CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 1 Forward Multiplicity Detector FMD 1 FMD 3 FMD 2 Outer ring Inner ring.

Slides:



Advertisements
Similar presentations
Magnet mur de plomb PRS, SPD Photo: Peter Ginter.
Advertisements

April 29, 2001APS-Wash-DC, Jens Jørgen Gaardhøje, Niels Bohr Institute1 nReaction features in 65 AGeV Au + 65AGeV Au nElectromagnetic dissociation ndN(ch)/d.
ALICE Si-FMD 10/ Jens Jørgen Gaardhøje, NBI, Forward Multiplicity Detector (status and progress) Si-FMD (Forward Multiplicity Detector)
May 18, 2001Hard-Probes, Jens Jørgen Gaardhøje, Niels Bohr Institute1 nReaction features in 65 AGeV Au + 65 AGeV Au nElectromagnetic dissociation ndN(ch)/d.
Thermal simulation, CERN, 11 Nov 2002Børge Svane Nielsen, NBI1 FMD: Silicon multiplicity detectors Thermal simulation meeting, CERN, 11 November 2002 Børge.
ALICE Si-FMD,T0,V0 25/ Jens Jørgen Gaardhøje, NBI, Forward detector overview Si-FMD (Forward Multiplicity Detector) NBI+INR oSi-strip.
Danish Teachers, CERN, 23 Oct 2007Børge Svane Nielsen, NBI1 The primordial ’soup’ of QUARKS and GLUONS Can we make and study it on earth? M. Turner Natl.
March 19, 2001 Moriond Jens Jørgen Gaardhøje, Niels Bohr Institute1 nReaction features in 65 AGeV Au + 65AGeV Au ndN(ch)/d  distribution -4< 
Neutrinos from kaon decay in MiniBooNE Kendall Mahn Columbia University MiniBooNE beamline overview Kaon flux predictions Kaon measurements in MiniBooNE.
Institut für Verbundwerkstoffe GmbH Erwin-Schrödinger-Str Kaiserslautern Germany 1© Institut für Verbundwerkstoffe GmbH, N.
Test practice Multiplication. Multiplication 9x2.
Technical Forum, 8 March 2007Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
ALICE Si-FMD,T0,V0 12/ Jens Jørgen Gaardhøje, NBI, Forward detector overview Si-FMD (Forward Multiplicity Detector) NBI+INR oSi-strip.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
ALICE FMD 11/9 2001Jens Jørgen Gaardhøje, NBI, AGENDA oApproval of agenda and minutes of last meeting oIntegration. L. Leistam ( )
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Sept 4, 2001Paris, Jens Jørgen Gaardhøje, Niels Bohr Institute1 nReaction features in 65 AGeV + 65 AGeV and 100 AGeV AGeV Au-AU collisions nEM dissociation.
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
Physics with ALICE-PMD Basanta K. Nandi IIT Bombay For PMD collaboration.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
Niels Bohr By: Britany, Lynn, Tom, Rick, Kevin. Joke of the Day What happens when electrons lose their energy? They get Bohr'ed.
By: Linden and Aleah Chemistry Bio Niels Henrik David Bohr was born in Copenhagen on October 7, He was the oldest son of Christian Bohr.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Kristjan Gulbrandsen Niels Bohr Institute - Discovery.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
ALICE Si-FMD,T0,V0 26/ Jens Jørgen Gaardhøje, NBI, Si-FMD oUpdate on Status oConceptual design of FEE and BEE-DAQ chain oTimetable.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
FWD DETECTORS ALICE FORWARD DETECTORS workshop. AGENDA Tuesday, March 11th, 2003 at R Introduction and main deadlines, Jens.
29/ Jens Jørgen Gaardhøje, NBI, Forward Detectors TDR FMD, T0, V0 Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI)
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
MEASUREMENTS FROM THE SPL TUNING BENCH POA Meeting – 19/05/2015 Szabina Horvath-Mikulas, Sotirios Papadopoulos, Ercan Pilicer.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
Andrei Nomerotski, University of Oxford ILC VD Workshop, Menaggio 22 April 2008 SiD Vertex Detector.
Multiplying Polynomials with FOIL Objective: Students will multiply two binomials using the FOIL method. S. Calahan March 2008.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
Multiplying Binomials
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
The LHCb Installation Story
Assembly procedure – Inner Region
Børge Svane Nielsen/JJG
Installation step 4. (3 days)
Future lepton scattering facilities
CTOF Installation.
WG4 – Progress report R. Santoro and A. Tauro.
Heating of ALFA detectors
Alexei Kurepin, Alla Maevskaia
Challenges for FCC-ee MDI mechanical design
Question & Suggestions March 17th
Quick draw: Draw a model of an atom (Remember that an atom is made
DET. Integration Inner detector envelope Radial clearances.
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Atom, Bohr-Rutherford, and the Periodic Table
Cryomodule Assembly Plan
Quick draw: Draw a model of an atom (Remember that an atom is made
Possible positions for automatic wear compensation
Groups and Periods.
Presentation transcript:

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 1 Forward Multiplicity Detector FMD 1 FMD 3 FMD 2 Outer ring Inner ring

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 2 FMD3 Cone and Beam Pipe Support FMD3 support cone holds the beam pipe via 4 tensioned wires Test of final cone and wire mechanism: Deformations <10 um. Beampipe support

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 3 FMD2 support IP FMD2 support is a carbon fibre cylinder Mounting flap Honeycomb detector mounting plates Water cooling plate for FMD2 enclosure

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 4 Digitizer cards, 40Mhz bus, RCU, DAQ, Trigger Digitizer cards: 2 types: inner, outer 3 ALTROs + Board Controller 3 m bus cable to RCU gave many problems. Solved by changing from ALTRO flat bus to twisted pair cables. Trigger (LTU) tested DAQ operational. 40 bit signal + 10 grounds 40 bit signal + 40 grounds Twisted pairwise adaptor

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 5 Performance in beam 680 MeV e - beam test at ASTRID ring, Aarhus University, DK 3inner+3outer FMD modules (4608 channels) e - beam

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 6 Assembly of FMD3

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 7 Completed FMD3

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 8

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 9 Performance tests after assembly Test of noise (pedestal width) for half inner ring (5 modules, 5120 strips) after final assembly Pattern consistent with strip and printed circuit lengths S/N= for all channels

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 10 … and completed FMD2

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 11

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 12

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 13 Packing FMD3 Spring suspended false bottom

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 14 From NBI to CERN Friday, Saturday, Saturday, in TPC clean room

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 15 … at CERN Cabling of FMD3 and mounting of connectors completed week 10 Verification of FMD3 cabling and partial cabling of FMD2 (service chariot) week 12 Pre-Commissioning in TPC clean room at P2 with: Final CAEN HV, CAEN LV-Easy, temporary cooling system, Final DAQ + Trigger system, partial DCS weeks 11 and Commissioning: week 12 Installation in ALICE April (FMD3) week 17

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 16

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 17

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 18

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 19 Time table  FMD 3 cabling 5/3 - 9/3 (week 10) OK  Delivery at CERN of FMD 2 & 3: 10/3 (week 10) OK  Precommissioning at CERN: 13/3 - 16/3 (week 11) OK  Commissioning at CERN of FMD 3 & 2 : 19/3 - 23/3 (week 12) (can be extended into 26/3 - 30/3, week 13)  Installation HV+LV in pit area (10/4 - 13/4, week 15)  Final preparation for installation (16/4 - 20/4, week 16)  Installation FMD 3 (23/4 - 25/4, week 17)  Installation FMD 2 (10/4, week 19)  Cabling FMD 2 (15/4, week 20)  Delivery at CERN of FMD1 : 25/6 - 29/6 (week 26)  Commissioning at CERN: 2/7 - 6/7 (week 27)  Final preparation for installation: 3/9 - 7/9 (week 36)  Installation FMD1 : 12/9 - 14/9 (week 37)

CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 20 Summary -FMD3 and FMD2 detectors at CERN since March 10, Bad strips (<< 0.1%) -Signal (MIP)/noise = Commissioning with final power supplies, DAQ, DCS and Trigger ongoing at CERN. -Installation in ALICE: FMD3: 23/4, FMD2: 10/5, FMD1: 12/9