of Municipal Engineers

Slides:



Advertisements
Similar presentations
Bedridden Code Issues in RCFE’s Working with Your Local Fire Authority
Advertisements

All citizens of the state benefit from a balanced supply of housing which is affordable to persons and families of low and moderate income. Establishment.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Report to TACIR on Underground Utility Damage Prevention in Tennessee
RULE ADOPTION The Commissions Role. What is a rule? A "rule" is the whole or any part of a state agency statement of general applicability that: (1) has.
Electronic Locking and Exemption Request Form Training
Regulatory Reform (Fire Safety) Order 2005 Fire Safety Order What is the Fire Safety Order? The order was made, under the Regulatory Reform Act 2001.
Board of County Commissioners PUBLIC HEARING October 28, 2008.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Persistent Title (as needed) Proposed Zoning Regulations Revisions.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
August 20, 2014 Infill Incentive District Revisions 2014.
Intro to Maine Subdivision Law
CODE ENFORCEMENT DIVISION.  PURPOSE OF NUISANCE ORDINANCE:  It is the purpose of the nuisance ordinance to establish means whereby the City may remove.
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
Land Subdivision and Zoning Unit: Owning Property Lesson: Land Subdivision and Zoning.
Preservation Tax Incentives for Historic Buildings A Joint Program of the following agencies: Department of the Treasury Internal Revenue Service Department.
Statutes & Regulations State Board of Master Plumbers Continuing Education License renewal 2007.
THE ABCs OF CRAs THE PLAN CHAPTER 163 REQUIREMENTS.
Area Commissions Purpose Area commissions are established to afford additional voluntary citizen participation in decision-making in an advisory.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
SB 490 Amendments to the Kansas Underground Utility Damage Prevention Act Effective January 1, 2003.
Procurement Lobbying Legislation New York State Bar Association December 9, 2005 (revised January 4, 2006)
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
©OnCourse Learning. All Rights Reserved.. Land-Use Control ©OnCourse Learning. All Rights Reserved. Chapter 23.
Zoning The legislative division of an area into separate districts with different regulations within each district for land use, building size, and the.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
February 24, 2015 First Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15 
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Occupational Safety & Health Act of 1970
Occupational Safety & Health Act of 1970
Governmental Constraints on Construction Chapter 2.
IRSDA Conference What Do the Amendments to Indiana Code Section Mean to You? Kristina Kern Wheeler, General Counsel Ja-Deen L. Johnson, Consumer.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
March 10, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
2010 Florida Building Code: I nterpretation P rocess O verview.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Board of County Commissioners PUBLIC HEARING September 1, 2009.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
JULY 16, 2013 BCC APPEAL HEARING ON BZA SE , JUNE 06, 2013 APPLICANT: KEVIN DONAGHY AGENT FOR CHANTEL PRESTON.
Zoning pt. III. Intensity Regulations Meant to dictate the intensity of use Different standards for different use districts –Minimum lot size –Minimum.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Island County Planning and Community Development Permitting 101.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, :00 pm to 4:00 pm.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
Ontario Building and Fire Code Overview Presentation for the Downtown Revitalization Committee May 4, 2016 Jack Tosta, Chief Building Official Andrew McPherson,
SUBDIVISION AND COMMON INTEREST DEVELOPMENT LAWS HOW THEY AFFECT CONVENTIONAL HOUSING COOPERATIVES AND OUR PROPOSED NEW MODEL.
ACCESSORY DWELLING UNITS: CLEARING UP THE CONFUSION
Regulation of land use and building activities
DIVISION OF MOTORIST SERVICES BUREAU OF DEALER SERVICES
Common Surveys Used For Commercial Real Estate Transactions
City of Healdsburg Construction Codes Amendments & Adoption: 2016 Building Standard Codes Title 24 Parts 1 Thru International Property Maintenance.
Municipal Land Use Law C.40:55D-53 - NEW DEVELOPER
Land Use and Development Regulations
Planning Commission Meeting: August 3, 2016
Board of County Commissioners
Effective Methods For Property Clean Up
Presentation transcript:

of Municipal Engineers New Jersey Uniform Construction Code and an Introduction to the Municipal Land Use Law New Jersey Society of Municipal Engineers CME Program Nov. 13, 2014 Carl E. Peters, PE, PLS, PP, CO 11/10/2014 © Carl E. Peters

Carl E Peters, PE, PLS, PP, CO 4525 Route 27 Princeton, NJ 08540, 609.751.4104 cpeters@carlepeters.com www.carlepeters.com 11/10/2014 © Carl E. Peters

Objective To give Professional Engineers the tools required to obtain the municipal approvals necessary to construct, repair, renovate, alter, add to or change the use of a building in New Jersey 11/10/2014 © Carl E. Peters

Introduction to: NJ Municipal Land Use Law (MLUL) Municipal Bodies Regulating Land Use Planning and Zoning NJ Uniform Construction Code Residential Site Improvements Standards Regulation of Design Professionals 11/10/2014 © Carl E. Peters

Why Do CME’s Need To Know This? Review of Site Plans & Subdivisons Administration of Projects On Municipally Owned Buildings Coordination of Prior Approvals and Site Inspections with Code Officials Projects for Private Clients Management of Playgrounds 11/10/2014 © Carl E. Peters

Why Do CME’s Need To Know This? Possible Employment Opportunities Follow the laws of professional practice 11/10/2014 © Carl E. Peters

Lesson Plan Work through the process of obtaining municipal approvals to plan and construct/alter a building Stop along the way to describe key elements of the process Discuss benefit of this information for both home and professional use Class interaction is encouraged 11/10/2014 © Carl E. Peters

Our Project Mixed Use Building Existing two story building – 4000 sq. ft. New building footprint 5000 sq. ft. First Floor – Retail Second Floor - Professional Offices Third Floor – Four Residential Units On-site parking At corner of two municipal streets Must acquire 100’ strip from adjacent lot 11/10/2014 © Carl E. Peters

The Conditions Description Required Proposed Minimum Lot Area 80,000 sf 90,000 sf Width 250 lf 300 lf (200 lf exist) Depth 300 lf Front Yard Setback 50 lf 60’ Side Yard Setback 25 lf 40’ Rear Yard Setback 190 lf Max. Building Area 25,000 sf 15,000 sf Max. Lot Coverage 20% 5.6% Max. Building Height 35’ 37’ Parking Spaces 1 per 300 sf comm. Residential per RSIS 38 11/10/2014 © Carl E. Peters

Questions What Land Use Approvals are required? How long is it likely to take from project inception until issuance of a construction permit? What are the codes that govern the design of the project? If the municipal agency is Class 3 may they review the plans for the project? Must the building have an elevator? How many h/c parking spaces are required? Does the number of h/c spaces change if the second floor offices are for an orthopedic group? 11/10/2014 © Carl E. Peters

