Keith Godwin Alachua County E911 Coordinator 1. Construction Maintenance UPS failures Power interruptions and outages CPE Service providers equipment.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Repaso: Unidad 1 Lección 2
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
1 Hyades Command Routing Message flow and data translation.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Human Service Providers and Referrals Chapter 5. Human Service Providers and Referrals 5-2 Objectives Demonstrate the process for entering a Human Service.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
PUBLIC KEY CRYPTOSYSTEMS Symmetric Cryptosystems 6/05/2014 | pag. 2.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
1 Daily ATM/Debit Maintenance through CU*BASE A Preview of ATM and Debit Card Maintenance Screens Prepared June 24, 2009.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1 Section 5.5 Dividing Polynomials Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 Presenter: Josh Stuckey, Manager Harris County Permits Northwest Freeway Suite 120 Houston, Texas
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Subtraction: Adding UP
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Keith Godwin Alachua County E911 Coordinator 1

Construction Maintenance UPS failures Power interruptions and outages CPE Service providers equipment failures Downed power lines 2

Radio CAD Telephone; GIS; ANI/ALI Recording UPS Generator Power 3

When does the warranty expire? What is the cost for extended warranty? Is there a maintenance agreement? When does it expire? What is the backup plan for a failure? Is the plan in writing? Is the plan exercised periodically? 4

November Wednesday, February 11 th 2009 Friday, March 6 th 2009 Sunday, March 29 th 2009 Tuesday, March 31 st 2009 Friday, May 15 th 2009 Tuesday, May 26 th

UPS maintenance agreement expired Power outage resulted in the loss of all systems CAD, radio, recording, phone Backup generator came on but power to all these systems was interrupted thus shutting them all down at once 6

TRS went into failsoft No plan No procedures No practice No protocols Pure panic 7

Backhoe cuts Windstream fiber 7,000+ Wireless, wireline, public safety communications (20%) 9 hours Call takers X4 & 1 MCV DRP not current 8

Momentary hiccup All phones momentarily blinked off UTA what else blinked? (very important information!) AT&T and CenturyLink UTL problem 9

Power outage in area due to thunderstorm 911 and administrative lines impacted CAD & radio up Backup PSAP occupied for 911 call taking Dispatch remained at primary PSAP Administrative lines up at primary PSAP 10

Power outage in area due to thunderstorm 911 and administrative lines impacted CAD and radio up Backup PSAP occupied for 911 call taking Dispatch remained at primary PSAP Administrative lines up at primary PSAP 11

Power outage in area due to thunderstorm 911 and administrative lines impacted CAD and radio up Backup PSAP occupied for admin and 911 call taking Dispatch remained at primary PSAP No administrative lines in PSAP 12

Power outage in area 911 and administrative lines impacted CAD and radio up Backup PSAP occupied for admin and 911 call taking Dispatch remained at primary PSAP No administrative lines in primary PSAP 13

14 UPS Batteries

You do not have enough funding to offset every possible outage…but you should conduct a vulnerability assessment and determine the most affordable means available to reduce your exposure to failures and be in constant pursuit of hardening your facility 15

Annual Letters DRP’s/PSAP Profile Redundant Telephone Routes Redundant Electric Power Routes Critical & Important Tickler Important/Emergency Contacts & Escalation Lists PSAP Evacuation Kit Backup Power Problem Reporting CPE Maintenance & Maintenance Agreements Administrative Phone Lines TSP PSAP Information Backup PSAP Alternate Means of Communication 16

17

From AT&T From Windstream 18

19

20

21

22

23

24

25

26

Update annually (minimum) Intrado, CenturyLink, AT&T, Windstream, WSP’s Where do you maintain this information? Who is responsible for updating it? Blackberry / Cell Phone Flash Drive Updated quarterly by E9-1-1 Office & distributed to PSAP supervisory staff Wallet PSAP Supervisors PSAP Operations Book 27

28

29

30

31

32

33

34

PSAP supervisors The key Ticket numbers: (nothing happens without them) Notify surrounding counties before and after Where do you record everything associated with the event? CAD Office document Demand detailed notes (cannot provide too much information) Times What happened?; what is not working?; what is working? Whom did you speak to? What company are they with? What did they say / going to do? TELL THEM TO CALL YOU BACK WHEN ANYTHING CHANGES CB numbers 35

36

Backup power UPS Telephone Recording CAD Radio 37

Watch Cmdr; DC’s Well-being Checks Other PSAP’s PSAP Management Staffing ER’s Medical Examiner PIO PSAP Maintenance Radio, HVAC, Plumbing, IT JUST AS IMPORTANT AS LINES 38

Eligible circuits include voice, admin lines, radio circuits, end office to central office circuits Is not free TSP designated facilities have services restored first 39

PSAP ID used by LEC PSAP ID # used by service provider 40

Exercise it Train in it It should not be in the same bursting radius of your primary PSAP Don’t have one> be creative (Jail, Ed Ctr, municipal LE agency) 41

WebEOC messaging Text messaging Cellular px Internet Satellite px 42

1 Identify 2 Report 3 Respond 4 Recover 5 Prevent 43

Maintaining Evolving Troubleshooting 44

45