Dr. G. Giridhar Solar Radiation Resource Assessment “ASEAN – India Workshop on Cooperation in Renewable Energy” 6 th November, 2012, Vigyan Bhawan, New.

Slides:



Advertisements
Similar presentations
PV String Monitoring Solution
Advertisements

1 Series V4T 1/4 DIN Temperature Controllers. 2 3 Watlows Next Generation Styling Series 97 Matching 1/16 DIN Limit Controller Series F4S and F4D Ramping.
Fill in missing numbers or operations
Model D 400 Operating features (basic version) General specificationsTechnical data The new Dialogica series of terminals reflects the outcome of advanced.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
FIGURE 2.1 The purpose of linearization is to provide an output that varies linearly with some variable even if the sensor output does not. Curtis.
What is valorisation ? Growth €
Electric cars: part of the problem or a solution for future grids? Frans Nieuwenhout, Energy research Centre of the Netherlands ECN Sustainable.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
1 1  1 =.
Year 6 mental test 10 second questions
Multi Beamlett Extraction Experiments and Sector Magnet Field Investigation.
Who Wants To Be A Millionaire? Decimal Edition Question 1.
INVESTIGATION OF LOCAL STATISTICAL CHARACTERISTICS OF TURBULENT WIND FLOW IN ATMOSPHERE BOUNDARY LAYER WITH OBSTACLES Yuriy Nekrasov, Sergey Turbin.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Chapter 1 Introduction to the Programmable Logic Controllers.
Chiu Choi, Ph.D., P.E. Technical Consultant OIML workshop on the metrology of vehicle speed measurement devices NIST Headquarters, Gaithersburg, MD July.
PP Test Review Sections 6-1 to 6-6
Welcome to the information pages of the LIST linear fire detection system.
Cost-Volume-Profit Relationships
MCQ Chapter 07.
7. PV System Sizing Herb Wade Consultant
Power Systems Design -II
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
SITOP power facets A&D SE PS SITOP power Automation and Drives SITOP power flexi The power pack handles it all - from 3 to 52V SITOP power.
First Solar FuelSmart™: Powering Energy Security
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1..
Capacity to Customers (C 2 C)- Review of Standards – Accommodating Responsive Demand in ER P2/6 24 th January 2013.
Adding Up In Chunks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
City Council Meeting Agenda Items October 28, 2013.
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
Subtraction: Adding UP
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
PSSA Preparation.
Essential Cell Biology
UNCLASSIFIED Space Power Station First Order Assessment 22 Apr 2007.
Nokia 30 technical specification
Select a time to count down from the clock above
1 McGill University Department of Civil Engineering and Applied Mechanics Montreal, Quebec, Canada.
Cabauw dag , R. Boers 1 Radar Observations of Fog Layers R. Boers contributions from H. Klein Baltink, J. Hemink, F. Bosveld, and M. Moerman.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
1 DIGITAL INTERACTIVE MEDIA Wednesday, October 28, 2009.
CDR Analysis & Investigation Basic Course - Presentation by Ketan Computers Mobile: Website :
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Review of Audit Reports Financial Year th Quarterly Review Meeting of Finance Controllers, New Delhi.
SOLAR ENERGY IRRADIATION AND MEASUREMENTS
Site Feasibility Analysis for Large SPV Power Projects
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Pressure Level Sensor OTT PLS
Culture 8 - National Capital Territory of Delhi Culture 6B - Goa
Presentation transcript:

Dr. G. Giridhar Solar Radiation Resource Assessment “ASEAN – India Workshop on Cooperation in Renewable Energy” 6 th November, 2012, Vigyan Bhawan, New Delhi 1

Solar Energy-JNNSM MNRE, GOI initiated JNNSM in to establish India as a global leader in Solar Energy. Global effort to meet the challenges of climate change. Create conditions indigenous solar manufacturing capability. Promote grid/decentralized power applications. Technology innovations, R&D, cost reduction, grid parity. Mapping of ground solar insolation 2

Application segment Target for Phase I ( ) Target for Phase 2 ( ) Target for Phase 3 ( ) Solar collectors 7 million sq. meter 15million sq. meter 20million sq. meter Off grid solar application 200 MW1000 MW2000 MW Utility grid power, including roof top MW MW20000 MW Implementation of JNNSM 3

Why Measurements…? Ground measured data is more accurate. Quantification of the ground data. A combination of measured and satellite data helps in better understanding solar potential areas. In preparation of accurate and reliable SOLMAPS Design & Performance Parameters To determine the bankability of the proposals 4

Availability Solar Radiation Data “Solar Radiation over India” by A Mani, IMD “Handbook of Solar Radiation” by A Mani and S.Rangarajan, IMD “Solar Radiant Energy over India (2009)” by Ministry of New and Renewable Energy,GOI. SEC-NREL NASA METEONORM SOLEMI 5