How long will it take before the construction can begin? 0 – 6 months 6 – 12 months 13 – 18 months 19 - 24 months Greater than 2 years 11/10/2014 © Carl E. Peters

Design and Review Timeline Property Survey Preliminary Design Land Use Approvals Final Design Meet Conditions of Land Use Approvals Utility Company Authorizations Construction Code Approvals 11/10/2014 © Carl E. Peters

How is Local Land Use Regulated? NJ Municipal Land Use Law (MLUL) What is it? How was it created? What does it regulate? 11/10/2014 © Carl E. Peters

Municipal Bodies Regulating Land Use Who are they? What are their responsibilities? 11/10/2014 © Carl E. Peters

Planning and Zoning What are they? How are they implemented? How do they affect your project? 11/10/2014 © Carl E. Peters

NJ Uniform Construction Code When Permits Are Required What Codes to Follow for Design How to File a UCC Permit Application Required Inspections Certificates of Occupancy Prior Approvals 11/10/2014 © Carl E. Peters

NJ Uniform Construction Code Requirements for Existing Buildings Types of Enforcing Agencies Barrier Free Code Requirements Playground Safety Requirements Penalties Variations and Appeals 11/10/2014 © Carl E. Peters

Regulation of Design Professionals Registered Architects Professional Engineers Professional Land Surveyors 11/10/2014 © Carl E. Peters

Residential Site Improvements Standards What are they? When were they created? When are they applicable? 11/10/2014 © Carl E. Peters

Most Importantly We will learn where to find the information we need: Statutes, Regulations, Ordinances 11/10/2014 © Carl E. Peters

Not Included State Plan Special Land Use Regulations Fair Housing, Redevelopment, Brownfields, Historic Preservation Environmental Regulations Freshwater Wetlands, CAFRA Special Planning Areas Meadowlands, Pinelands 11/10/2014 © Carl E. Peters

Definitions and Abbreviations DCA – NJ Department of Community Affairs – Division of Codes and Standards MLUL – NJ Municipal Land Use Law RSIS – Residential Site Improvements Standards 11/10/2014 © Carl E. Peters

Historical Background Municipalities may only engage in the activities that are authorized by the State 1928 – Model Zoning Enabling Act 1935 – Municipal Planning Act 1975 – Municipal Land Use Law 11/10/2014 © Carl E. Peters

Historical Background Prior to the mid-1970’s municipalities were allowed to create their own: Land Use Regulations and Procedures Construction Codes Municipal Land Use Law - 1975 Effective August 1, 1976 Uniform Construction Code Act -1975 Code Effective January 1, 1977 11/10/2014 © Carl E. Peters

Purpose of Uniform Construction Code Act – NJSA 52:27D – 119 et seq Speed Construction Reduce Costs Encourage Innovation And Economy Adequate Performance = Acceptability Permit Modern Construction Techniques Eliminate Unnecessary Regulations That Increase Cost And Retard Use Of New Materials Eliminate Duplication Of Effort And Fees 11/10/2014 © Carl E. Peters

Getting a Project Started What do we know first? Who? What? When? Where? How? 11/10/2014 © Carl E. Peters

Getting a Project Started What we know at the outset Who wants to build something – us What we want to build – house, store, restaurant, garage, etc. Defines the process we must follow When – not nearly soon enough Where – We may know the general region but not yet have a specific property How – Is what this class is all about. 11/10/2014 © Carl E. Peters

Planning and Zoning New Jersey Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq[A1]  565 Municipalities create their own development regulations Zoning Map and Ordinance Local regulations must be built along the rules and framework established in MLUL MLUL dictates the process Purchase through NJPO 11/10/2014 © Carl E. Peters

Municipal Land Use Bodies Governing Body Planning Board Zoning Board of Adjustment 11/10/2014 © Carl E. Peters

Governing Body – Who Are They? Elected Municipal Legislative Body NJ Forms of Municipal Government See http://www.njslom.org/forms-of-government.html 11/10/2014 © Carl E. Peters

Governing Body - Responsibilities Board Appointments Create Ordinances Enforcement Establish Fees Hear appeals For approval of type (d) variances only Only if specified by ordinance 11/10/2014 © Carl E. Peters

Planning Board – Who Are They? Class I: The mayor or mayor’s designee. (1) Class II: A municipal official, other than a member of the governing body, appointed by the mayor. (1) Class III: A member of the governing body, appointed by it. (1) Class IV: Other citizens of the municipality, appointed by the mayor. Class IV members may not hold any other municipal office or position. (4 or 6) 11/10/2014 © Carl E. Peters

Planning Board Responsibilities Prepare Master Plan Subdivision Control Site Plan Review One and two family dwellings are exempt Zoning Ordinance Bulk Variances per NJSA 40:55D-70 c Conditional Use Authorization Permission to build on lot w/o street frontage 11/10/2014 © Carl E. Peters

Zoning Board of Adjustment Who Are They? Seven Municipal Residents May not hold any other municipal position 11/10/2014 © Carl E. Peters

Zoning Board Responsibilities Hear Appeals of Decisions Made by the Administrative Officer Interpret the Zoning Ordinance and Zoning Map Hear Requests for “c” Variances C(1) – Hardship C(2) – Flexible One and Two Family Dwellings Only 11/10/2014 © Carl E. Peters

Zoning Board Responsibilities Hear Requests for “d” variances The use or principal structure in a district regulated against such use or building. An expansion of a nonconforming use. Deviation from the standards for a conditional use. An increase in the permitted floor area ratio. 11/10/2014 © Carl E. Peters

Zoning Board Responsibilities Hear Requests for “d” variances An increase in permitted density. The height of a principal structure that exceeds by 10 feet or 10% of the height permitted in the district for a principal structure Five yes votes are required for approval 11/10/2014 © Carl E. Peters

Zoning Ordinance and Map Define Permitted uses (including conditional uses – such as a place of worship in a residential zone) Permitted lot size and dimensions Allowable building area Allowable building height Required yard setbacks (the distances that a building must be situated away from a lot line) Parking requirements And often much more 11/10/2014 © Carl E. Peters

Finding a Site for Your Project Local Zoning Ordinance and Map Check Municipal Web Site Meet With Zoning Officer If your desired use is not permitted in the zone in which your property is located, you may wish to consider another location. 11/10/2014 © Carl E. Peters

Preliminary Design Consider Hiring an Architect Now To Provide assistance to lay out the size and shape of building and site improvements Required for all building projects other than single family, owner occupied, residences The Building Design Services Act, NJSA 45:4B-1, et seq. specifies: Design that may be performed by an architect, and; Design that may be performed by an engineer.  11/10/2014 © Carl E. Peters

The Property Survey Performed by Professional Land Surveyor Provides information about: Size and shape of property Location and shape of existing improvements on the property and sometimes beneath the surface of the property Legal restrictions on use - such as easements 11/10/2014 © Carl E. Peters

Legal Issues It’s probably time to hire an attorney if you haven’t already Prepare Lease or Purchase Agreement Make conditional upon receipt of approvals 11/10/2014 © Carl E. Peters

