Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.

Slides:



Advertisements
Similar presentations
I-5 Corridor Reinforcement Project
Advertisements

Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless.
September 24, 2007 – Page 1 ColumbiaGrid Puget Sound Area Study Team Outage Scheduling Challenges Summer 2007 and Beyond Seattle City Light.
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Sierra Subregional Planning Group 10-year Transmission Plan
Western Area Power Administration Transmission Customer Meeting April 22, 2008.
Puget Sound Area Northern Intertie (PSANI) Transmission History ColumbiaGrid September 24, 2007 September 24, 2007 Snohomish County Public Utility District.
PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report 24 Sept 2007 Gordon Dobson-Mack Ellen Feng
Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
Cleco Transmission Planning Summit 2013
Dakotas Wind Transmission Study South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Edward P. Weber Transmission System Planning Manager.
Export ASPEN Sequence Data To PTI WECC Base Case
Electric System Reliability in a Post SONGS World.
2008 Transmission Expansion Plan Updates Tom Seeley, E.ON U.S.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
RIGO Update Xcel Energy Jason Standing Jeffrey Norman October 3, 2007.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
SAC500 Transmission Project
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
AESO Export Capability Workshop February 16, 2006 Metropolitan Centre, Calgary.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
King County Fire Chiefs June 19, 2013 King County Outreach and Enrollment Strategy.
Conclusion: reliable post contingency capacitor switching should be feasible to be planned. However, the simulation needs to be repeated as new information.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Online resource of information & services for buying or selling Seattle Real Estate
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Local Area Planning Update to TRANSAC – June 29, 2017
PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
Pacific Power Seismic Preparedness Update
Recent Approved WECC Cases
Building a Combined 25F Nomogram Step 0: Define Terms
Balancing Authority Area Transmission Service Cost Estimates
ColumbiaGrid Puget Sound Area Study Team
2018 CG MOD 33 updates CG Planning Meeting June 7, 2018
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report
Presentation transcript:

Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Puget Sound Area Groups (PSASG) initial study identified three portfolios of improvements Puget Sound Area Groups (PSASG) initial study identified three portfolios of improvements Additional subsequent projects were identified through additional study work. Additional subsequent projects were identified through additional study work.

Completed Portfolio #1 Projects Arm NI Separation Scheme at 100 MW of S-N flow for N-2 Monroe-Custer. (BCTC) Arm NI Separation Scheme at 100 MW of S-N flow for N-2 Monroe-Custer. (BCTC) Bothell-Snohomish #2 upgrade (BPA) Bothell-Snohomish #2 upgrade (BPA) Upgrade Snohomish Bus Sectionalizing Breaker (BPA Upgrade Snohomish Bus Sectionalizing Breaker (BPA Additional 500 kV breaker at Echo Lake (BPA) Additional 500 kV breaker at Echo Lake (BPA) Reconductor Bothell-Sammamish 230 kV line (PSE & SCL) Reconductor Bothell-Sammamish 230 kV line (PSE & SCL)

Portfolio #1 Projects Portfolio #1 Projects in Development Portfolio #1 Projects in Development Refine RAS Controller/Arming (BPA) Refine RAS Controller/Arming (BPA) Additional BCTC RAS communication capability Additional BCTC RAS communication capability Covington-Berrydale 230kV (PSE) Covington-Berrydale 230kV (PSE) Portfolio #1 Projects Deferred Portfolio #1 Projects Deferred Uprate PSE 115 kV lines (PSE) Uprate PSE 115 kV lines (PSE) Horse Ranch tap to Snohomish (BPA) Horse Ranch tap to Snohomish (BPA) Tap Bothell-Sammamish into Snoking (BPA) Tap Bothell-Sammamish into Snoking (BPA)

Additional Projects Completed Covington-Creston to Covington Auxiliary Bus (BPA) Covington-Creston to Covington Auxiliary Bus (BPA) Reconductor Bothell-Snoking 230 kV sections Reconductor Bothell-Snoking 230 kV sections BCTC arming RAS at lower NI levels BCTC arming RAS at lower NI levels Snoking-Maple Valley reconductored (BPA) Snoking-Maple Valley reconductored (BPA) SCLs 115kV line upgrades (SCL) (ongoing) SCLs 115kV line upgrades (SCL) (ongoing) Snohomish Delta Switching Snohomish Delta Switching SCL Mass and Bothell Tfr switching SCL Mass and Bothell Tfr switching

Future Work South King County Transformer South King County Transformer RAS Refinements RAS Refinements Existing: multiple arming and generation levels Existing: multiple arming and generation levels Additional RAS: separation schemes Additional RAS: separation schemes Echo Lake-Monroe Cutplane improvements Echo Lake-Monroe Cutplane improvements South of Sedro Improvements South of Sedro Improvements