Registry system data exchange General design requirements Pre-sessional Consultations on Registries 19 October 2002 New Delhi, India UNFCCC secretariat.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Chapter 10 Encryption: A Matter of Trust. Awad –Electronic Commerce 1/e © 2002 Prentice Hall 2 OBJECTIVES What is Encryption? Basic Cryptographic Algorithm.
Assurance Services Independent professional services that “improve the quality of information, or its context, for decision makers” Assurance service encompass.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
INTERNAL CONTROLS.
2) Long term (1/4) UNJSPF : Evolution of Actuarial situation since
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Knowledge Dietary Managers Association 1 DMA Certification Exam Blueprint and Curriculum Development.
1 Welcome Safety Regulatory Function Handbook April 2006.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Session 9 – Government-to-government dispute settlement procedures WTO Dispute Settlement Understanding Vesile Kulaçoglu, WTO Secretariat Dar es Salaam,
The Managing Authority –Keystone of the Control System
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
HIV Drug Resistance Training
1 Ignacio de Castro WIPO Arbitration and Mediation Center Solving Disputes: The Services of the WIPO Arbitration and Mediation Center WIPO-INSME Training.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
List and Search Grants Chapter 2. List and Search Grants 2-2 Objectives Understand the option My Grants List Grant Screen Viewing a Grant Understand the.
Digital Signatures in State of Tennessee Pam Roberts Finance & Administration Office for Information Resources Planning, Research & Development.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
Addition Facts
Computer Security CIS326 Dr Rachel Shipsey.
1 The Aon approach to reform May 2007 Nigel Roberts.
NATIONAL SYSTEMS UNDER ARTICLE 5 OF THE KYOTO PROTOCOL EC workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment.
Communicating over the Network
How To Use OPAC.
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
EMS Checklist (ISO model)
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Chapter 13 Overall Audit Plan and Audit Program
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
CPSS-IOSCO Principles for FMIs and TM Assessments Ana Giraldo
Checking & Corrective Action
1 Functional specification: data exchange standards Pre-sessional consultations on registries 2 June 2003 Bonn, Germany Andrew Howard UNFCCC secretariat.
Environmental Management Systems Refresher
Digital Futures International Forum - Tuesday 18th September 1 Digital Futures International Forum The Digitisation Standard: Back & Forth Stephen Clarke.
How to commence the IT Modernization Process?
1 Development and Transfer of Technologies under the UNFCCC The Marrakech Accords & Beyond Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat.
CONSULTATION AND THE SAFEGUARD POLICIES ECA Safeguard Training for PIUs, May 17, 2011.
Addition 1’s to 20.
25 seconds left…...
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
Week 1.
We will resume in: 25 Minutes.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
1 Andrew Howard UNFCCC secretariat International transaction log Roles and functions Intersessional consultations on.
1 Andrew Howard UNFCCC secretariat International transaction log Checks, public information and modalities Intersessional.
GRETA GREENHOUSE GAS REGISTRY FOR EMISSIONS TRADING ARRANGEMENTS Overview of the UNFCCC registries Workshop on China’s National administration and approval.
Draft Operational procedures for registry systems 09 November 2004 Bonn, Germany Technical Breakout Group.
1 Andrew Howard UNFCCC secretariat Registry systems and transaction types Consultations on registry systems prior to.
1 Andrew Howard UNFCCC secretariat Registry systems and the data exchange standards Intersessional consultations on registry.
Accounting of Emissions and Assigned Amount under the Kyoto Protocol Clare Breidenich UNFCCC Consultant.
The United Kingdom’s Experience and Perspective The Way Forward on Registries Martin Hession International Climate Policy DEFRA UK.
1 Transaction log and the data exchange standards Introduction Pre-sessional consultations on registries 2 June 2003 Bonn, Germany Andrew Howard UNFCCC.
Data Exchange Standards in support of transaction processes 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.
1 Andrew Howard UNFCCC secretariat International transaction log Transaction checks Intersessional consultations on registry.
UNFCCC secretariat Session 4 Meeting eligibility requirements First UNFCCC workshop on implementation of Article 6 projects under the Kyoto.
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
Possible elements of the technical standards Pre-sessional consultations on registries Bonn, 2-3 June 2002 Andrew Howard UNFCCC secretariat
Setting the scene: A framework of technical standards for data exchange Pre-sessional consultations on registries October 2002 New Delhi, India UNFCCC.
Introduction to registry systems
Eligibility issues and joint implementation
Joint implementation and eligibility requirements
Presentation transcript:

