1 GOES-14 Imager and Sounder a preliminary look Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite Products Branch (ASPB)

Slides:



Advertisements
Similar presentations
1
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 11 Ethernet Evolution: Fast and Gigabit Ethernet.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
CALENDAR.
1 1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
: 3 00.
5 minutes.
Numeracy Resources for KS2
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Slide: 1 Version 0.3, 20 January 2004 METEOSAT SECOND GENERATION (MSG) METEOROLOGICAL USE OF THE SEVIRI HIGH-RESOLUTION VISIBLE (HRV) CHANNEL Contact:Jochen.
Energy Generation in Mitochondria and Chlorplasts
1 GOES-14 Science Test December 2009 Don Hillger, Deb Molenar, Dan Lindsey, John Knaff NOAA/NESDIS/STAR/RAMMB Dave Watson, Mike Hiatt, Dale Reinke, etc.
Select a time to count down from the clock above
1 GOES-14 Imager and Sounder a preliminary look Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite Products Branch (ASPB)
GOES-13 First Infrared radiances Data from SSEC Data Center T. Schmit ASPB.
Data Changes from GOES- 12/NOP Imagers Timothy J. Schmit NOAA/NESDIS/STAR (formerly ORA) SaTellite Applications and Research (STAR) Advanced Satellite.
Thanks also to… Tom Wrublewski, NOAA Liaison Office Steve Kirkner, GOES Program Office Scott Bachmeier, CIMSS Ed Miller, NOAA Liaison Office Eric Chipman,
60 West – A Wisconsin Perspective Timothy J. Schmit Gary S. Wade NOAA/NESDIS/STAR Advanced Satellite Products Branch (ASPB) Madison, WI GOES-10:
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 The GOES-14 Science Test Timothy Schmit (GOVERNMENT PRINCIPAL INVESTIGATOR)
Mathew M. Gunshor* 1, Scott Lindstrom 2, Timothy J. Schmit 3, David C. Tobin 1, W. Paul Menzel 1 1 Cooperative Institute for Meteorological Satellite Studies.
GOES-14 Imager and Sounder
Meteosat Second Generation
AIRS/GEO Infrared Intercalibration
GOES -12 Imager April 4, 2002 GOES-12 Imager - pre-launch info - radiances - products Timothy J. Schmit et al.
Presentation transcript:

1 GOES-14 Imager and Sounder a preliminary look Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite Products Branch (ASPB) Mathew M. Gunshor, Tony Schreiner, Scott Bachmeier, Joleen Feltz, Steve Wanzong, SSEC Data Center, etc. CIMSS/SSEC, Madison, WI Don Hillger and Tim Schmit co-lead the NOAA Science Test

2 Outline Introduction First imager and sounder images –Issues –Comparisons Improved imager band 6 (13.3 um) spatial resolution Preliminary inter-calibration results Improved INR and Operation thru eclipse Initial products (imager and sounder) Web links

3 GOES-14 GOES-13/14/P have similar instruments to GOES-8- 12, but on a different spacecraft bus. Spring and fall eclipse outages will be avoided by larger onboard batteries. Improved navigation Improved radiometrics GOES-8/12 GOES-13/14/P

4 GOES-O Science Test web page: GOES-14 von Karman vorticies

5 actinoform clouds Amazon suppressing the formation of cumulus vortex in the marine layer clouds, snowsediment plume

6 Noted several issue with initial GOES-14 data Important diagnostic work was under- taken. After an issue was raised dealing with the data stream of imager band 6, the suggested fix was implemented at the ground station. Many groups, both within NOAA/NESDIS, the Cooperative Institutes, NASA and others, quickly worked together to fix this issue. The first two official full disk images were ‘too wide’ and hence displayed ‘extra’ header information within the frame of data. Sponsor: OSD G-PSDI Program Erroneous line headers of the GOES-14 Imager bands 3 and 6 (the 6.5 and 13.3 um) in the first official full disk images. GOES-14 Imager

7

8 Noted several issue with initial GOES-14 data Important diagnostic work was under-taken. After an issue was raised dealing with the data stream of imager band 6 (13.3 um), the suggested fix was implemented at the ground station. Many groups, both within NOAA/NESDIS, the Cooperative Institutes, NASA and others, quickly worked together to fix this issue. Another issue was the ‘flipped’ order of the band 6 of the GOES-14 imager in the GVAR datastream. This was communicated, corrected and verified. Sponsor: OSD G-PSDI Program Erroneous detector flip of the GOES-14 Imager band 6 (the 13.3 um) in the first IR images. GOES-12 ImagerGOES-14 Imager (before fix) Note the artificial ‘stair-step’ of cloud edges due to the detectors initially being out of order in GVAR.

