DOE FOR THE CUSTOMER Chris Vandegrift V.P. of Engineering Selas Heat Technology.

Slides:



Advertisements
Similar presentations
Title I, Part A District Budget Planning The “Small” Stuff Julie McGuire, MEd Federal Funds Coordinator Carrollton-Farmers Branch ISD.
Advertisements

Systems Training Program Propeller System
Partial Hydrogen Injection Group II Justin Bruyn, Andrew Cammorata, Myles Moore, & Chris Sandini
Treater Oil & Water Valves
1 UBC International Training Fund Presents. Tensioning.
BMM 3633 Industrial Engineering
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
Pneumatic Control Valves
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Air Flow Bench Presented By: Saket Karajgikar & Nikhil Lakhkar Advisor: Prof. Dereje Agonafer.
The art of Engineering TURBINE PARTS. The art of Engineering TURBINE PARTS Valve Parts A. Stems, Disc, Seats B. Crosshead Assembly, Crosshead Bushings,
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3-Develop Solutions Unit 4-Implement a Solution Unit 5-Test and Evaluate.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
Steering Columns.
Selection of measuring instruments
Air Operated Valve Calibration NMV21
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Forged Steel Water Gage Valves
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Asahi/America Swing Check Valves
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
Asahi/America Thermoplastic Check Valves Ball Check Valves ½” - 4”PVC, CPVC, PP, PVDF Uniseat/ Seal.
DOE – An Effective Tool for Experimental Research
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
A Process Control Screen for Multiple Stream Processes An Operator Friendly Approach Richard E. Clark Process & Product Analysis.
Chapter 1.1 Use mathematical tools to measure and predict. Apply accuracy and precision when measuring. Display and evaluate data graphically. Chapter.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Bolted Joint Assembly. Advanced Solid Body Contact Options Goal – In this workshop, our goal is to study the effect that contact stiffness specification.
Higher National Certificate in Engineering Unit 36 Lesson 1 - Statistical Process Control.
Lsmin h Lsf = Length of Spring, Free condition (one spring to represent many) Lsmin = Length of Spring, MINimum (upper bearing outer ring bottomed out.
6.4 Confidence Intervals for Variance and Standard Deviation Key Concepts: –Point Estimates for the Population Variance and Standard Deviation –Chi-Square.
M.Nuzaihan DMT 243 – Chapter 6 Quantitative Analysis The process of analyzing information and making decisions based on numerical data. Analyzes fundamental.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
009 (M3) ½”-2” 009 (M3) ½”-2”. Modification Overview- 009  009 ¾-1” ( ) (1” ) ¾-1” ( ) (1” ) 1¼ -2” ( ) 1¼.
A.V.C COLLEGE OF ENGINEERING MANNAMPANDAL DEPARTMENT OF MECHANICAL ENGINEERING 14 th Batch.
PIMA COMMUNITY COLLEGE ASCEND! 2009 ASGC Symposium April 18,
Mechanical Joint Restraints
Plumbing Valves.
Innovative Science Research Foundation Circulation may please be restricted to prospective companies only ISRF Proprietary
Automotive Engines Theory and Servicing
”-10”.
Back Pressure Regulator Repair
½”-10”.
Fastener Facts Fastener Facts.
Statistical Process Control
Endplay Rb Fapp = W + TH Ru h Lsf Lsmin W EP Lms=Lr-EP Lr force force
Endplay Rb Fapp= W + TH Ru h Lsf Lsmin W EP Lr Lms force force Fapp h
HEAT EXCHANGER DESIGNPROJECT ME 414 Thermal Fluid System Design
Automatic Transmissions and Transaxles
009 2½”-3”.
MARKETING PROCESS.
Fastener Facts Fastener Facts.
Top 6 Strategies of Digital Marketing.
What are the Parts Need to Replace For Resolving Transmission Fluid Leaks.
INTRODUCTION TO PNEUMATICS
½”-10”.
Implementing Six Sigma Quality
4000B (M3) ½”-2”.
850 2½”-10”.
880V 21/2”-10”.
975 2½”-10”.
856 2½”-10”.
Statistical Process Control
450DA 4”-10”.
Automatic Transmission/ Transaxle In-Vehicle Service
Statistical Process Control
6 Step Problem Solving Process
Presentation transcript:

DOE FOR THE CUSTOMER Chris Vandegrift V.P. of Engineering Selas Heat Technology

4BZR Regulator December 2013 Objective:  Launch the 4BZR – ½” regulator  Conduct performance tests with various conditions: flow rate, pressure variation, washer weights, spring properties and diaphragms.  Meet or exceed the current standard for constant pressure output from the regulator

4BZR Before Summer 2013 ½” Balanced Zero Regulator Erratic performance on shut-off

“On-Target with minimum variance.” “Operating with minimum variance is achieved only when a process displays a reasonable degree of statistical control.” -Walter A. Shewhart Variation

Virtual Fishbone 5

Design of Experiments (DOE) Design of experiments is a branch of applied statistics that deals with… –Planning –Conducting –Analyzing –Interpreting …controlled tests to evaluate the factors that impact the output of the regulator.

4BZR DOE – Main Effects Main Nut Setting Seal Nut Setting Seal Washer Diameter

4BZR After DOE

4BZR Response Optimizer Optimal Settings

4BZR Component Recommendation Seal diaphragm bolt circle1.75” Steel retaining washer I.D.1.125” Steel retaining washer O.D.2.0” Steel retaining washer bolt circle1.5” Cork gasket I.D./O.D./B.C. Same as steel retaining washer Seal diaphragm bagging0.310” Seal washer I.D.0.203” Seal washer O.D.0.687” Paper seal gasket washer I.D.0.203” Paper seal gasket washer O.D. Lock washer type#10 “star” lock washer Main diaphragm bolt circle6.5” Main diaphragm pan diameter3.25” Seal diaphragm nut setting 0.649” below top of lower body Main diaphragm nut setting 0.068” above top of lower body Recommended Components Modified Assembly Tools

4BZR Test Rig Objective: To test Balanced Zero Regulators performance against quality standards. The ability to digitally record and display test data.

4BZR Marketing Claim Tests

Thank you!

Questions?