Where do I go next? One or two family home Next step is to “Building Department” Unless you are unable to meet one or more of the bulk regulations in the zone Then go to Zoning Board of Adjustment Or if you need to create a new lot or adjust a lot line a subdivision is required Go to the Planning Board 11/10/2014 © Carl E. Peters

Where do I go next? For Anything Else Obtain Site Plan Approval Go to Planning Board, unless A (d) variance is required, then - Go to Zoning Board of Adjustment Unless - The Municipal Land Use Ordinance provides for an exemption 11/10/2014 © Carl E. Peters

Site Plan and Major Subdivision Approval Division of Responsibilities NJAC 13:40 – 7.1 et seq. http://www.njconsumeraffairs.gov/laws/pelsregs.pdf Checklist Requirements Per Municipal Ordinance Which Board has Jurisdiction? 11/10/2014 © Carl E. Peters

Site Plan and Major Subdivision Approval Completeness Review Upon certification by board or designee After 45 days from submittal, unless Application is missing information required on the completeness checklist, and Applicant has been notified in writing within 45 days. When complete the development clock starts. 11/10/2014 © Carl E. Peters

Site Plan and Major Subdivision Approval Time for Approval – Preliminary Site Plan 45 days If 10 acres or less and 10 dwelling units or less 95 days If over 10 acres or dwelling units 120 days If a variance is required 11/10/2014 © Carl E. Peters

Site Plan and Major Subdivision Approval Time for Approval – Preliminary Subdivision 45 days If 10 or fewer lots If classified as a minor subdivision 95 days If more than 10 lots 120 days If a variance is required 11/10/2014 © Carl E. Peters

Site Plan and Major Subdivision Approval Time for Approval – Final Approval of Site Plans and Major subdivisions Failure of the Board to act within the required time frame results in an approval Site Plan, Subdivision, Conditional Use and Variance approval may occur simultaneously Longest time period for action governs 11/10/2014 © Carl E. Peters

Site Plan and Major Subdivision Approval Public Hearing Notice required May be waived for minor site plans and subdivisions without variances Findings of Fact, performance bonds, etc. Filing of Subdivision maps or deeds Minor – 190 days Major – 95 days 11/10/2014 © Carl E. Peters

Residential Site Improvements Standards When Applicable shall govern any site improvements carried out or intended to be carried out or required to be carried out in connection with any application for residential subdivision, site plan approval, or variance These standards are both a maximum and minimum that may be required 11/10/2014 © Carl E. Peters

Residential Site Improvements Standards shall control all matters concerning the construction, alteration, addition, repair, removal, demolition, maintenance, and use of any site improvements constructed by a developer in connection with residential development. streets, roads, parking facilities, sidewalks, drainage structures, grading, water supply and sanitary sewers 11/10/2014 © Carl E. Peters

Residential Site Improvements Standards Streets Street hierarchy Right of way width Cartway width Curb or shoulder Sidewalk or graded area On street parking lanes Pavement cross-section Curb materials 11/10/2014 © Carl E. Peters

Land Use Approvals Obtained – Now What? Final Building Design Obtain Construction Code Permits Get Utility Mark-outs Begin Work Progress Inspections Final Inspections Obtain Certificate of Occupancy Bond Release 11/10/2014 © Carl E. Peters

Final Building Design and Plan Approval Who can prepare plans? What laws and regulations control design? Where do I submit the plans for review? What do I need to submit? How long will the review take? 11/10/2014 © Carl E. Peters

Final Building Design and Plan Approval The short answers are: 11/10/2014 © Carl E. Peters

Who may prepare plans? Registered Architect Professional Engineer in accordance with Building Design Services Act IBC Use and Occupancy Classifications Licensed Electrician – Class 3 Buildings Licensed Master Plumber – Class 3 Buildings Homeowner – for owner occupied, single family, detached dwellings 11/10/2014 © Carl E. Peters

What Laws and Regulations Control Building Design? NJ Construction Code Act NJ Uniform Construction Code NJ Uniform Construction Code defines the model codes to be used in NJ Note: The State of New Jersey makes its own modifications to the model codes 11/10/2014 © Carl E. Peters

Where do I submit the plans for review? It Depends? Local Enforcing Agency County Enforcing Agency Inter-local Enforcing Agency NJ Department of Community Affairs Other? 11/10/2014 © Carl E. Peters

What do I need to submit? Two sets of plans and specifications Buff File Jacket with certifications Building Technical Form Electrical Technical Form Plumbing Technical Form Fire Protection Technical Form Mechanical Technical Form Elevator Technical Form Other 11/10/2014 © Carl E. Peters

Obtain Prior Approvals Zoning Water Supply Sewage Disposal Electric Service Gas Service Street Opening Other 11/10/2014 © Carl E. Peters

How long will it take to issue a permit? Agency reviews plans within 20 business days May deny application or request additional information Failure to act equals denial Issues Permits If you start construction before receiving the required permits you will be fined. 11/10/2014 © Carl E. Peters

After Permits are issued Call for utility mark-outs Notify inspection agency before starting construction Other 11/10/2014 © Carl E. Peters

Inspections During Construction Footings Foundation Location Survey by PLS Framing Insulation Rough and Final Plumbing and Electric Final 11/10/2014 © Carl E. Peters

Request Certificate of Occupancy Obtain Form - Request for Certificate Submit Form to Enforcing Agency Agency Has 10 business days to act If you occupy before receiving a certificate of occupancy you will be fined. 11/10/2014 © Carl E. Peters

Statutes and Regulations N.J.S.A. – NJ Statutes Annotated Created by Legislature Signed by Governor Rules and Regulations N.J.A.C. – NJ Administrative Code Created by State Departments Community Affairs Publication in NJ Register 11/10/2014 © Carl E. Peters

The Rest of the Story 11/10/2014 © Carl E. Peters

CONSTRUCTION CODE ACT The Statute creating a statewide construction code Effect of Code Promulgation All other local regulations are superseded Does not invalidate local zoning ordinances Does not invalidate local licensing of construction trades Unless already licensed by State 11/10/2014 © Carl E. Peters 68

New Jersey Uniform Construction Code Act Enabling Legislation Purpose for creating a UCC Establishing of Subcodes Sets standards for training and qualifications of code officials Establishes powers of the Commissioner Organization of Local Enforcing Agencies Mechanism for appeals 11/10/2014 © Carl E. Peters

Regulations Administrative Code Created by Commissioner Augments the statute May not contradict the statute 11/10/2014 © Carl E. Peters

New Jersey Uniform Construction Code (UCC) Regulations How to obtain a permit under the NJ Uniform Construction Code When permits are necessary Who can prepare plans What inspections are required Prior approvals Obtaining a Certificate of Occupancy 11/10/2014 © Carl E. Peters

