PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 1 03/03/200 0 PSB Recombination Layout Present Kickers & Septa BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10.

Slides:



Advertisements
Similar presentations
Lecture 4 Operational Amplifiers—Non-ideal behavior
Advertisements

Matrices and Elementary Row Operation
TRADING IN CAMRILLA As u know there are eight levels in camrilla equation We assume it as four resistance & four support levels RULE NO.1 Never trade in.
Warunki w sieciach liniowych
Genes and Evolution Comparative Genome Structure and Evolution Synteny- comparison of chromosome order in related species.
Kicker SloW (KSW) magnets and Generators PSB 160 MeV H - injection L. Feliciano TE/ABT.
Claim: You should buy a Volkswagen Squareback. because its economical because its reliable because its roomy.
Testing “Multiple Conditions” with Decision Table Technique
Physics 2025 : Analog Circuits / Digital Circuits Purpose of This Minilab Gain some basic experience in reading and building electronic circuits. Test.
Physics 2102 Gabriela González Physics 2102 Electric Potential.
IK Slide 0 First look at the WCM data from July 2012 September 6 th 2012 Ian Kirkman.
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
WMO SPICE Guthega Dam (Australia) Site Configuration Update Oct 10 th, 2012 Information from Shane Bilish Prepared by Rodica Nitu.
The Inverting Mode Op-Amp. What is the Inverting Mode ? The op-amp can be connected up in various ways or modes. What it does depends on how it is connected.
The Differential Mode Op-Amp. What is the Differential Mode ? The op-amp can be connected up in various ways or modes. What it does depends on how it.
NSF ANNUAL REVIEW June 2010 Ocean Observatories Initiative August Release 1 Life Cycle Architecture (LCA) Review Status of CI Project Matthew Arrott.
Series Circuits: Other examples:. Series circuits - ________________________________________ _________________________________________ Assume: 1. _____________________________________________________.
Physics 2112 Unit 9: Electric Current
Power & Energy in Electric Circuits Series Circuits
RAT R1 R2 R3 R4 R5 R6 R7 Fetch Q RS MOB ROB Execute Retire.
1 PPC 9/10/98 G.Cyvoct PS/OP  Start up: grâce au travail de préparation (Linac et PSB) durant aôut et septembre, nous avons obtenu un faisceau de 1.8.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Booster Beam Dynamics Christian Carli On behalf of the team working on and contributing to the study: M. Aiba did all ORBIT simulations (Booster modelling.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
CERN/GSI beam dynamics and collective effects collaboration meeting 18 th February 2009 High Intensity Operation of the CERN PS Booster (PSB) Christian.
UPDATE IN PTC-ORBIT PSB STUDIES Space charge meeting ( ) * Vincenzo Forte * Follows LIS meeting presentation 16/04/2012.
PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
MG - IEFC Workshop MTE status and outlook for 2012 M. Giovannozzi Introduction Recap of 2011 activities Activities before LS1 Milestones Acknowledgements:
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
PS2 beam parameters and proposal for aperture strategy M. Benedikt , PS2 meeting1Beams and apertures, M.Benedikt.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
PS2 WG Injection and extraction systems Basics and assumptions
J.-L. Sanchez Alvarez(PSB-EIC)
PS status 10 August – 17 August 2017
Alternative/complementary Possibilities
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
ISOLDE Interlocks MSWG 13 August 2013 K. Hanke, E. Piselli KH.
Emittance growth AT PS injection
Elena Wildner CERN CA15139 Meeting, Sofia 15/
Update on the PSB Transfer Lines
PSB-PS instrumentation for LIU
CLIC Drive Beam Stabilisation
New AD Production Beam in the PSB
D. Manglunki with input from C. Carli, K. Cornelis, T. Dobers, I
PS2 Injection/Extraction Layout
Introduction to LHC beam production in PSB and PS
Present and Future test facilities for High-intensity Targetry CERN
Negative Momentum Compaction lattice options for PS2
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
J. Seeman Perugia Super-B Meeting June 2009
Current impedance activities
Negative Momentum Compaction lattice options for PS2
Transfer Line for EIC.
Presentation transcript:

PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 1 03/03/200 0 PSB Recombination Layout Present Kickers & Septa BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10 BT.SMV20 BT.KFA20 BE.SMH BE.KFA BT.BHZ10 To ISOLDE To PS Vertical PlaneHorizontal Plane

PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 2 03/03/200 0 Present Standard Extraction (4 Rings) BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10 BT.SMV20 BT.KFA20 BE.SMH BE.KFA BT.BHZ10 To ISOLDE To PS Vertical PlaneHorizontal Plane t BT1 BT4 R3R4 R2R1 t BT. KFA20 R3R4R2R1 KFA  s

PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 3 03/03/200 0 Present Staggered Extraction ISOLDE(3 Rings) BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10 BT.SMV20 BT.KFA20 BE.SMH BE.KFA BT.BHZ10 To ISOLDE To PS Vertical PlaneHorizontal Plane t BT1 KFA10 R3R4 R2 BT4 t BT. KFA20 R3R4R2 10  s

PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 4 03/03/200 0 “Bottleneck” for 4 Rings Staggered Extraction BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10 BT.SMV20 BT.KFA20 BE.SMH BE.KFA BT.BHZ10 To ISOLDE To PS Vertical PlaneHorizontal Plane t BT1 KFA10 R3R4 R2R1 BT4 t BT. KFA20 R3R4R2R1 10  s 0.5  s Not suitable for Isolde : Too short R2-R1 spacing imposed by KFA20 !

PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 5 03/03/200 0 Proposed “semi-fast” Dipole Kicker for 4-Rings Staggered Extraction Vertical Kicker for Staggered Extraction of Ring 1 BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10 BT.SMV20 BT.KFA20 BE.SMH BE.KFA To ISOLDE To PS Vertical PlaneHorizontal Plane BT.KFA15 BT.KFA 15 positioned at former location of BT.KRF (RF-Recombination Dipole) BT.BHZ10

PSB/PS Transfer M. Benedikt PS/OP, J.P.Riunaud PS/CA 6 03/03/200 0 Proposed 4-Rings Staggered Extraction to Isolde BT. KFA20 BT. KFA15 Beam to Isolde Time Structure R1(2)R2(1)R3(4)R4(3) 10  s 100  s Time scale : BT4.SMV10 BT1.SMV10 BT4.KFA10 BT1.KFA10 BT.SMV20 BT.KFA20 BE.SMH BE.KFA To ISOLDE To PS Vertical PlaneHorizontal Plane BT.KFA15 BT.BHZ10