CASE STUDIES ON THE USE OF ENVIRONMENTAL CLAMSHELL BUCKETS FOR REMEDIATION OF CONTAMINATED SEDIMENTS Application of Environmental Dredging Tips Lessons.

Slides:



Advertisements
Similar presentations
Advanced Acoustical Modeling Tools for ESME
Advertisements

Operations Management Maintenance and Reliability Chapter 17
Making Molar Solutions
OMAF Nitrogen Verification Project Crop Technology Team 200 sites across Ontario (70 Hort) 3 years - 4 samples per year 2,400 soil samples!
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
1 Transport and Station Observations and Recommendations January 26, 2005 TOMA – Diesel Fuel Marketers Seminar Nashville, TN TRANSPORTATION OF ULSD MAP.
ITU-T Technical Session on EMF
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
Duke Power Clean Smokestacks & Mercury Efforts April, 2004.
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Dredging.
Ex Situ Treatments Following Dredging and/or Excavation MethodComments DewateringExtraction of water from removed sediment Particle separationSelective.
Mapping Our World Goals: Differentiate between latitude and longitude.
Proprietary and Confidential P0 Resource Leveling Made Easy Fall 2001 NOTICE: Proprietary and Confidential This material is proprietary to marchFIRST.
Good Loading Practices Carrier Transicold and PLM Trailer Leasing.
PORT OF LAKE CHARLES. CITY DOCKS 11 USAID/USDA approved transit sheds 13 Ship Berths 1.3 million square feet waterfront storage 600,000 square feet of.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Jim Thompson, Eric Anderson, & Rob Austin NC State University, Department of Soil Science Jim Thompson, Eric Anderson, & Rob Austin NC State University,
Sustainable agricultural systems The economics of improving water quality in the Gordonstone Creek Catchment Fred Chudleigh DPI &F James Gaffney CQU Chris.
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Fundamental Managerial Accounting Concepts
PART 75 SPAN & RANGE Manuel J Oliva Clean Air Markets Division
Toulouse Blagnac campaign test results By DSNA
Understanding p-values Annie Herbert Medical Statistician Research and Development Support Unit
Review Week 6 CVL 305A.
NYS Department of Environmental Conservation Update on the Niagara River U.S. RAP Niagara River Remedial Action Plan Implementers Session April 10, 2013.
Hingham Public Schools Preliminary Budget Information FY 2015.
Converting Depth-Cost Output from the Corps GL-SAND model to SVM Input.
CAP CAVSARP: Clearwater Facility. CAP (Central Arizona Project) In 1980, Arizona overdraft: 2.5 million acre feet year (afy) groundwater deficit due to.
Fundamentals of Cost Analysis for Decision Making
Discussion of Lower Passaic Cleanup Alternatives Presentation to the Fair Lawn Environmental Commission April 3,
Distributed Computing 9. Sorting - a lower bound on bit complexity Shmuel Zaks ©
2014 Chip Seal Training Contract Administration Issues.
Update on the Remedial Action at the Wood Hollow Training Area MRS November 6, 2014 Jeff Fitzmayer Parsons.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Treatment
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
Extensive culture: low intensity aquaculture providing only small increases over natural productivity. Extensive fish culture systems have low stocking.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Grand Calumet River/Indiana Harbor Canal Feasibility Study
Cleaning up the Hudson Andrew Brown. The Hudson River Official Source- Lake Tear in the Clouds in Adirondack Mountains Official Source- Lake Tear in the.
Toxics Management Plans Ecology Review Principles.
Dredging Engineering: Building & Maintaining Underwater Highways
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
Where’s My Material? Appropriate Planning for Cap and Habitat Restoration Material Quantities Presented by Paul LaRosa, P.E., John Verduin, P.E., and Ram.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
WHAT IS RAFS? Organized in 2004 to Assist Rural Alaskan Communities Manage Their Bulk Fuel Facilities. Not-for-Profit Corporation. Initial funding provided.
Kwasi Badu-Tweneboah, Ph.D., P.E. – Geosyntec Consultants Jacksonville, Florida, USA Kenneth W. Cargill, P.E. – KW Cargill, P.A.. Punta Gorda, Florida,
Dredged Material Separation Plan Execution in New York Harbor Deepening Projects Jeff Snyder SeaVision Underwater Solutions.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
SIDE SCAN Theory and Operation
Cleaning up the Lower Fox River Greg Hill, Wisconsin DNR Winnebago Project University of Wisconsin Oshkosh, May 23, 2008.
SIDE SCAN Theory and Operation
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