New Jersey Uniform Construction Code (UCC) Regulations Types of Enforcing Agencies Requirements for Code Licensing Adoption and modification of model codes Barrier Free Access Requirements Requirements for Existing Buildings Playground Safety Regulations 11/10/2014 © Carl E. Peters

UNIFORM CONSTRUCTION CODE REGULATIONS – NJAC 5:23-1 et seq Effective Date: January 1, 1977 Promulgated by Commissioner of the Department of Community Affairs (DCA) With guidance from Code Advisory Board 11/10/2014 © Carl E. Peters

Uniform Construction Code Subchapter 1 – General Provisions Subchapter 2 – Administration and Enforcement; Process Subchapter 3 – Subcodes Subchapter 4 – Enforcing Agencies; Duties; Powers; Procedures Subchapter 5 – Licensing of Code Enforcement Officials 11/10/2014 © Carl E. Peters 74

Uniform Construction Code Subchapter 6 – Rehabilitation Subcode Subchapter 7 – Barrier Free Subcode Subchapter 8 – Asbestos Hazard Abatement Subcode Subchapter 9 – Code Interpretations Subchapter 10 – Radon Hazard Subcode Subchapter 11 – Playground Safety Subcode Subchapter 12 – Elevator Safety Subcode 11/10/2014 © Carl E. Peters 75

Subchapter 1 – General Provisions Intent and Purpose Encourage innovation and economy in construction Provide standards for construction and materials in conformance with nationally recognized standards Performance is the test for acceptability Permit use of modern methods of construction Eliminate restrictive, obsolete, conflicting and unnecessary regulations Eliminate duplication of effort and fees in plan review and inspection 11/10/2014 © Carl E. Peters 76

Subchapter 1 – General Provisions Important Definitions Alteration Building Building Subcode Official Certificate of Continued Occupancy Certificate of Occupancy Construction Permit Department 11/10/2014 © Carl E. Peters 77

Subchapter 1 – General Provisions Important Definitions (cont’d) Enforcing Agency Maintenance Minor work Ordinary Maintenance Owner Plans and Specifications Primary Function Space 11/10/2014 © Carl E. Peters 78

Subchapter 1 – General Provisions Important Definitions (cont’d) Prior Approvals Private on-site Inspection and plan review agency Reconstruction Rehabilitation Renovation Repair Small Job 11/10/2014 © Carl E. Peters 79

Subchapter 1 – General Provisions Important Definitions (cont’d) Stop Construction Order Tenancy Use 11/10/2014 © Carl E. Peters 80

Subchapter 1 – General Provisions Effective Date January 1, 1977 No other codes are in effect Grace Period Six Months After A Subcode Revision Complete Application All Prior Approvals Met 11/10/2014 © Carl E. Peters 81

NJ UNIFORM CONSTRUCTION CODE Subchapter 4 – Enforcing Agencies; Duties; Powers; Procedures 11/10/2014 © Carl E. Peters 82

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.1 this section controls the structure, organization and procedures of state local and inter-local enforcing agencies. It also governs the structure, organization and procedures for boards of appeals. It governs private enforcing agencies and how fees are established 11/10/2014 © Carl E. Peters 83

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.3 ESTABLISHING MUNICIPAL AGENCY CERTIFIED NOTICE GIVEN TO DCA RESOLUTION BY GOVERNING BODY STAFF OR PRIVATE AGENCIES WHO WILL HEAR APPEALS IF LOCALS DON’T WANT TO ENFORCE, DCA WILL ENFORCING AGENCY MUST BE ESTABLISHED BY ORDINANCE ORDINANCE ESTABLISHES POSITIONS ORDINANCE SETS FEES 11/10/2014 © Carl E. Peters 84

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.3 CONTINUED DEPARTMENTAL INTERVENTION IF LOCALS AREN’T DOING JOB DCA SENDS NOTICE TO GOVERNING BODY CONSTRUCTION OFFICIAL ADMINISTRATOR/MANAGER DCA COULD DISSOLVE LOCAL AGENCY DCA CAN SUPPLANT A LOCAL AGENCY FOR A SPECIFIC PROJECT 11/10/2014 © Carl E. Peters 85

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.3A Enforcing Agency Classification RCS – Class 3 ICS – Class 2 HHS – Class 1 Determined by the highest class of structure for which the lowest level Subcode Official or the Construction Official is authorized to review plans 11/10/2014 © Carl E. Peters 86

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.3A (d) Establishes what size and classification that each type of agency may perform plan review on Based Upon Use Groups in Building Code (e) DCA may return plans to a lower level agency for review Agencies may perform inspections on all classes of buildings 11/10/2014 © Carl E. Peters 87

IBC Use Groups – Chapter 3 Assembly Business Educational Factory and Industrial High Hazard Institutional Mercantile Residential Storage Utility and Miscellaneous 11/10/2014 © Carl E. Peters

Building Design Services Act NJSA 45B:7 Identifies which categories of buildings, or portions of buildings may be designed by a Professional Engineer Architects may design any use group, except “Engineering Works” Based upon Building Code Use Groups 11/10/2014 © Carl E. Peters

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.4 Municipal Agency Organization Construction Official – Chief administrator – establishes operating routines and coordinates subcodes – Must hold at least one subcode license – Must be appointed as a local official (employee) 11/10/2014 © Carl E. Peters 90

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.4 Municipal Agency Organization Subcode Official – Exclusive decision making authority for the technical provisions of his Subcode. Municipality may contract with private agencies for Subcode Official services Inspectors Technical Assistant 11/10/2014 © Carl E. Peters 91

UCC SUBCHAPTER 4 ENFORCING AGENCIES N.J.A.C. 5:23-4.5 Filing System Required Standard Forms 11/10/2014 © Carl E. Peters

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.14 Private On-site agencies May hire inspectors or Subcode Officials part time A Municipal Construction Official may not be hired by a Private Agency 11/10/2014 © Carl E. Peters 93

UCC SUBCHAPTER 4 ENFORCING AGENCIES 5:23-4.17 Municipal Agency Fees Set by ordinance Construction Official must prepare Annual Report of receipts and expenses Fee Schedule shall cover cost of operating the agency but should be used only for code enforcement purposes New construction based on volume Renovations based on cost Other Subcodes based upon fixtures 11/10/2014 © Carl E. Peters 94

UCC SUBCHAPTER 4 ENFORCING AGENCIES State Enforcing Agencies Bureau Of Local Code Enforcement Enforces UCC In Municipalities That Have Chosen Not To Have A Local Agency 11/10/2014 © Carl E. Peters

NJ UNIFORM CONSTRUCTION CODE Subchapter 5 – Licensing of Code Enforcement Officials 11/10/2014 © Carl E. Peters 96

Subchapter 5 – Licensing of Code Enforcement Officials 5:23-5.3 Types Of Licenses Inspectors Building Inspectors have HHS, ICS, RCS the other Subcodes only have ICS and HHS License level indicates plan review authority – All inspectors are allowed to inspect all types of buildings 11/10/2014 © Carl E. Peters 97