SRRA Objectives To assess and quantify the ground data of solar radiation To establish Calibration Laboratory for solar radiation measuring equipments at C-WET, Chennai. Data processing, modeling and making of Solar Maps

SRRA Implementation In 2011 under JNNSM, SRRA Program was fully financed by Ministry and implemented by C-WET, Chennai. An exclusive Solar Radiation Resource Assessment unit has been established at C-WET. All 51 SRRA Stations in 10 States and 1 Union Territory was completed and commissioned between March to October, Data from all SRRA stations are transmitted through GPRS to Central Receiving Station established at C-WET. 7

Site Selection criteria Area Free horizon Strong network connectivity Safety & Security Electromagnetic interference Easy accessibility to site

State wise SRRA stations Phase I & II Sl.NoState/UTPhase IPhase IITotal 1Andhra Pradesh639 2Bihar-33 3 Chhattisgarh112 4Gujarat Haryana112 6Himachal Pradesh-22 7Jammu & Kashmir112 8Jharkhand-22 9Karnataka516 10Kerala-22 11Madhya Pradesh358 12Maharashtra369

Continued…… Sl.NoState/UTPhase IPhase IITotal 13Orissa-44 14Punjab Rajasthan12- 16Tamil Nadu7-7 17Uttar Pradesh-55 17Uttarakhand-22 18West Bengal-33 19North-East-10 20Union Territories156 Total

SRRA STATIONS PHASE-I & II

Normal Incidence Pyrheliometer from Eppley Laboratory, USA SPECIFICATIONS: Sensitivity: approx. 8 µV/Wm -2. Impedance: approx. 200 Ohms. Temperature Dependence: ±1% over ambient temperature range - 20 to +40°C. Linearity: ±0.5% from 0 to 1400 Wm -2. Response time: 1 second (1/e signal). Calibration reference : Eppley primary standard group of pyrheliometers.

Precision Pyranometer from Eppley Laboratory, USA SPECIFICATIONS Sensitivity: approx. 9 µV/Wm -2. Impedance: approx. 650 Ohms. Temperature Dependence: ±1% over ambient temperature range - 20 to +40°C Linearity: ±0.5% from 0 to 2800 Wm -2. Response time: 1 second (1/e signal). Cosine: ±1% from normalization 0-70° zenith angle; ±3% 70-80° zenith angle. Calibration: integrating hemisphere. Orientation: Performance is not affected by orientation or tilt.

Sun Tracker from Geonica, Spain

Tipping Bucket Rain Gauge from R M Young, USA Specifications Size: 18 cm dia. x 30 cm high, (39 cm high with mounting base) Catchment Area: 200 cm² Resolution: 0.1 mm per tip Accuracy: 2% up to 25 mm/hr 3% up to 50 mm/hr Output: Magnetic reed switch (N.O.), rating 24VAC/DC 500mA Operating Temperature: -20°C to +50°C

Ultrasonic Anemometer from R M Young, USA Sp ecifications Wind Speed: 0 to 70 m/s (0 to 156 mph) Resolution: 0.1 m/s Accuracy: ± 2% or 0.1 m/s (30 m/s), ± 3% (70 m/s) Wind Direction: 0 to 360 degrees Resolution: 1 degree Accuracy: ± 2 degrees Serial Output: RS-232 or RS-485 Formats: NMEA, ASCII Text, RMYT, SDI-12 Units: Knots, m/s, MPH, Km/hr Analog Voltage Outputs: Wind Speed: 0 to 5000 mV Wind Direction: 0 to 5000 mV Power Requirement: 9 to 16 VDC, 30 mA typical (less than 1mA standby) Operating Temperature: -50 to +50 °C Dimensions: 34cm high x 17cm wide (39cm with Bird Spikes installed) Weight: 0.8 kg (1.8 lb)

Temperature and Humidity Sensor from R M Young, USA RELATIVE HUMIDITY: Measuring Range: %RH Accuracy at °C: ±1 %RH, Stability: Better than ±1 %RH per year Response Time: 10 seconds (without filter) Sensor Type: Rotronic Hygromer™ Output Signal: V option: 0-1 VDC, L option: 4-20 mA TEMPERATURE: (41382, 41342) Calibrated Measuring Range: -50 to 50 °C (suffix C) -50 to 150 °F (suffix F) Response Time: 10 seconds (without filter) Accuracy at 23°C: ±0.3 °C /optional ±0.1 °C NIST calibration Sensor Type: Platinum RTD Output Signal: V Option: 0-1 VDC, L Option: 4-20 mA, 4 wire RTD