Registry system data exchange General design requirements Pre-sessional Consultations on Registries 19 October 2002 New Delhi, India UNFCCC secretariat Geoff Sinclair Consultant

2 Purpose of this presentation Explain approach taken in possible general design requirements in the annex Raise some key issues & questions

3 Overall approach to general design requirements Not detailed design –Define the ‘what’ before the ‘how’ –‘How’ can be left to technical/IT specialists –Allow flexibility of solutions Read with decision 19/CP.7 Concerned with ‘physical’ issuance, transfer and retirement of units, NOT commercial transactions/contracts or forward trades

4 Structure of Annex 1 I.Purpose II.Principles III.Interfaces for data exchange IV.Requirements of registries and transaction log for data exchange

5 II. Principles (para 4) A guide to technical choices Provides guidance for ongoing technical evolution Very high level

6 Principles (current draft) Effective facilitation of mechanisms Accuracy of data and its exchange Transparency and auditability of transaction processes Transparency of non-confidential information Efficiency in transaction procedures Security of data and its exchange Independent design of individual registry systems

7 III. Interface between registry systems Common ‘language’ between registries –Makes data exchange possible

8 Interface between registry systems What messages and in what sequence? Registry A Transaction log Registry B What needs to happen associated with message sequence? (transaction rules)

9 Message sequences for… Relating to transactions: –Issuance –Internal transfer (CDM registry pending, cancellation, retirement) –Registry-registry transfer –Carry-over of units to subsequent C.P. ‘Housekeeping’ –Reconciliation of data –Connection tests –Transaction log online/offline status Message content as per para. 6

10 Message sequences (paras 5-9) ‘Grammatical structure’ for registry-registry communications Outline types of message sequences needed, not exact formulation Steers away from stipulating particular software languages/technologies

11 Transaction rules (paras 10-12) Units can’t be subject to 2 operations at once –Maintain integrity of transfer process Must be defined point where transfer final Response times not specified at level of general design requirements –Can be specified later

12 IV. Registry system requirements What data to be transferred? (number elements) Registry A Transaction log Registry B What infrastructure requirements? Network topography Reliability (security, testing, downtime) Transaction log

13 Number elements (paras 13-15) Common basic reference information –Tracking and transparency Elements driven by Kyoto Protocol mechanisms –Basic outline of minimum content of serial, account and transaction numbers specified –Registries can associate more information with serial number if wanted

14 Number elements - issues Serial numbers for ERUs: should they distinguish between track 1 and track 2? Destination party identifier in transaction number?

15 Topography option 1: peer-to-peer Registry Transaction log Registry

16 Peer-to-peer topography (continued) 39 Annex I Parties  –861 connections –41 copies of every security key, replaced regularly (every three months depending on policy and level of encryption) Increased security risks Increased risk of message ‘getting lost’ Higher costs

17 Topography option 2: hub Registry Transaction log Registry

18 Hub topography (continued) Fewer connections Lower security risk Messages less likely to get ‘lost’ Likely lower costs Hub does not control content nor timing of messages

19 Security and availability (paras 17-19) Security critical ‘network good’ –Breach in one part can effect all other parts At general requirements level: –Encryption: not readable by others –Authentication: uniquely identified** –Non-repudiation: single full and final record –Integrity: data not modified –Auditability: full audit trail Secure data management within registry systems Minimum downtime

20 **Authentication: registry or individual? Important issue for ongoing design Could require either: –Organisation/registry to be identified; or –Individual using that system to be identified Individual identification higher cost but lower risk Some countries require individual authentication for actions to have legal effect of a signature

21 Transaction log information (para 21) Outlines what information transaction log must collect to do checks Could be addressed in general requirements OR transaction log specification

22 Summary: Issues to address now Are the principles appropriately worded and comprehensive? Serial numbers: differentiate ERU track 1 vs 2? Transaction numbers: include destination party identifier? Peer-to-peer or hub network topology? Individual or corporate authentication? Information required by transaction log: here or in TL specification?