Subchapter 5 – Licensing of Code Enforcement Officials 5:23-5.3 (a) 4. -Special Inspectors Structural Welding Structural Steel And Bolting Concrete Placement Reinforced Concrete Prestressed Concrete Structural Masonry Spray Applied Fire Proofing Exterior Insulation Finish Systems 11/10/2014 © Carl E. Peters 98

Subchapter 5 – Licensing of Code Enforcement Officials 5:23-5.6 Construction Official Requirements Hold at least one Subcode License Experience Per NJSA 52:27d-126b Complete an approved CO Training Course 11/10/2014 © Carl E. Peters 99

Subchapter 5 – Licensing of Code Enforcement Officials 5:23-5.7 Subcode Official Requirements Have A Technical Inspector License Complete a Subcode Training Program Experience 10 Years as a journeyman, inspector or contractor currently regulated by the code 5 Years experience plus a Bachelor’s Degree in architecture or engineering or similar area of study 3 Years experience plus a PE or RA in NJ 11/10/2014 © Carl E. Peters 100

Subchapter 5 – Licensing of Code Enforcement Officials 5:23-5.25 Revocation Of Licenses Violated UCC Got license through fraud Gross Negligence Failed to report an offer of a bribe or favor Has failed to comply with an order of the department 11/10/2014 © Carl E. Peters 101

NJ UNIFORM CONSTRUCTION CODE SUBCHAPTER 2 – ADMINISTRATION AND ENFORCEMENT; PROCESS 11/10/2014 © Carl E. Peters 102

5:23 – 2.1 Title, Scope, Intent Controls all construction, alteration, addition, repair removal, demolition, use, location and occupancy of all buildings and structures and service equipment Covers both existing and proposed To insure public safety, health and welfare 11/10/2014 © Carl E. Peters 103

5:23 – 2.2 Matter Covered Applies to all buildings and appurtenances No building may be constructed, renovated or altered or demolished in violation of the code If it is not specified in the code the subcode official and construction official may make a determination Use or occupancy without approval is a violation and subject to penalty 11/10/2014 © Carl E. Peters 104

5:23 – 2.2 Matter Covered No municipal code may conflict with regard to structural, fire and sanitary safety For use, location, permissible area and height, the more restrictive of UCC or local zoning code will govern 11/10/2014 © Carl E. Peters 105

5:23 – 2.3 Applicability Applies to all construction performed after the date of the regulations 11/10/2014 © Carl E. Peters 106

5:23 – 2.4 Alterations, Replacements & Damages Work on existing structures shall conform to rehabilitation subcode Work on a building damaged by fire or any other cause shall be governed by rehabilitation subcode Work required by a housing, fire or maintenance code shall be governed by that code unless referred back to UCC 11/10/2014 © Carl E. Peters 107

5:23 – 2.5 Increase in Size If the building is increased in size the new area shall conform to the standards for new construction Work in the old area is governed by the rehabilitation subcode 11/10/2014 © Carl E. Peters 108

5:23 – 2.6 Change of Use Legal existing uses may continue Change of use requires a new c/o A change of use may be defined differently in the zoning code than in the UCC 11/10/2014 © Carl E. Peters 109

5:23 – 2.7 Ordinary Maintenance Ordinary maintenance may be performed without a permit or giving notice to the construction official Does not include: Cutting of wall or partition Removal or cutting a beam or bearing support Change or removal of a means of egress Work affecting fire or structural safety Work that will increase building non-conformity 11/10/2014 © Carl E. Peters 110

5:23 – 2.7 Ordinary Maintenance Does not include Addition, Alteration, Replacement Or Relocation Of: Standpipe Water, Sewer, Gas, Drainage 11/10/2014 © Carl E. Peters 111

5:23 – 2.8 Installation of Equipment Equipment may not be used until a certificate of occupancy or certificate of approval is issued 11/10/2014 © Carl E. Peters 112

5:23 – 2.9 Variations and Exceptions May be granted when: Strict compliance would result in practical difficulty An exception, if granted will not jeopardize the health, safety and welfare of occupants and the public 11/10/2014 © Carl E. Peters 113

5:23 – 2.10 Applications for Variations Must be filed in writing and state: Code requirement from which a variation is sought How strict compliance would result in practical difficulties Nature of difficulty Feasible alternative which adequately protects health, safety and welfare 11/10/2014 © Carl E. Peters 114

5:23 – 2.11 Review of Variation Applications Time for review: 20 days Considered denied if not acted upon 11/10/2014 © Carl E. Peters 115

5:23 – 2.12 Final Decision on Variations Determination is made by appropriate Subcode Official 11/10/2014 © Carl E. Peters 116

5:23 – 2.13 Authority to Grant Variations The agency with plan review responsibility has sole authority to grant variations 11/10/2014 © Carl E. Peters 117

5:23 – 2.14 Construction Permits – Where Required Must apply for and receive a permit prior to starting construction, except: ordinary repairs minor work emergency work some temporary structures garden type sheds under 100 sq. ft. in area and less than 10’ high fences 6’ or less in height 11/10/2014 © Carl E. Peters 118

5:23 – 2.14 Construction Permits – Where Required Permits required for retaining walls – or a series of walls Total height of 4’ or greater Wall less than 4’ impacting a foundation There is an exception for walls intended to be dedicated to the municipality and subject to regulation, inspection and issuance of bonds 11/10/2014 © Carl E. Peters 119

5:23 – 2.15 Construction Permits - Application Standard Forms Buff Jacket Certifications Owner Homeowner’s Warranty Plan Preparation Perform or Supervise Building & Fire Perform Plumbing & Electrical Prior Approvals 11/10/2014 © Carl E. Peters 120

5:23 – 2.15 Construction Permits - Application Standard Forms Buff Jacket Certifications Agent Homeowner Authorization Prior Approvals Taxation 11/10/2014 © Carl E. Peters 121

5:23 – 2.15 Construction Permits - Application Standard Forms Technical Sections Building Electrical Fire Plumbing Elevator Mechanical 11/10/2014 © Carl E. Peters 122

5:23 – 2.15 Construction Permits - Application Description of proposed work Use group classification Type of construction Building area and volume Fixture counts Cost estimate Certification of prior approvals 11/10/2014 © Carl E. Peters

5:23 – 2.15 Construction Permits - Application List of special inspections for class 1 structures Required prior to starting construction Names and addresses of contractors Builders registration info for one or two family dwelling, condo or co-op, except built by the owner Seal of licensed plumber or electrician 11/10/2014 © Carl E. Peters

5:23 – 2.15 Construction Permits - Application Separate application required for each building Application may be made by owner or his agent – contractor, engineer architect, etc. 11/10/2014 © Carl E. Peters

5:23 – 2.15 Construction Permits - Application Plans and specifications Two sets minimum Sufficient clarity and detail to show nature and character of work Information necessary to demonstrate code compliance Subcode official determines what’s necessary 11/10/2014 © Carl E. Peters

