SEZ (IT / ITES) A Brief … No. of notified SEZs (IT / ITES)28 SEZ in Chennai18 SEZ in Coimbatore5 SEZ in Madurai3 SEZ in Trichy & Salem 1 each No. of operational.

Slides:



Advertisements
Similar presentations
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Advanced Piloting Cruise Plot.
EuroCondens SGB E.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Addition and Subtraction Equations
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
CALENDAR.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
Grade D Number - Decimals – x x x x x – (3.6 1x 5) 9.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Progressive Aerobic Cardiovascular Endurance Run
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Numeracy Resources for KS2
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

SEZ (IT / ITES) A Brief … No. of notified SEZs (IT / ITES)28 SEZ in Chennai18 SEZ in Coimbatore5 SEZ in Madurai3 SEZ in Trichy & Salem 1 each No. of operational SEZs (IT/ ITES)19 No. of SEZ units in the above SEZ 58 Total land area under IT ITES SEZ H Investment FY Q Rs Cr Exports reported FY Q Rs Cr Manpower deployed in the SEZs FY Q (direct + indirect)

A Brief … ParticularsChennaiCoimbatoreMaduraiSalemTrichy Total Zones Notified Operational Commenced Construction Not commenced any activity Area occupied (H) Manpower (09-10) (direct+indirect) Investment (09-10) (in Rs. Cr Export (09-10) (in Rs. Cr) SEZ (IT / ITES)

SEZ (IT / ITES) - Zones 1Tata Consultancy Services LtdChennai 2Syntel International Pvt. LtdChennai 3ETL Infrastructure Services LimitedChennai 4Hexaware Technologies LtdChennai 5Shriram Properties and Infrastructure Pvt LtdChennai 6DLF infocity Developers (Chennai) LtdChennai 7Electronics Corporation of Tamil NaduChennai 8Hacciendaa Infotech Relators Pvt LtdChennai 9Arun Excello Infrastructure Pvt LtdChennai 10Zillion Estates Pvt LtdChennai 11 Electronics Corporation of Tamil Nadu - Shollinganallur - II Chennai 12Chennai Business Park Pvt LtdChennai 13Cognizant Technology Solutions Pvt LtdChennai 14ETA Technopark Pvt LtdChennai

15Velankani Technology Parks Pvt. LtdSriperambhadur 16SNP Infrastructure Pvt. Ltd.,Chennai 17Tril Infopark LtdChennai 18Estra IT ParkChennai 19Coimbatore Hi-Tech Infrastructure Pvt LtdCoimbatore 20Electronics Corporation of Tamil NaduCoimbatore 21Bannari Technoparks Pvt LtdCoimbatore 22Span Venture Pvt LtdCoimbatore 23True Developers Pvt. LtdCoimbatore 24Electronics Corporation of Tamil Nadu - ELCOT - I MaduraiMadurai 25Electronics Corporation of Tamil Nadu - ELCOT - II MaduraiMadurai 26Rudradev Township Pvt. LtdMadurai 27Electronics Corporation of Tamil Nadu - TrichyTrichy 28Electronics Corporation of Tamil Nadu - SalemSalem SEZ (IT / ITES) - Zones

Zone wise no of units –Arun Excello 2 –DLF31 –ETL9 –ETA2 –Shriram3 –ELCOT - Chn3 –Velankanni1 –Campus Units 2 (TCS & Hexaware) SEZ (IT / ITES)

–Zone wise no of units SEZ units in Coimbatore »CHIL4 »ELCOT – Cbe1 SEZ (IT / ITES)

Zone wise investment and employment (09-10) Sl noName of the ZoneInvestment (Cr)Manpower (nos) 1ETL DLF ELCOT ELCOT - Cbe CHIL - Cbe TCS ETA Syntel Hexaware Arun Excello Shriram Chennai Business Park Velankanni SNP ELCOT 1 – Madurai True Developers Tril Infopark TOTAL

Zone wise export (08-09) Sl noName of the ZoneExport (Cr) 1ETL DLF ELCOT CHIL - Cbe TCS ETA Hexaware Arun Excello19.21 TOTAL

Zone wise export – a comparison Sl noName of the ZoneExport (Cr) Q2 – (08-09) Export (Cr) Q2 – (09-10) 1ETL DLF ELCOT CHIL - Cbe TCS ETA Hexaware Arun Excello Shriram Properties TOTAL