Progetto CLEANSED PROGRESS MEETING April 03 2014 LIFE12 ENV/IT/000652 S.p.A. Navicelli di Pisa.

Slides:



Advertisements
Similar presentations
EXAMPLE PRESENTATION FOR QUARTERLY MEETINGS
Advertisements

Name each solid. Identify the height of the solid. A C. B. D.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 101.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,
AIP-2 Demo Capture Workshop 4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy.
ITRS Winter Conference 2011 Incheon, Korea 1 Work in Progress: Not for Distribution 2012 ITRS Litho One Pager April 24, 2012 Mark Neisser – SEMATECH Mauro.
Road Map To Development September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL COs Draft.
Title Subtitle.
Program Goals, Objectives and Performance Indicators A guide for grant and program development 3/2/2014 | Illinois Criminal Justice Information Authority.
Enter. The Scene Type text here Choice A1 Text for decisions Guidelines Guideline text Click on A, B or C A B C Choice B1 Choice C1 Click on A, B or C.
Compiled by John McFarlane 13 th June th June Slides Duration 5:30 minutes Version V.01.
Groupes de réconfort Calendrier des rencontres Lundi, 18 novembre, 2013 (en français) Monday, November 25, 2013 (in English) Lundi, 2 décembre, 2013 (en.
WARC 14/15 - S.S.O.R.T. / ByeBye / / KI. UM DIE WELT SEGELN ByeBye-Party Gstaad WARC 14/15 - S.S.O.R.T. / ByeBye / / KI.
INNOVATIVE INTEGRATED METHODOLOGY FOR THE USE OF DECONTAMINATED RIVER SEDIMENTS IN ROAD CONSTRUCTION Prof. Ing. Massimo Losa Dott. Ing. Pietro Leandri.
UMC Health System 74NURSE UMC Telephone Triage. Service Mission: To provide urgent medical advice over the phone directing callers to the most appropriate.
HVB Academy 1. CONTINUOUS COMPREHENSIVE EVALUATION (CCE)
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
PSC 151 Laboratory Activity 9 Electric Circuits II Series and Parallel Connections.
ACE/ARS Joint Staff Meeting ARS Program Report Field Service Accomplishments December 3, 2013.
2 ND INTERMEDIATE MEETING WP 5 Promotion and marketing WP 5.1 & WP 5.3 Ref. 2/2009: SALTWORKS– Valorizzazione ecosostenibile delle saline tra Italia e.
EVALUATIONS & STUDENT GROWTH MEASURES 2-20/ , KEEN CONFERENCE BILL BAGSHAW, ASSISTANT DIRECTOR KAYERI AKWEKS, EPC KSDE, TLA, EVALUATIONS.
Equations of Lines Equations of Lines
CLEANSED Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building LIFE12ENV /IT/ ACTIONS.
M Mission of the Owls Supporting Diversity Club (OSD Club) To transform the public perception of people with disabilities, to show that all students have.
Palo Verde Magnet High School Title I Annual Meeting October 14, 2013.
Implementing a Change in the Poverty Data Brian Reeder, Assistant Superintendent Michael Elliott, State School Fund Coordinator April 24, 2014.
RIIO – ED1 timetable Robert Friel Regulatory Strategy and
Tom Merson April 2 nd,  What’s all this social media stuff about?  Social media choices  Social media strategy  Traditional marketing vs. inbound.
Commercial in confidence Regional Collaboration – Fleet Management Project Progress Summary Duncan Kinnaird Project Lead.
Measure of Academic Progress
April 25, Welcome (Rebecca Marshall) 2. Review minutes (March 7, 2012 Meeting)(Rebecca Marshall) 3. Accident reports(Rebecca Marshall) 4. Plan.
Cat Muscles Test 2013/2014. Head end tail abdomen.
Connecticut’s Experience as an Early Adopter of the Medicaid Expansion Connecticut State Representative Elizabeth B. Ritter Progressive States Network.
Review of EC-PORS activities since EC- PORS4: Research Thomas Jung Alfred Wegener Institute Helmholtz Centre for Polar and Marine Research Germany.
PHYS707: Special Topics C++ Lectures Lecture 2. Summary of Today’s lecture: 1.More data types 2.Flow control (if-else, while, do-while, for) 3.Brief introduction.
General Fund Budget Calendar Review Niagara Falls City School District Budget Cynthia Bianco Superintendent of Schools Tim Hyland Rebecca Holody.
Lim Sei cK.  16 th September 2013 – 7 th December 2013  ACADEMIC WEEK 1 – WEEK 11  9 th December 2013 – 4 th January 2014  BRUNEI STUDENT HOLIDAY.
Tribunal User Group 25 th March Tribunal Activity 2013/2014 as at 24 March 2014 Benet Brodie, Secretary 25 March 2014.
Community Services and Health Industry Skills Council Revised Project Timelines January 2014.
CCRS Implementation Team Meeting #4 The Journey Continues! April/May, 2013.
DETA Context:Revision 3 of the 1958 Agreement Why:Modernization (replacing paperwork) Priority:Exchange of UN Regulation No. 0 Type Approvals (IWVTA) Add-on:Unique.
Lilian Blot CORE ELEMENTS SELECTION & FUNCTIONS Lecture 3 Autumn 2014 TPOP 1.
Agenzia Lucana di Sviluppo e di Innovazione in Agricoltura A.L.S.I.A. A.A.S.D.PANTANELLO BIOREM LIFE11 ENV/IT/ Meeting Metaponto, 25 July 2013.
Weekly Attendance by Class w/e 6 th September 2013.
Event, March th 2013 Pressure. Event, March th 2013 Temperature.
Analysing 2014 Results Using pupil performance data for judging schools Schools are judged on the following performance indicators: VA (Value Added) APS.
TEACHER EVALUATION UPDATE Center Grove Community School Corporation.
Student Growth Measures Category “B” Teachers VENDOR (STAR)
A primer on DFDI, the MARVELS optical implementation, and pipeline flow MARVELS Science Review Brian Lee, June 21, 2011.
LHCOPN and LHCONE Meeting Welcome! Istituto Nazionale di Fisica Nucleare LHC OPN/ONE INFN Headquarter Rome, / 4 / 2014 S.Zani.
Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building CleAnsed: LIFE12 ENV/IT/ Expected.
Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building CleAnsed: LIFE12 ENV/IT/ Expected.
INNOVATIVE INTEGRATED METHODOLOGY FOR THE USE OF DECONTAMINATED RIVER SEDIMENTS IN ROAD CONSTRUCTION Progress Meeting November 26 th 2014 Prof. Ing. Massimo.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
Optical and Atomic Force Microscopy for analysis of wet sediments from the Canale dei Navicelli LIFE 12 ENV IT Cleansed.
CLEANSED: LIFE12 ENV/IT/ C. MACCI*, G. MASCIANDARO*, S. DONI*, C. GARCIA**, M.T. HERNANDEZ**, C. P. ROCCHIO***, M. LOSA*** *CNR, Institute of Ecosystem.
Rules  If you answer a question with “yes”, then walk across the room.  If you answer a question with “no”, stay where you are.  Note the number of.
PLANNING FOR THE CIS WORK PROGRAMME PART 3 – NEW AND EMERGING ACTIVITIES SEDIMENTS WFD SCG May 2006.
The landfarming treatment consisted in the periodically turning over of the AGRIPORT decontaminated sediments inside each containers Homogenization of.
Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building Expected start date: 01/10/2013Expected.
INNOVATIVE INTEGRATED METHODOLOGY FOR THE USE OF DECONTAMINATED RIVER SEDIMENTS IN ROAD CONSTRUCTION Progress Meeting Pisa, February 25 th 2016 “CLEANSED.
Isolation and characterization of a bacterial consortium capable to degrade the saturated fraction of the mineral oil. Giovanna Siracusa1, Simona Di Gregorio1,
ENV 345 Innovative Education- -snaptutorial.com
מפגש עם אנשי משרד החינוך
Wastewater treatment process design
Calculus W 11 April 2012.
Calculus W 18 April 2012.
Presentation transcript:

Progetto CLEANSED PROGRESS MEETING April LIFE12 ENV/IT/ S.p.A. Navicelli di Pisa

LIFE12 ENV/IT/ Progetto CLEANSED B. Implementation action B1. Dredging, analysis and charaterization of contaminated sediments B2. Sediment treatment

LIFE12 ENV/IT/ Campione n.1 (Argilloso H. contaminazione) Campione n.2 (Limoso – Argilloso M. Contaminazione) Campione n.3 (Limoso – Sabbioso M. Contaminazione) Campione n.4 (Sabbioso – Limoso L. contaminazione) Sito di Dragaggio Vasca n. 1 S.p.A. Navicelli di Pisa B1. Dredging, analysis and charaterization of contaminated sediments

LIFE12 ENV/IT/ Progetto CLEANSED Partecipazione all’evento EcoCity Expo 2013 PISA – Palazzo dei Congressi Novembre 2013

LIFE12 ENV/IT/ Progetto CLEANSED B1. Dredging, analysis and charaterization of contaminated sediments

LIFE12 ENV/IT/ Progetto CLEANSED B1. Dredging, analysis and charaterization of contaminated sediments

B2. Sediment treatment LIFE12 ENV/IT/ Progetto CLEANSED

That’s all, Folks!!! LIFE12 ENV/IT/ Progetto CLEANSED S.p.A. Navicelli di Pisa