CASE STUDIES ON THE USE OF ENVIRONMENTAL CLAMSHELL BUCKETS FOR REMEDIATION OF CONTAMINATED SEDIMENTS Application of Environmental Dredging Tips Lessons learned from more than 10 years of completing dredging projects with environmental clamshell buckets Presented by Darrell Nicholas, P. E. Cable Arm Professional Services

Clamshell Advantages - Rapid mobilization with usually lower costs - Equipment and labor readily available in most markets - Handles deep water greater than 40 feet - Some rock and debris handling capability - Much lower water treatment costs Clamshell Disadvantages - Lower production rates usually vs. cutterhead - Need for onshore unloading/transfer facilities, trucks - Loss of volatile organic compounds from open barges - Need for secondary spill containment at transfer points Cable Arm, Inc. June 2005 – p2

Comparison of Water Treatment Needs Environmental Clamshell vs. Cutterhead Cutterhead dredging typically produces 4 to 14 times more water to be treated than clamshell dredging in environmental applications. Cable Arm, Inc. June 2005 – p3

ENVIRONMENTAL CLAMSHELL BUCKET FEATURES

St. Lawrence River Remediation Project April – November 2001 Contaminant – PCBs Concentration Range: 1 to >1000 ppm Area Remediated: 22 acres Volume Removed: 86,400 cubic yds Water Depth: 0 to 30 ft Current: 0 to >4 ft per second Tidal range: 0 to 3 ft (ship traffic) Secondary Turbidity Control: Sheetpile Obstructions: Cobbles, dredge spoil, driftwood, old dock Operations Software: WINOPS Clean-up Goal: 1 ppm Cable Arm, Inc. June 2005 – p5

St. Lawrence River Remediation Project Removal of 86,600 cy of sediment containing 20,200 lbs of PCBs 98.6% reduction in PCB contaminant levels 4% of the area remained above 10 ppm and was capped. Source: SLRPP Completion Report, Bechtel, Cable Arm, Inc. June 2005 – p6

St. Lawrence River Remediation Project – Lessons Learned Source: SLRPP Completion Report, Bechtel, Sections on 25 to 50 ft centers aren’t good enough. Sonar depth positioning wasn’t fast enough to provide on-the-fly updates in production mode. Need a survey point within 1 bucket width of every bite. Cable Arm, Inc. June 2005 – p7

St. Lawrence River Remediation Project – Lessons Learned Accurate starting elevation essential. Real time xy and z positioning required under production conditions. Update bottom elevations as material is removed. Real time operator display of current bucket depth, current bottom depth, and target depth needed. Cable Arm, Inc. June 2005 – p8

Lessons Learned - Contracting Make sure your contract rewards the right things Retain the ability to reject a bid if the contractor cannot demonstrate 100% compliance with the specifications. Don’t be afraid to use a hybrid contracting system that mixes lump sum items with time and material items. Identify and spell out testing and reporting requirements. Provide separate pay items for health and safety support and quality assurance work Don’t under estimate budget and schedule impacts for interfacing with the public and regulators. Include a pay item for contractor support with these issues. Provide a start-up period for training and working out the kinks. Require dry runs and trials of equipment before starting production, particularly with complicated procedures and/or difficult interfaces. Cable Arm, Inc. June 2005 – p9

White Lake, Michigan – Summer 2003 Contaminant – PCBs Concentration Range: 1 to 150 ppm Area Remediated: 2 acres Volume Removed: 8,000 cubic yds Water Depth: 40 to 60 ft Current: negligible Tidal range: negligible Secondary Turbidity Control: Floating cell w/ short curtain skirt Obstructions: Timber Operations Software: Clamvision – 1 st field application Clean-up Goal: 2 ppm Cable Arm, Inc. June 2005 – p10

White Lake, Michigan – Summer 2003

White Lake, Michigan - Summer 2003 Lesson Learned and Applied – Obtain a highly accurate survey with no more than a bucket width spacing between sections. Cable Arm, Inc. June 2005 – p12

White Lake, Michigan - Summer 2003 Lesson Learned and Applied – Evaluate Survey Accuracy & Precision Before Dredging - Provided independent QA/QC of surveys for precision and accuracy. - Performed 3 independent surveys on 3 different days. - Evaluated 15 profiles. All profiles fell within an 8-inch vertical band. Cable Arm, Inc. June 2005 – p13

White Lake, Michigan - Summer 2003 Lesson Learned and Applied – Update bottom elevations as dredging progresses Cable Arm, Inc. June 2005 – p14

Lesson Learned and Applied Correlate turbidity measurements with operational practices Result - 100% Compliance with Turbidity Limits Cable Arm, Inc. June 2005 – p15

