Presentation of quality Results July– September 2010.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

Números.
Symantec 2010 Windows 7 Migration Global Results.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
1
EuroCondens SGB E.
Master Budget and Responsibility Accounting
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
Target setting for the SEE 2020 strategy Jahorina, Bosnia and Herzegovina September 11 th
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Year 6 mental test 10 second questions
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
YEAR END FINANCIAL REPORT YEAR END FINANCIAL REPORT November 15, 2011 Presented by: John A. Sabo, Associate Director - Leading Services.
1 A B C
Current Uses and Outcomes of Hematopoietic Stem Cell Transplantation 2012 Summary Slides SUM12_1.ppt.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
Factoring Quadratics — ax² + bx + c Topic
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Introduction to Cost Behavior and Cost-Volume Relationships
PP Test Review Sections 6-1 to 6-6
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
VOORBLAD.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. Merchandising Activities Chapter 6.
THE NATIONAL GALLERY STRUCTURE CHART As at 30 JUNE 2010.
Subtraction: Adding UP
: 3 00.
5 minutes.
Analyzing Genes and Genomes
Weisburd, Lawton, Ready, Rudes, Cave, and Nelson Presented by Breanne Cave 1.
Static Equilibrium; Elasticity and Fracture
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Cost-Revenue Analysis for Decision Making
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Comparison between tillage transect and supplementary data GLPF Grant- Team meeting #5 July 23-24, 2013.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Presentation of quality Results July– September 2010

1. Quality July-September owerwiew 2. Quality October-December plan 3. Quality – summarization activities 4. Operations: Trend payoff products ETA ČR 5. Suppliers claims 6. Trend payoff and sales products ETA ČR+SR 7. Efficiency of ETA QI at supplier – China 8. Appendix: Strategy of quality 2

3 China Local quality Projects Activities  Preparation of coffee mill ETA 0067 (focusing on the modifications, tests in the test laboratory)  Control Plans - to ensure continuous innovations for the Spring 2011  Control Plans – actual status - 60  Deliveries TESCO  Analyzer plastics company GUT /NOT - open collaboration with the Faculty of Chemical Technology in Pardubice-based authentication IMD-cooperation with ETA project manag  Process Mapping in servicing ETA -> suggestions for improvements, setting new processes  The ”Project Management“ in the IS Business – cooperation with JKR and Mrs. T. Kožuská  ISO 9001:2008 – Update and create a process map current processes + cards Others  Canton Fair 10/ Products for 2011, meeting with key suppliers ETA  IFA Fair in Berlin  Support for Chunju suppliers in China to launch serial production of the ETA-863,ETA-865, ETA- 861 modifications  Verification of payment method options within the ETA Office Shenzhen

4 China Local quality Projects Activities  Select your product from Canton r provide samples for ETA CZ  Check the current status of projects ETA products  Support for the implementation of the signing of a new contract supplier in China  Defining new rules for price negotiation in the process of embedding the standard ETA target end of October  Financial audit in the office  Production of coffee mill ETA 0067 (focusing on the modifications, tests in the test laboratory)  Strengthened control of the first delivery to ETA Hlinsko News Christmas 2010  Control Plans - to ensure continuous innovations for the year 2011  Deliveries of ETA x865  The ”Project Management“ in the IS Business – cooperation with JKR and Mrs. T. Kožuská  Process Mapping in servicing ETA -> suggestions for improvements, setting new processes  Process SP (spare parts)– effective set-ordering spare parts  ISO 9001:2008 ->ISO 9001:2008 – Update and create a process map current processes + cards => implementation to QMS  Improving internal communication system of quality management Others

Process – effective activities in service ETA Hlinsko Process – logistik new packaging possibilities Process – possibilities for material testing – equipment Process – continual update procedural maps Process – externaly activities – resulting and implementation into handbook of quality Process – personal reduction high job flexibility in China office Process – communication improvement Process SP (spare parts) – effective set-ordering spare parts Process „Project management“ – IS Business Process - six sigma finalizing basic project 5 Support and cooperation in all process across company ETA