9 First GOES-14 Imager and Sounder images On August 17 th and 18 th, the first official Geostationary Operational Environmental Satellite (GOES)-14 infrared (IR) images were scanned. Qualitatively, the data from the Imager and Sounder are high quality, with improved signal-to- noise ratios compared to other operating GOES satellites. The NOAA Science test will begin in December of The first GOES-14 Imager and Sounder images look to be of high quality, this is the first step for the subsequent NOAA science test check-out. (Courtesy of T. Schmit) Sponsor: OSD G-PSDI Program First GOES-14 Imager data on August 17, 2009 First GOES-14 Sounder data on August 18, 2009

10 First GOES-14 Images (sub-sampled) From NOAA ASPB Note the ‘brighter’ GOES-14 visible image

11 GOES-12 (for comparison) Note the sub-satellite points are different From NOAA ASPB

12 GOES-14 Sounder! Note clean signal, especially bands 1, 2, 12 and 15.

13 GOES-12 Sounder Data has been remapped to a common projection.

14 River Fog GOES-12GOES-14 The fog is a bit brighter and a little more extensive in the GOES-14 image. GOES-14 is able to discern urban centers more readily than GOES-12.

15 Imager SRF

16 Improved spatial resolution of GOES-14 Imager band 6 The improved spatial resolution of the Geostationary Operational Environmental Satellites (GOES)-14 imager band 6 has been verified. This band, centered at 13.3 um, has a number of uses, the main being cloud height determination. Important diagnostic work was under-taken. After an issue was raised dealing with the data stream of imager band 6, the suggested fix was implemented at the ground station. Many groups, both within NOAA/NESDIS, the Cooperative Institutes, NASA and others, quickly worked together to fix this issue. The improved spatial resolution of the GOES-14 imager band 6 (over GOES-12/13 imagers) has been verified with initial on-orbit data. (Courtesy of T. Schmit) Sponsor: OSD G-PSDI Program The 13.3 um band 6 of the GOES-12 (left panel) has an 8 km IGFOV (Instantaneous Geometric Field of View); while the same band on the GOES-14 (right panel) has a 4 km IGFOV. Note the finer resolution of the cloud edges and the ‘cleaner’ image. GOES-12 GOES-14

Cooperative Institute for Meteorological Satellite Studies University of Wisconsin - Madison 17 Methodology: GEO – IASI Intercal  Collocation in time and space.  Within 30 minutes at geostationary subpoint (GSNO – Geostationary Simultaneous Nadir Observation)  Low Satellite View Angles (< 14)  Spatial smoothing  100km “running average” mitigates the negative effects of poor spatial and temporal collocation, poor navigation, and spatial resolution differences.  Average radiances, not temperatures.  Compare a common area around the GEO sub-point, not “pixel to pixel” comparisons  “Convolve” high spectral resolution Radiance spectra with GEO Spectral Response Function.  Compare mean scene brightness temperatures (converted from mean scene radiances).

18 Preliminary intercalibration results with GOES-14 Imager using IASI Mean temperature differences with IASI (for 12 cases) are: -0.4 K for the Shortwave Window band (5 night cases) +0.8 K for the Water Vapor band +0.1 K for the IR Window band -0.6 K for the CO2 Absorption band – The CO 2 band SRF may be updated before the science test takes place. – Some of these results may include cases where navigation was not optimal.

19 Improved INR

20 Operation through Eclipse

21 GOES Series Sounder Noise Wavelength ChannelGOES-08GOES-09GOES-10GOES-11GOES-12GOES-13GOES-14 SPEC (I-M) Preliminary GOES-14 – the best Sounder yet wrt noise performance! Units: mW/(m 2 ster cm -1 )

22 Visible GOES-12; SNR of 13:1 GOES-14; SNR of 33:1

23

24

25

26

27

28

29

30

31

32

33

34

35 GOES-14 Imager AMV (low-level)

36 GOES-14 Imager AMV (mid and upper-level)

37 GOES-14 Imager and Sounder