EXAMPLES OF DRAFT CSC CORE REQUIREMENTS. ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 2 Reading.

Slides:



Advertisements
Similar presentations
Welcome to Site Management Amy Thompson. Agenda I.Foundation Introductions Setting the Session Agenda II.Site Management Principles III.Site Management.
Advertisements

Integrating the NASP Practice Model Into Presentations: Resource Slides Referencing the NASP Practice Model in professional development presentations helps.
Module N° 4 – ICAO SSP framework
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
Elective module 3 Geospatial environmental management
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
EXAMPLES OF DRAFT SITING REQUIREMENTS. ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 2 Siting.
FINDING THE BALANCE A presentation of the draft CSC Responsible Aggregate Standard.
Environmental Management System Implementation
[Organisation’s Title] Environmental Management System
1 Service Providers Capacity Assessment Framework Presentation to the Service Delivery Advisory Group August 28, 2008.
NORMAPME ISO User Guide for European SMEs The essence of.
DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
SOCIAL POLICY GUIDELINES FOR MINING SECTOR IN AFGHANISTAN Harjot Kaur Senior Social Development Advisor, Ministry of Mines.
Environmental Management Systems An Overview With Practical Applications.
Fermilab Environmental Management System (EMS)
MODULE 3 THE ENVIRONMENTAL PRINCIPLES Session 2: Principle 8
ENVIRONMENTAL MANAGEMENT PLAN
Environmental Management Systems Refresher
Expanded Version of COSO a presentation by Steve Wadleigh Expanded Version of COSO a presentation by Steve Wadleigh Standards for Internal Control in the.
Social and Environmental Purchasing Guidelines Antigua, Guatemala, April 5, 2002 STARBUCKS COFFEE COMPANY MARY WILLIAMS, SVP, COFFEE.
SAFA- IFAC Regional SMP Forum
Control environment and control activities. Day II Session III and IV.
Definition of Ecotourism  Ecotourism Kenya defines Ecotourism as, “the involvement of travelers in environmental conservation practices that address.
1 CHCOHS312A Follow safety procedures for direct care work.
Defining Responsible Forest Management FSC Forest Certification Standards Defining Responsible Forest Management Version:
ISO Richard Welford CSR Asia © CSR Asia 2011.
Corporate Social Responsibility- do we need a Statutory Instrument? Presented to the Zambia Alternative Mining Indaba conference- July 17, 2013 Sombo Chunda,
Environmental Impact Assessment (EIA): Overview
EFFECTING CULTURAL CHANGE IN RESEARCH ETHICS AND INTEGRITY Encouraging a culture of research integrity Andrew C. Rawnsley.
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
Ship Recycling Facility Management System IMO Guideline A.962
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Connecticut Department of Public Health Healthy Connecticut 2020 The CT State Health Improvement Planning Process Background,
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Health and Safety Policy
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
At the last Steering Team meeting… Goals (Rule-level) EPS (Measurable and Reportable) Natural Resources Human/Cultural Environment Administrative Avoid,
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
M & E TOOLKIT Jennifer Bogle 11 November 2014 Household Water Treatment and Water Safety Plans International and Regional Landscape.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Sample Codes of Ethics in Adventure Tourism
Pollution Prevention and Environmental Essentials Conference – 2002 How An EMS Can Enhance Your P2 Program Presented by Mike Garcia.
Theme 2 Developing MPA networks Particular thanks to: Theme 2 Concurrent Session Rapporteurs, Dan Laffoley, Gilly Llewellyn G E E L O N G A U S T R A L.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
OSHA Safety and Health Program Management Guidelines
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
Presentation By L. M. Baird And Scottish Health Council Research & Public Involvement Knowledge Exchange Event 12 th March 2015.
Overview of Good Regulatory Practice Kent Shigetomi Office of the U.S. Trade Representative.
Navigation Guide Major Projects – Aboriginal Partnerships.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Alice Pedretti, Project Manager Effective management of complaints for companies Lessons learned from the Management of Complaints Assessment Tool Amsterdam,
NATIONAL REDD+ SECRETARIAT
Lockheed Martin Canada’s SMB Mentoring Program
EMS Checklist (ISO model)
World Bank project example
Overview of Good Regulatory Practice
WELCOME TO MELSAFE. INTERNAL AUDIT SERVICES OUR INTERNAL AUDIT SERVICES HELP FIRMS DEVELOP A CLEAR PICTURE OF THE INTERNAL AUDIT'S STRATEGIC ROLE WITHIN.
Presentation transcript:

EXAMPLES OF DRAFT CSC CORE REQUIREMENTS

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 2 Reading CSC’s draft Responsible Aggregate Standard The draft CSC Responsible Aggregate Standard consists of: Principles High-level goals that provide an overall framework for the Standards Core Requirements The range of actions or outcomes required to comply with a particular principle Performance Verifiers A non-exhaustive list of examples of the type of evidence auditors would look for when assessing compliance against a core requirement Appendices and SOPs Important information and guidance related to the Core Requirements. The Standards should be read only in combination with the Appendices and SOPs

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 3 Draft Principles Principle 1: Compliance with laws Aggregate operations meet or exceed the requirements of all applicable laws and legal instruments in the jurisdictions in which they occur. Principle 2: Community notification, consultation and participation Aggregate operations demonstrate proactive efforts, throughout the operation’s siting, planning, operation and rehabilitation, to engage affected communities and other stakeholders in transparent consultations designed to help address public interests and concerns. Principle 3: Respect for Aboriginal Peoples’ rights and culture The legal, customary and asserted rights of Aboriginal peoples to own, use and manage their lands, territories, and resources is recognized and respected. Principle 4: Benefits to communities and employees Applicants act in good faith to maintain and enhance the social and economic well- being of communities and employees.

