1 H.O.P.I. Consulting 2 Common Cause Analysis (CCA) Is not Root Cause Analysis Does not prevent salient events Is an ongoing long term process Is aimed.

Slides:



Advertisements
Similar presentations
Report # Downed powerline inhibits fire attack. Report Number: Report Date: 11/13/ :35.
Advertisements

Optimized Human Error Evaluation
Providing Independent Living Support: Benefits of Service to Volunteers Trainer:_______ Date: _______.
DIBELS Progress Monitoring
Where can you use the Fishbone Diagram in the PDSA Cycle?
Making the System Operational
Accident and Incident Investigation
The Five Ss.
How to Schedule (and Put off Procrastinating)
SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
Battery-Informer TM Mega-Power The Battery-Informer TM A Battery Sale State of Health Indicator (SOH)
1)List and briefly describe the three project quality management processes. Quality Planning: Identify which quality standards are relevant to project.
DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
Drive Right Chapter 3 Basic Vehicle Control
How to Import a Survey from SPS Format
Club Car IQ Technical Information
Getting started with LEGO NXT Mindstorms software This is intended to be a short introduction to the LEGO Mindstorms software and programming the LEGO.
Short-term Capacity Optimization
Hazard Recognition and Risk Analysis
GETTING IT RIGHT. Today we will - review or refresh your approach to making funding bids by: Not sure? Ask! And this is to remind me and you please to.
1 Protecting the Long Island Business Community A Public Safety Partnership.
Matthew Watts Dr. Daniel Apple Wade Ellis Jr. Designing an Active Learning Math Experience.
Copyright © 2010 Pearson Education, Inc. Chapter 15 Probability Rules!
15 Things You Probably Never Knew Or Thought About
© 2014 WritePoint Ltd. All rights reserved. Case Study: Real Lessons for Technical Writing Projects… or… Why a TWENTY hour project took ONE HUNDRED AND.
Customers Request the Darndest Things* 10 Challenges for VUI Designers Eduardo Olvera User Interface Designer.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Iowa Department of Education ::: 2006 ::: Principle 2 ::: PPT/Transparency ::: W2-1 Principle 2 Children need to develop fine motor skills for writing.
CricketSat Assembly.
Pearson Education Ltd. Naki Kouyioumtzis
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 20 Slide 1 Critical systems development 2.
1 CHM 585 / 490 Chapter SPC Statistical Process Control.
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
In this presentation you will:
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
The Role of Defect Elimination in Reducing Hazard Exposure Presented by: Stuart Tomlins Callide Mine.
1 Human Performance Tools System Operator Conference September and September 25-27, 2012 Memphis, TN Sam Austin Manager, System Operator Training.
Know You System Fire Extinguisher & Suppression Activation Training.
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
SWE Introduction to Software Engineering
Root Cause Analysis: Why? Why? Why?
Mechatronics Servo System Trouble Shooting. Mechatronics General Problem Management Problem Can I handle it, now? Can I identify the bad device? Call.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Motor Vehicle Level 3 Electronics and Electronic Components Resource 1.
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Chapter 1: Fundamental of Testing Systems Testing & Evaluation (MNN1063)
Chapter 11 Data Validation. Question Should your program assume the data is correct, or should your program edit the data to ensure it is correct?
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
Determining the Root Cause and Corrective Action of a Problem World Class Solutions for Global Applications Riverhawk.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Troubleshooting Electrical Circuits This lesson came from Virginia Tech and has not been edited by the Georgia Curriculum Office.
INMM Nuclear Security and Physical Protection Technical Division.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
PLC programming Part 3: Problems with solutions. Topics  Every problem is devided into three parts:  Technology description contains the general properties.
Maintenance Error Results in Bypassing Enclosure Electrical Lock Out Tag Out John E. Anderson Jr. Energy Facility Contractors Group Electrical Safety.
E2 Motors and Motor Starting
FMEA.
Mistake proofing Mistake proofing is a scientific technique for improvement of operating systems including materials, machines and methods with an aim.
Integrated Leadership
Know You System Fire Extinguisher & Suppression Activation Training
Associated Hazards and Safety Practices
Higher-Level Testing and Integration Testing
Riverhawk World Class Solutions for Global Applications
Root Cause Analysis: Why? Why? Why?
Engineering 6806 Barriers to Success Barriers.
The Troubleshooting theory
Safety toolbox Johnnie Stanton-MECA
Presentation transcript:

1 H.O.P.I. Consulting

2 Common Cause Analysis (CCA) Is not Root Cause Analysis Does not prevent salient events Is an ongoing long term process Is aimed at correcting the cause(s) of dysfunctional behaviors H.O.P.I. Consulting

3 Successful CCA requires 3 things Process Mapping Behavior Categorization Trending H.O.P.I. Consulting

4 Process Mapping What are the critical steps of the task? H.O.P.I. Consulting These will eventually become your trend buckets

5 Process Mapping What Barriers Prevent Error Propagation? H.O.P.I. Consulting Barriers are error detection strategies of self; of others; of process.

6 Behavior Categorization (Why people don’t do what is expected.) Doesn’t understand “what” the behavior does. Doesn’t understand “how” to use the behavior. Doesn’t understand “when” to use the behavior. Cannot demonstrate “effective” use of the behavior. Does not understand “expectation” for use of the behavior. Does not understand “benefit” of using the behavior. (WIFM) “Consequences” of not using the behavior < consequences of using the behavior. (cultural drivers) H.O.P.I. Consulting

7 Other Considerations Process Missing critical step Sequencing problem Branching problem Over specification Under specification Design Limitations Behavior No behavior specified Wrong behavior specified Relying on behavior when risk is too great (SPS) H.O.P.I. Consulting

8 Example: Undesired Equipment Actuation Relay technician to check Synch PT fuses Operator to start Bravo pump I&C tech to replace capacitors on PPS board Electrician to lift red lead on TB4 Step 1 Go to correct switchgear Step 1 Go to correct pump skid Step 1 Go to correct control cabinet Step 1 Go to correct motor control center Step 2 Unlatch and pull PT drawer Step 2 Actuate Bravo hand switch Step 2 Place PPS channel in bypass Step 2 unbolt and lift red lead on TB4 Step 3 Pull PPS board

9 H.O.P.I. Consulting What they said in the interviews. Relay Tech, “I knew I was in the right switchgear. When the procedure said to pull the lower fuses, I thought it meant the lower PT drawer. The lower drawer houses the undervoltage PT.” Operator, “They sent me down to start the pump. I verified I was on the right pump skid. I couldn’t see the pump. How was I to know it was already running?” I&C Tech, “What Engineer would layout the channel bypasses so they were not opposite their corresponding channel? No wonder I pulled the Delta board after putting the Bravo channel in bypass!” Electrician, “The procedure said to lift the red wire. I thought it didn’t matter that there were TWO red wires on the same terminal. I guess interrupting power to all of the SOVs really caused OPS some heartache. Do you think they’ll give me a day off?”

10 H.O.P.I. Consulting What do These Events Tell Us? Different Events Different Departments Different People All using STAR Good Candidates for CCA

11 H.O.P.I. Consulting Analyze the Steps Pull PT Drawer Actuate Handswitch Pull PC Board Lift Wires Irreversible Action When you use STAR to prevent events at irreversible steps it often stands for Shoot, That Ain’t Right

12 H.O.P.I. Consulting Don’t Miss Other Considerations Bottom Fuses or Bottom PT Drawer? No Indication of Pump Status? Confusing PPS Layout? Two Wires on One Terminal? Sequence Error, Go to XX PT Drawer, Pull Bottom Fuses Missing Critical Step, Check Pump Status Under specification, Include PPS Layout Design Limitation, Better Place to Lift Lead?

13 H.O.P.I. Consulting Fix All the Causes Assign Actions to fix the “Other Considerations. ” Create Defense in Depth Assign Actions to Fix “Common Cause.” Reduce Error Propagation by Using Detection Strategy that is Effective for Irreversible Steps. M D + E R = Ø E Managing Defenses and Reducing Error Propagation will get you to Zero Significant Events