6 The proportion of defective products in servicing ETA ETA on products sold during the period leden August Course of return depends on the amount of sales and quality of entries for selected products The negative trends caused by product např.konvice ETA 2596, ETA 0172 fryer, vacuum ETA x466, bakery ETA7149, 2149, kuch.robot ETA0027, chopic ETA a partial failures - these affect the overall trend.. Ensuring the quality of news - our own projects, process news release, acceptance and acceptance by the Control Plan, the goal of PQA China

7 Dodavatelské reklamace 2010 level of performance complaints costs 42,15% increase in the success of outcomes analysis Factor Three, press the QCR 8Doing 'validation of process, release products, according to CP, effective communication, claim cost -. Liantek,Donlim,KingClean, TOP 20 dodavatelé produktPO/POV,závadaprioritadodavatelrekl./upoz.zaháj.rekl.skut. nákl.přizn.nákl.obdrž.nákl. ukonč.rekl.poznámka 2140vys. návratnostCGalyR $0,00$1 613, CShunkangR $2 266,00$1 270, odečet AKing CleanR $864, odečet komponentSilitalR $58, vys. návratnostBConvideR $1 318,75$312, víkoADon LimR $761, přijata NO komponentContrexR $21, komponentWuhanR $18,15 polovina června vys. návratnostBLianchuangR $3 994,37$3 969, kabel,elektronikaALenaU ,508, komponentKing CleanR $31, žehlící deskaBSanwellU přijata NO x582vys. návratnostASupremeR $0,00$3 500, , není smlouva 6450PCBAChunjuR $280, , komponentMerlettR $1 375,00 odečteno z faktury , ,9komponentCapitaniR $330,00$269, dobropis 0027příd.strojky BJTWTR $920,11 $1 022, komponentIrcaR $26,00$8, odečet z faktury 2140vys. návratnostCGalyR $0,00$3 227, , ,110komponentMerlettR $80, rozlepené krabiceBLenaR $178, krabic zdarma komponentContrexR $21, x582spínačASupremeU AChunjuR $4 199, PCBBLianchuangR $9 696,96 $3 040,96 poštou, další prasklé pláštěASupremeU příd.strojky BJTWTR $721,80 $802, vys. návratnostCGalyR $0,00$3 227, AEternalR $5 535, AGalanzR $7 257, ADon LimR $4 948, AChunjuR $2 681, špatná funkce přístřikukomponentArieteR $3 671, AKing CleanR $4 765, BConvideR CLundarR $5 413, ND rámy víkaADon LimR komponentMerlettR $242, ušpiněné podstavceADon LimU přijata NO DArieteU celkem $ ,43$47 364,78$22 654,31

8 Legenda: - Total product return ETA% (the proportion of defective products sold products) - Sales in units CR + SR for the period

9 NOK supply in % of the total supply of each supplier OK supply in % of the total supply of each supplier The annual evaluation of suppliers with the requirements for products => selection of suppliers according to quality of process stability. ETA CZ for Chinese producers suppliers evaluation structures in 2011

10 Base Value Current Target Long Term Goal (FY 2010) (actual Q) (FY 2011) (FY 2013) 1.Defect rate 7,53% 8,02% 7% < 5,7 % 2. Returned the cost of poor quality 47,6% 42,15% 60% 80% 3.Control plan (SKUs ) % new products 4.ISO 9001 ISO9001:2000 ISO9001:2008 surveillance audit according to ISO continual improvement of the Quality management system 5.Supply contracts (TOP20 CN suppliers ) 0% 5% 25% > 90% 6.Project of testing laboratory in China -- prepare for the possibility of testing the products directly in China – verification testing.Select equipment in Europe company GUT 1.Quality manual for year 2011 update and replenishment

Thank you for attention 11