Barometric Pressure Sensor from R M Young, USA Specifications: Pressure Range: hPa Operating Temperature: -40 to +60°C Digital Accuracy*: 0.2hPa (25°C) 0.3 hPa (-40 to +60°C) Analog Accuracy**: 0.05% of analog pressure range Analog Temperature Dependence: % of analog pressure range/°C (25°C reference) Update Rate: 1.8 Hz max Serial Output: Full duplex RS baud Polled or Continuous ASCII text or NMEA format Dimensions: 90mm (3.6 in) x 60 mm (2.4 in) x 20 mm (0.8in)

InstrumentManufacturerParameter GPSGarmin, USATo synchronize Sun Tracker with Sun movement Data logger & ModemGeonica,SpainCollecting data from sensors and transferring it to Central Receiving Station at C WET, Chennai GPRSGarmin, USATo transfer data through mobile SIM cards to Central Receiving Station at C WET, Chennai Solar PV PanelMoserbaer, India For charging battery for powering SRRA station External BatteryExide, IndiaFor electrical storage Derived details on Solar Elevation angle, Solar Azimuth angles, Battery voltage are also available Supporting Instruments 19

Typical SRRA station 20

Data collection & QC Sampling periodAveraging period Duration 10 sec10 min Up to Nov sec10 minUp to August sec1 minFrom August 2012 For solar radiation parameters, the applied quality control is based on Baseline Surface Radiation Network (BSRN) standards of World Meteorological Organisation (WMO), and Management and Exploitation of Solar Resource Knowledge (MESOR)

Establishment of Calibration Laboratory A Calibration Laboratory has been established at C- WET. Two numbers of Absolute Cavity Radiometer, four numbers of Standard Precision Pyranometer and Solar Trackers are available. 22

Training Program 3 Days Training Programme on “Functioning and Maintenance of ASRMS” for station in-charge from 10 th to 12 th October 2011 at C-WET, Chennai. 1 Day training program conducted on the O & M aspects the SRRA for all the station in-charge of Rajasthan and Haryana, at IIT Jodhpur on 28 th January Day training program on the “Functioning and Maintenance of SRRA station” for all the station in-charge of Gujarat, Madhya Pradesh, Chhattisgarh, Maharashtra(Pandharpur) and Jammu & Kashmir(Leh) organised at PDPU, Gandhi Nagar on26 th April 2012.

Institutional collaboration Under Indo German Collaboration with GIZ, Germany for data processing, quality assessment and developing solar maps of India. Satellite data from Space Application Centre, ISRO, Ahmedabad for the preparation of solar maps of India. 24

Users of SRRA Data High quality solar radiation data for solar developers for bankable propositions, design and performance parameters. Satellite Data Providers for Ground truthing. Academic/Researcher/Policy Makers/Consultants. Calibration of Solar Sensors 25

Availability of SRRA Data Previous Month Average Data for all stations are available on C-WET Web Site (interactive map) Quality Controlled ASCII data and report in PDF format (Daily, Monthly and Yearly) are available on payment basis. SRRA data would be sold either through CD / . 26

Solar Data Policy 2012 MNRE sole and exclusive owner of data Only quality controlled data will be sold C-WET is authorised to sell data Data for more than 5 sites (bulk Buyer) at a time - requires Ministry’s approval Publication of data- requires specific MNRE/C- WET permission Special approval from MNRE is required for supply data to foreign nationals. Details of pricing is available on

Details of Data Reports ProductDataQC information Amount in Rupees CommercialNon commercial Daily1 minute time stampFlagged information monthly1 minute time stamp on daily basis Flagged information 5,0002,500 Yearly1 minute time stamp on daily and monthly basis Flagged information 50,00025,000 Monthly Report (PDF) Monthly and daily average Information Details * 2,000 * Graphs, Solar Radiation and meteorological parameters, QC test reports and figures and Wind rose

issues….. Maximum outages have been observed with the damage to the transducer of ultrasonic wind sensor.

Bird damaged transducers of ultrasonic anemometer. One of the damaged transducers of ultrasonic anemometer. This happened despite having modified bird guards (spikes) New model of Wind Sensor being adopted to avoid damages by birds

Future Plan Setting up of 60 more SRRA stations Calibration of Solar sensors. Aerosol measurements at 4 SRRA stations. Up gradation and integration of 45 IMD solar radiation measuring stations. Consultancy projects. 31

Consultancy Projects SRRA has received request from private developers to install Solar Monitoring Station and collect data and prepare DPR on consultancy basis. The detailed list of request from plant developers are as follows: Sl No Name of the CompanyNo of Stations Location 1NHPC, Faridabad32 in J&K 1 in H.P 2Mott McDonald Pvt Ltd, Ahmedabad10Jharkhand

Thank you