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 4 Draft Principles cont’d Principle 5: Site stewardship and impacts to the environment, water and human health Aggregate extraction activities – their identification, siting, footprint design, operation, rehabilitation and other ecological initiatives – are designed to protect the environment and its associated values, water resources, and soils, and to protect unique and fragile ecosystems and landscapes, and by so doing, maintain the ecological functions and integrity of the impacted area and its connections to the regional landscape. Principle 6: Resource efficiency and conservation The efficient use and conservation of aggregates and other resources is achieved by putting them to their highest valued use, maximizing the use of recycled content by looking for alternatives to using high quantities of virgin aggregate and, in the medium to long term, developing optimal transportation networks that factor in both financial and environmental costs. Principle 7: Traceability Systems are in place to track aggregate from certified operations through to its intended use.

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 5 Draft Core Requirements NOT an inclusive list Examples of the types of draft Core Requirements (CR) CSC is seeking feedback on are: Principle 1 CRs 1.2 & 1.3: Certified and Candidate sites have a good track record of complying with laws and immediately addressing instances of non-compliance CR 1.4: Certified and Candidate sites make a public commitment to the Principles of CSC Principle 2 CR 2.1: Candidate and Certified sites develop and implement an open and transparent public engagement strategy that; Is inclusive & transparent in communications (i.e. engages the diversity of views) Covers the lifecycle of the operation Seeks to address & resolve community concerns on an ongoing basis (recognizing that not all differences can be reconciled in all situations) CR 2.4: Certified sites deploy a public engagement strategy that Sets a targeted end-date for extraction Reviews and revise progress towards their targeted extraction date Communicates this progress at least once every five years Sets a firm final extraction date when the site enters the final 20 years of operation. Sites are allowed one extension to this date as negotiated with the community.

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 6 Core Requirements NOT an inclusive list Cont’d Examples of the types of draft Core Requirements (CR) CSC is seeking feedback on are: Principle 3 CRs 3.1 & 3.2: Certified sites meaningfully engage with Aboriginal communities by: Establishing a mechanism to engage affected Aboriginal communities as early as possible to solicit involvement & input (how formal the mechanism is can vary with local context, degree of Aboriginal interest, etc) Sharing economic benefits of aggregate extraction with local Aboriginal communities (jobs, training, etc) CR 3.4: Candidate sites meaningfully engage with Aboriginal communities by pursuing an agreement with interested and affected Aboriginal communities that seeks to address their interests and concerns. Where an agreement cannot be reached the applicant makes periodic efforts to re-engage the community to reach agreement

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 7 Core Requirements NOT an inclusive list Cont’d Examples of the types of draft Core Requirements (CR) CSC is seeking feedback on are: Principle 4 CRs 4.1 & 4.3: Certified sites act as good neighbours and employers by: Whenever possible hiring locally and purchasing materials, goods or services locally Offering wages and benefits comparable to those in the region and industry Meeting or exceeding all applicable health and safety laws CR 4.2: Candidate and Certified sites support host communities through activities like event sponsorship, employee volunteer programs or host community agreements

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 8 Core Requirements NOT an inclusive list Cont’d Examples of the types of draft Core Requirements (CR) CSC is seeking feedback on are: Principle 5 CR 5.1: Candidate sites identify and mitigate against adverse environmental impacts by: Working with public agencies and the community to identify and scope studies that may be required to prevent or minimise adverse environmental impacts Completing these studies before major commitments to pursue the site are made and soliciting and addressing input from public agencies and the community throughout the development of these studies Developing a plan to either implement an Environmental Management System (EMS) or adopting and tailoring their operation to the CSC Standard Operating Procedures (SOPs) to avoid these impacts or to reduce them to an acceptable level CR 5.2: Certified sites identify and mitigate against adverse environmental impacts by: Employing and monitoring an Environmental Management System (EMS) or adopting and tailoring their operation to the CSC Standard Operating Procedures (SOPs) to avoid these impacts or reduce them to an acceptable level Publicly communicating the results of monitoring efforts Revising mitigation approaches using continual improvement and adaptive management when monitoring revels they were unsuccessful

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 9 Core Requirements NOT an inclusive list Cont’d Examples of the types of draft Core Requirements (CR) CSC is seeking feedback on are: Principle 5 CR 5.4: Certified and Candidate sites develop rehabilitation plans that: Seek to maximize the rehabilitated area and minimize disturbed area at all times Are shared with community stakeholders and consideration given to periodically adjusting to meet shifting social contexts Demonstrate financial provisions are available for the full costs of rehabilitation. Target completion of all final rehabilitation within 2 years of final operations

ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 10 Core Requirements NOT an inclusive list Cont’d Examples of the types of draft Core Requirements (CR) CSC is seeking feedback on are: Principle 6 CR 6.1: Candidate and Certified sites promote the efficient use and conservation of operational resources by developing and implementing a Resource Efficiency Strategy that: Identifies and sets a baseline for key resources consumed and wastes produced Gives consideration to input solicited from local stakeholders Sets targets to maintain or improve, where possible, the efficient use of resources through a philosophy of continual improvement Measures, records and publicly reports on progress towards meeting those targets Reviews and evaluates those targets at a minimum of every five years CR 6.4: Candidate and Certified sites work within their sphere of influence to overcome barriers to resource efficiency (E.g. advocate through association to remove municipal procurement policies that require virgin materials Principle 7 CR 7.1: Certified sites have in place systems to track aggregate from the certified operation to its intended use