5:23 – 2.15 Construction Permits - Application Site diagram In accordance with accurate boundary survey Show existing and proposed structures and structures to be demolished Protection of adjacent structures 11/10/2014 © Carl E. Peters

5:23 – 2.15 Construction Permits - Application Who May Prepare Drawings Architect Engineer Electrician – Class 3 Buildings only Plumber - Class 3 Buildings only Mechanical Contractor - Class 3 Buildings only Homeowner – Single Family Owner Occupied 11/10/2014 © Carl E. Peters

5:23 – 2.16 Construction Permits - Procedure To be reviewed within 20 business days If denied reasons must be in writing If agency fails to act it’s considered a denial Resubmissions must be reviewed in seven business days 11/10/2014 © Carl E. Peters 129

5:23 – 2.16 Construction Permits - Procedure Suspension of permit Invalid if work doesn’t commence within 12 months Invalid if work is suspended or abandoned for six months after commencement 11/10/2014 © Carl E. Peters

5:23 – 2.16 Construction Permits - Procedure Revocation of permit If applicant provided false information in application or plans If project is not completed within 3 years, except Interior improvement not visible from outside Where exterior work and site improvements are complete 11/10/2014 © Carl E. Peters

5:23 – 2.16 Construction Permits - Procedure Permit must be posted on site 24 hour notice to construction official Conditions of permit Payment of fees Conformance to code & prior approvals Assist enforcing agency 11/10/2014 © Carl E. Peters

5:23 – 2.17 Demolition or Removal of Structures Releases from utilities Notices to adjoining owners 11/10/2014 © Carl E. Peters 133

5:23 – 2.17A Minor Work Work may proceed without permit Notice must be given to enforcing agency prior to starting work Application must be made within five days of notice Inspections must be made within 30 days of request 11/10/2014 © Carl E. Peters 134

5:23 – 2.18 Inspections During progress of work Where work must cease Bottom of footings Foundation walls prior to backfilling Foundation location survey required for new construction Utility services Structural framing, connections, wall and roof sheathing and insulation 11/10/2014 © Carl E. Peters 135

5:23 – 2.18 Inspections During progress of work Where work must cease Rough electrical –wiring, panel and service Rough plumbing – piping Mid point building inspections must include compliance with barrier free subcode 11/10/2014 © Carl E. Peters 136

5:23 – 2.18 Inspections Owner/ contractor to call for inspections at least 24 hours in advance Inspections to be made within 3 business days Final inspections Required prior to requesting certificate of occupancy 11/10/2014 © Carl E. Peters

5:23 – 2.19 Special Technical Services Reports from professional engineer or registered architect Provided at applicant’s expense Site investigation Structural analysis Building systems analysis 11/10/2014 © Carl E. Peters 138

5:23 – 2.20 Tests and Special Inspections 11/10/2014 © Carl E. Peters 139

5:23 – 2.21 Construction Control 11/10/2014 © Carl E. Peters 140

5:23 – 2.23 Certificate Requirements Certificate of occupancy required prior to use or occupancy of new building or reconstructed building Certificate of approval required prior to occupancy of a renovated or altered building A Certificate Of Occupancy is required prior to use or occupancy of a building addition 11/10/2014 © Carl E. Peters 141

5:23 – 2.23 Certificate Requirements Temporary Certificate of Occupancy Bulletin 01-02 11/10/2014 © Carl E. Peters

5:23 – 2.23 Certificate Requirements Application for certificate Statement by person in responsible charge that work has been completed in accordance with the permit and regulations Final cost of the work Amended drawings Test and balance report for mechanically ventilated buildings 11/10/2014 © Carl E. Peters

5:23 – 2.23 Certificate Requirements Certificate to be issued within 10 business days Certificate may be revoked if a condition of the certificate is violated Must maintain code compliance 11/10/2014 © Carl E. Peters

5:23 – 2.24 Conditions of Certificate of Occupancy Project Meets Conditions Of Construction Permit, All Prior Approvals And Is Substantially In Conformance With Code, Plans And Specifications All Fees Have been Paid All Required Inspections Have Been Passed 11/10/2014 © Carl E. Peters 145

5:23 – 2.24 Conditions of Certificate of Occupancy All Violations Have Been Corrected All Protective Devices are Operational New Home Warranty Provided Affidavit By Homeowner when any design, construction, electrical or plumbing work has been done by owner and a Warranty is Not Provided 11/10/2014 © Carl E. Peters

5:23 – 2.29 Entry Owner is deemed to have consented to inspection of entire premises until a c of o has been issued 9am to 5pm, business days Whenever construction is being undertaken When a dangerous condition exists 11/10/2014 © Carl E. Peters 147

5:23 – 2.30 Violation, Notice, and Orders Notice of violation and order to terminate Issued when a violation of regulations, permit or certificate exists Citation of section violated Time to correct Penalty assessed, if any 11/10/2014 © Carl E. Peters 148

5:23 – 2.31 Compliance Penalties issued for: Violations of the act or regulations Performing construction in violation of a condition of a permit Failing to comply with an order Making a false or misleading statement Refusing entry or interfering with an inspection 11/10/2014 © Carl E. Peters 149

5:23 – 2.31 Compliance Failing to obey an order Stop construction Each day is a separate offense Others Each week is a separate offense Construction in violation of a building permit condition Each violation is a separate offense 11/10/2014 © Carl E. Peters

5:23 – 2.31 Compliance Penalties not to be levied until after issuance of a notice of violation and expiration of the period to correct, except, Penalties must be issued immediately for: Failure to obtain a construction permit Failure to request required inspections Occupying without a certificate of occupancy 11/10/2014 © Carl E. Peters

5:23 – 2.31 Compliance Stop Construction Order Must Be In Writing State The Reasons For Issuance Establish Condition For Resuming Construction 11/10/2014 © Carl E. Peters

5:23 – 2.31 Compliance Penalty amounts Failure to comply with an order Up to $1000 per violation Up to $2000 for violations done with the knowledge that it will endanger the life or safety of any person Failure to obtain a permit or occupying without a certificate of occupancy Up to $2000 per violation 11/10/2014 © Carl E. Peters

5:23 – 2.31 Compliance Penalty amounts Failure to comply with a stop construction order Up to $2000 per violation Making a false or misleading statement All other violations Up to $500 per violation 11/10/2014 © Carl E. Peters

5:23 – 2.32 Unsafe Structures Buildings that are unsafe, unsanitary, contain blocked exits, constitute a fire hazard, or otherwise dangerous to human life or the public welfare or by illegal use or occupancy Shall be made safe, or Taken down 11/10/2014 © Carl E. Peters 155

5:23 – 2.32 Unsafe Structures Notice of unsafe structure Issued by construction official Specifies required repairs Sets time period for: Vacation Repair Demolition Building must be posted 11/10/2014 © Carl E. Peters 156

