducting Cavities, SRF L. Merminga, “RF Cavity Equations Steady State”, JLAB Technical note TN K. Davis “Microphonics Testing of the CEBAF Upgrade 7-Cell Cavity”. PAC 2001.