White Lake, Michigan - Summer 2003 A very simple pie chart – 100% successfully remediated Apparently the first clean closure of a site with PCB contaminated sediment in the Great Lakes region. Cable Arm, Inc. June 2005 – p16

Contaminant – Coal tar, creosote Navigational with environmental handling of sediments Volume Removed: 5,000 cubic yds Water Depth: 15 to 45 ft Current: reversible, up to 3 knots Tidal range: 3 ft Secondary Turbidity Control: Floating cell w/ short curtain skirt Obstructions: Poles, tires, etc. Operations Software: Clamvision Clean-up Goal: Reach target depth Cable Arm, Inc. June 2005 – p17 Jacksonville, Florida – Summer 2004

Jacksonville, Florida - Summer 2004

Jacksonville, Florida – Summer 2004 Lesson Learned and Applied – Use wash tank, drip pan, dredge cell, and underwater spill containment to reduce sediment resuspension.

Jacksonville, Florida – Summer 2004 Lesson Learned and Applied - Work from high to low where possible. Cable Arm, Inc. June 2005 – p20

Lesson Learned and Applied Perform Quality Control Checks on All Survey Data No dredging has taken place, yet comparing two independent pre-dredge surveys indicates more than one ft of cut or fill in portions of the site!! The alignment of high and low spots was found to be caused by a failure to adjust for sonar latency on one survey. In flat areas, this failure made little difference. On steep side slopes, the difference was significant. Always make and compare at least two surveys. Cable Arm, Inc. June 2005 – p21

Lesson Learned and Applied – Be Prepared to Handle Rock, Debris, and Excess Water on Every Job Cable Arm, Inc. June 2005 – p22

Contaminant – Coal tar Removal of up to 9 ft of contaminated sediment Volume Removed: 4,000 cubic yds Water Depth: 15 to 45 ft Current: Less than 1 fps Tidal range: 5 ft Secondary Turbidity Control: Silt curtain Obstructions: Scrap metal Operations Software: Clamvision Clean-up Goal: Reach target depth Cable Arm, Inc. June 2005 – p23 Hudson River – Fall 2004

Cable Arm, Inc. June 2005 – p24

Lesson Learned and Applied - Triple check coordinate transforms, datum conversions, and tide settings in the software; these are the most frequent sources of errors. Cable Arm, Inc. June 2005 – p25

Lesson Learned and Applied - Verification by Independent Methods Builds Confidence in Regulators and Public. Cable Arm, Inc. June 2005 – p26

Contaminant – PCBs Concentration – 1 to <50 ppm Approx. 1 acre site Removal of 14 inches of contaminated sediment Volume Removed: <2,000 cubic yds Water Depth: 0 to 20 ft Current: negligible Tidal range: 4 ft Secondary Turbidity Control: Silt curtain Obstructions: Cobbles, boulders, driftwood Operations Software: Clamvision Clean-up Goal: 1 ppm Cable Arm, Inc. June 2005 – p27 Sherman Reservoir, Massachusetts – Fall 2004

Lesson Learned and Applied: Precision dredging requires a crane in top mechanical condition. Precision instrumentation can be wasted on a poorly functioning crane or uncooperative operator. Cable Arm, Inc. June 2005 – p28

Lesson Learned and Applied Have a plan for handling debris and obstructions. Cable Arm, Inc. June 2005 – p29

Lesson Learned and Applied Use a differential global positioning system, bucket and crane instrumentation, tide gauge, and dredging software to track bucket location in 3-D. Don’t swing across clean areas. Cable Arm, Inc. June 2005 – p30

Lesson Learned and Applied For comparability, sample & test sediments using the same methods before & after dredging. Determine sampling locations & depths precisely, before & after. Unless comparable methods are used in the same x-y location, dredging effectiveness cannot be accurately evaluated. Cable Arm, Inc. June 2005 – p31

Lessons Learned and Applied Provide time in the project schedule to train crane operators to use new instrumentation and procedures for precision dredging. Cable Arm, Inc. June 2005 – p32

Lesson Learned and Applied Involve the crew. Track project status on a real-time basis and provide daily updates. Provide feedback that includes both successes and areas for improvement. Establish realistic performance expectations. Cable Arm, Inc. June 2005 – p33

Sherman Reservoir – Fall 2004 Another Site 100% Successfully Remediated Applying the lessons learned from past environmental dredging experience can produce results that are easy to explain to your clients, to the public and to the regulators. Cable Arm, Inc. June 2005 – p34

Structure your contract to procure the right equipment operated by well-qualified personnel using the correct techniques by rewarding safe, efficient, high quality performance that achieves your well-defined project goals. Cable Arm, Inc. June 2005 – p35 To Summarize the Lessons Learned