5:23 – 2.32 Unsafe Structures Emergency Measures – In Cases Of Immediate Danger Of Failure Or Collapse Vacate Building Immediately Perform Repairs To Make Building Temporarily Safe Including Demolition After 24 Hours Notice To Owner Close Streets Cost Of Emergency Repairs Paid By Municipality – Recovered From Property Owner 11/10/2014 © Carl E. Peters

5:23 – 2.33 Service of Notice 11/10/2014 © Carl E. Peters 158

UCC SUBCHAPTER 3 - SUBCODES 5:23-3.1 controls Adoption of subcodes Modification of subcodes Organization of enforcement responsibilities Standards of accepted practice Division of plan review responsibilities State reserved activities 11/10/2014 © Carl E. Peters 159

UCC SUBCHAPTER 3 SUBCODES 5:23-3.2 This subchapter applies uniformly throughout the state – no other standards have effect 5:23-3.3 Appropriate subcode official is to enforce subcode and answer technical questions 11/10/2014 © Carl E. Peters 160

UCC SUBCHAPTER 3 SUBCODES 5:23-3.4 Division of responsibilities Plan review Inspection Where there is joint responsibility for review of a code section and there is a dispute between Subcode Officials, the Construction Official chooses. 11/10/2014 © Carl E. Peters 161

UCC SUBCHAPTER 3 SUBCODES 5:23-3.5 posting structures Posted use and occupancy Posted occupancy load Emblems for truss construction F – floor trusses R – roof trusses F/R – both floor and roof trusses 11/10/2014 © Carl E. Peters 162

UCC SUBCHAPTER 3 SUBCODES 5:23-3.6 Subchapter 3 along with specified model codes is the primary guide to accepted engineering practice When the subchapter and national standards are silent, manufacturer’s recommendations may be taken - but may not overrule the code. 11/10/2014 © Carl E. Peters 163

UCC SUBCHAPTER 3 SUBCODES 5:23-3.7 Alternative Materials, Equipment Or Methods Of Construction OK If Design And Materials Are Satisfactory For Intended Use Field Evaluation Label Or Report From A National Testing Lab Reports From Nationally Recognized Evaluation Service Programs Applicant Must Supply Sufficient Technical Data 11/10/2014 © Carl E. Peters 164

UCC SUBCHAPTER 3 SUBCODES 5:23-3.8 Products violating the code list set forth in (D) 5:23-3.9 Interpretations and opinions Code Interpretations Commissioner’s rulings are binding Prospective in nature Does not overrule the Subcode Official who has already ruled 11/10/2014 © Carl E. Peters 165

UCC SUBCHAPTER 3 SUBCODES 5:23-3.9 Formal Technical Opinions Issued By Const. Code Element To Clarify A Code Provision Signed By Asst. Director Binding Upon DCA And Local Agencies Prospective In Nature Does Not Overrule A Decision By A Subcode Official May Be Considered In Context Of An Appeal 11/10/2014 © Carl E. Peters 166

UCC SUBCHAPTER 3 SUBCODES 5:23-3.9 Bulletins Issued by Const. Code Element Advice to agencies, builders and designers Must consult with Code Advisory Board first Informal Opinions Issued by DCA staff – only in writing if the request is in writing 11/10/2014 © Carl E. Peters 167

UCC SUBCHAPTER 3 SUBCODES 5:23-3.11 Activities Reserved To The Department Electrical Generating Stations Incineration Plants Solid Waste Disposal Plants Class 1 & 2 Structures If Local Agency Is Not Authorized Casino Hotels Health Care Facilities Public School Facilities Prototype Plans For Use In More Than One Municipality 11/10/2014 © Carl E. Peters 168

UCC SUBCHAPTER 3 SUBCODES 5:23-3.11 Activities Reserved To The Department (C)- Local Agency May Not Issue Permit Until DCA Releases Plans If DCA Says A Violation Exists, Locals Can’t Issue C/O DCA Responsible For Barrier Free Recreation Standards DCA Responsible For Enforcement Of Playground Safety Subcode Amusement Rides And Ski Lifts 11/10/2014 © Carl E. Peters 169

UCC SUBCHAPTER 3 SUBCODES 5:23-3.12 When rules are modified it must be published in the NJ Register 5:23-3.14 Building Subcode Establishes IBC 2009 as model code modifies some sections of IBC 2009 5:23-3.14 5:23-3.15 Plumbing Subcode Establishes National Standard Plumbing Code - 2009 as model code Modifies some sections of NSPC 2009 11/10/2014 © Carl E. Peters 170

UCC SUBCHAPTER 3 SUBCODES 5:23-3.16 Establishes National Electric Code 2008 as the model code Makes revisions to NEC 2008 5:23-3.17 Fire Protection Subcode 5:23-3.18 Energy Subcode 5:23-3.20 Mechanical Subcode 11/10/2014 © Carl E. Peters 171

UCC SUBCHAPTER 3 SUBCODES 5:23-3.21 One & Two Family Subcode Detached one or two family dwellings Single Family Townhouses Group R-5 Not more than 3 stories high 5:23-3.22 Fuel Gas Subcode 11/10/2014 © Carl E. Peters

UCC SUBCHAPTER 7 - BARRIER FREE SUBCODE 5:23-7.1 Applicability Requires access to sites and buildings (unless exempted) for occupants, employees, students consumers, spectators, etc. 5:23-7.2 Accessibility Standard Model code ICC/ANSI A117.1- 2003 As modified by Subchapter 7 11/10/2014 © Carl E. Peters 173

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE 5:23-7.3 EXCEPTIONS Temporary structures and equipment associated with the construction process Areas of buildings where work cannot be reasonably performed by people with significant impairment 11/10/2014 © Carl E. Peters 174

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE 5:23-7.3 Exceptions Continued Residential Buildings Townhouses - But Not Townhouses For Which COAH Credit Is Sought – Note Definition Of Townhouse R-2, R-3, R-4 OR R-5 With Up To 3 Units In A Building Common Use Facilities Must Be Accessible 11/10/2014 © Carl E. Peters 175

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE 5:23-7.3 Non-residential use groups and R1 Small Buildings Total gross floor area under 10000 sf One accessible 1st floor entrance Accessible interior building features on all floors On more than 2 story bldg an elevator is required Public buildings must have elevator Transit buildings must have elevator Offices of health care providers must have elevator Shopping centers must have elevator 11/10/2014 © Carl E. Peters 176

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE 5:23-7.3 Non-residential Use Groups And R-1 Large Buildings 10000 sf or more Elevator required 11/10/2014 © Carl E. Peters 177

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE Buildings separated by fire walls with penetrations intended for human passage shall not constitute separate buildings Accessible routes shall not pass through kitchens, storage rooms or similar spaces 11/10/2014 © Carl E. Peters 178

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE 5:23-7.7 Exterior Accessible Routes Includes parking, curb aisles, curb ramps, walks or ramps 5:23-7.8 Accessible Building Entrances 50% must be accessible 11/10/2014 © Carl E. Peters 179

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE 5:23-7.10 Accessible parking Must be the closest spaces on the shortest route to an accessible entrance For buildings with multiple entrances, parking must be dispersed One of eight spaces must be van accessible For medical out-patient facilities 10% must be accessible 11/10/2014 © Carl E. Peters 180

UCC SUBCHAPTER 7 BARRIER FREE SUBCODE 5:23-7.13 Existing Facilities Must comply with the Rehabilitation Subcode – Subchapter 6 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Applies to work in existing buildings Changing a use in an existing building Additions on existing buildings Based upon type of work done rather than extent of work 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Repair Renovation Alteration Reconstruction Change of Use Additions 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Repair 5:23-6.4 List of prohibited materials May or may not require a permit 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Renovation List of prohibited materials Installation of smoke alarms in R-3 and R-5 buildings Materials and Methods per 5:23-6.8 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Alteration 5:23-6.3 List of prohibited materials Installation of smoke alarms in R-3 and R-5 buildings Materials and Methods per 5:23-6.8 Alterations involve reconfiguration of a portion of the building Basic Requirements per 5:23-6.10-6.30 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Alteration 5:23-6.3 New Building elements per 5:23-6.9 Accessibility Improvements per 5:23-6.6 (e) and (j) 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Reconstruction Extent of work makes it a reconstruction A reconstruction may include repair, renovation and/or alteration work Reconstruction is triggered when a project may not be occupied during the work and a new certificate of occupancy is required. 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Reconstruction Delineated Work Area Established by applicant Involves an entire use, primary function space or tenancy Basic Requirements organized by use group 5:23 6.12 – 6.28 Supplemental requirements 5:23-6.10 -6.30 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Changes of Use Often but not always requires some construction Defined by levels of hazard and safety requirements Parking requirements may change Accessibility requirements may change 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Changes of Use Hazard Groups Basic Requirements - Table B Means of Egress – Table C Enclosure of Vertical Openings – Table E Exposure of Exterior Walls – Table F Automatic Sprinkler Systems – Table G Structural Load Categories – Table K 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Additions Required to conform to current codes Work in existing building related to addition must comply with 5:23-6.33 May not increase any non-conformity in existing building Historic Buildings 5:23-6.33 11/10/2014 © Carl E. Peters

UCC Subchapter 6 – Rehabilitation Subcode Bulletin 98-1 Rehab Code Matrix 11/10/2014 © Carl E. Peters

UCC Subchapter 11– Playground Safety Subcode Play area for six or more children Not athletic playing fields or courts No UCC permit is required Compliance is the responsibility of the owner and manager of the facility Complaints not satisfied will be referred to DCA 11/10/2014 © Carl E. Peters

Construction Boards of Appeal Each county must have one Municipalities may have one Hear cases from persons aggrieved by actions of local enforcing agency per ucc or ufc County boards hear escrow fee disputes 11/10/2014 © Carl E. Peters

Construction Boards of Appeal Membership Plumbing Subcode Official Electrical Subcode Official Architect or Engineer or Building Subcode Fire Protection Subcode Official Fire Prevention Official 11/10/2014 © Carl E. Peters

Construction Boards of Appeal Special Members – County Boards Only PE with site construction experience Builder Serve only for cases involving municipal or municipal utilities authority fees 11/10/2014 © Carl E. Peters

Subdivision "Subdivision" means the division of a lot, tract or parcel of land into two or more lots, tracts, parcels or other divisions of land for sale or development. 11/10/2014 © Carl E. Peters

Subdivision "Major subdivision" means any subdivision not classified as a minor subdivision. "Minor subdivision" means a subdivision of land for the creation of a number of lots specifically permitted by ordinance as a minor subdivision; provided that such subdivision does not involve (1) a planned development, (2) any new street or (3) the extension of any off-tract improvement, the cost of which is to be prorated pursuant to section 30 of P.L.1975, c.291 (C.40:55D-42). 11/10/2014 © Carl E. Peters

Not a subdivision The following shall not be considered subdivisions within the meaning of this act, if no new streets are created: (1) divisions of land found by the planning board or subdivision committee thereof appointed by the chairman to be for agricultural purposes where all resulting parcels are 5 acres or larger in size, (back) 11/10/2014 © Carl E. Peters

Not a subdivision (2) divisions of property by testamentary or intestate provisions, (3) divisions of property upon court order, including but not limited to judgments of foreclosure, (4)consolidation of existing lots by deed or other recorded instrument and, 11/10/2014 © Carl E. Peters

Not a subdivision (5) the conveyance of one or more adjoining lots, tracts or parcels of land, owned by the same person or persons and all of which are found and certified by the administrative officer to conform to the requirements of the municipal development regulations and are shown and designated as separate lots, tracts or parcels on the tax map or atlas of the municipality. 11/10/2014 © Carl E. Peters

Site Plan "Site plan" means a development plan of one or more lots on which is shown (1) the existing and proposed conditions of the lot, including but not necessarily limited to topography, vegetation, drainage, flood plains,marshes and waterways, (2) the location of all existing and proposed buildings, drives, parking spaces, walkways, means of ingress and egress, drainage facilities, utility services, landscaping, structures and signs, lighting, screening devices, and (3) any other information that may be reasonably required in order to make an informed determination pursuant to an ordinance requiring review and approval of site plans by the planning board adopted pursuant to article 6 of this act. 11/10/2014 © Carl E. Peters

Site Plan "Minor site plan" means a development plan of one or more lots which (1) proposes new development within the scope of development specifically permitted by ordinance as a minor site plan; (2) does not involve planned development, any new street or extension of any off-tract improvement which is to be prorated pursuant to section 30 of P.L.1975, c.291 (C.40:55D-42); and (3) contains the information reasonably required in order to make an informed determination as to whether the requirements established by ordinance for approval of a minor site plan have been met. (Back) 11/10/2014 © Carl E. Peters

Conditional Use Authorization "Conditional use" means a use permitted in a particular zoning district only upon a showing that such use in a specified location will comply with the conditions and standards for the location or operation of such use as contained in the zoning ordinance, and upon the issuance of an authorization therefor by the planning board. (Back) 11/10/2014 © Carl E. Peters

Variance "Variance" means permission to depart from the literal requirements of a zoning ordinance pursuant to section 47 and subsection 29.2b., 57c. and 57d. of this act. 11/10/2014 © Carl E. Peters

Bulk Variances per NJSA 40:55D-70 c C(1) – Hardship C(2) – Flexible 11/10/2014 © Carl E. Peters

11/10/2014 © Carl E. Peters

Carl E Peters, PE, PLS, PP, CO 4525 Route 27 Princeton, NJ 08540, 609.751.4104 cpeters@carlepeters.com www.carlepeters.com 11/10/2014 © Carl E. Peters