Quality Improvement Level Up Program December 17, 2008.

Slides:



Advertisements
Similar presentations
More CMM Part Two : Details.
Advertisements

ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
Building Disaster-Resilient Places STEP FIVE – Prepare, Review, and Approve the Plan.
ISO 9001 : 2000.
How to Document A Business Management System
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
Performance Management DEPARTMENT OF EDUCATION (ED) OFFICE OF MANAGEMENT (OM) Human Capital and Client Services (HCCS) ED PERFORMANCE APPRAISAL SYSTEM.
Quality Management System
Overview Lesson 10,11 - Software Quality Assurance
Mitun PatelMXP07U. Organisational structure Top management; this includes the organisation’s general manager and its executives Department managers; this.
The Quality Improvement Model
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Responsibilities for Failure Investigations.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
Quality Representative Training Version
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
4. Quality Management System (QMS)
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Business Reviews.
Supplier Performance “How to Measure It, Communicate It and Improve it ” September 13 th, 2011.
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
Effectively applying ISO9001:2000 clauses 5 and 8
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Effective Methods for Software and Systems Integration
QSIT Management Controls QSIT Workshops. Management Controls u Importance u Assessment u Demonstration of Compliance.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Objectve 5.05 Manage Promotional Activities to Maximize Return on Promotional Investments.
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
Introduction to ISO 9001:2000.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
INTRODUCTION TO AUDITING
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Project Evaluation and Control How does a project get one year late?... One day at a time.
Event Management & ITIL V3
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
1 Implementing a Business Management System compliant to ISO 9001:2000.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
TOTAL QUALITY MANAGEMENT
PROGRAM MANAGEMENT MODULE 2 Dr. Nicole Fitzhugh Professional School Counselor Berwyn Heights Elementary.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Greg Baker © Part One The Foundations – A Model for TQM Chapter # 1 Understanding quality.
QUALITY ASSURANCE THROUGH ACCOUNTABILITY a system developed in offshore operations.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
PERFORMANCE MEASURES GROUP 4. DEFINITION PERFORMANCE MEASURES. These are regular measurements of outcomes and results which generates reliable data on.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
ISO/IEC
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
Quality Management Systems – Requirements
Setting up an Internal Audit Program
Agenda Who are we? 1 Introductions Journey so far 2
PREVENTIVE MAINTENANCE
ISO 9001:2008 Quality Management Systems
Chapter # 8 Quality Management Standards
1 -: 8D Problem Solving Technique :- Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Presentation transcript:

Quality Improvement Level Up Program December 17, 2008

Level Up Program Barry Puskar Manager - Supplier Management Section (within the Purchasing Dept.)

Level Up Program Quality and Sales Commitment and Support Quality Level Up Level Up Quality Improvement Program ; Joint improvement program between Supplier Quality Assurance (SQA) & Purchasing for suppliers who are not meeting PPM targets. Program helps the supplier make the necessary corrections to improve their performance back to the “acceptable” levels.

Level Up Program Scope: To work with suppliers who’s PPM data is trending in the wrong direction To enhance the business relationship and daily communication between the supplier and the SQA engineer To insure full support from both Sales and Quality of the supplier Promote customer confidence and generate sales Improve the overall quality of our product

Level Up Program Purpose: Level up quality to further exceed current and future quality targets Strengthen our supplier base to promote high quality levels during development  Highest quality spikes occur during new model launch SOP

Level Up Program Keith Merrion Product Manager - Supplier Quality Assurance

Level Up Program History – Improvement Impact 1. Graph / Lessons Learned 2. Program Benefits

Level Up Program Lessons Learned from Past Improvement Activity INTERNAL COMMUNICATION When you go back to your plant, bring everyone together and discuss about the Level Up Program. Gain their support to achieve your Goals. Request everyone participate in the improvement. Lesson Learned: If this doesn’t happen, Improvement is not successful. EXTERNAL COMMUNICATION Always keep communication with SIA. Primarily your SQA Engineer. Lesson Learned: SIA can help you resolve an issue and prevent it from becoming a problem.

Level Up Program Lessons Learned from Past Improvement Activity STANDARDIZED WORK Are your Work Instructions adequate in defining each step the Associate must take to perform his task without creating mistakes? Do Associates follow the Work Instructions or is there any variation. If more than one Associate performs the same task, is it done the exact same way? Are Audits conducted to insure conformance to the Work Instructions? What Actions are taken when Associates do not follow Standardized Work? Lesson Learned: If the process is established correctly and the Work Instructions are adequate to prevent mistakes, it is a must that Associates follow Standardized Work. If not, defects will occur.

Level Up Program Lessons Learned from Past Improvement Activity ABNORMAL PROCESS When Processes are set-up correctly, and a problem occurs, this can create an Abnormal Process. Typical problems are: Equipment Failures, Tool Failures, Associates not following Standardized Work, Material Issues, Sub-Component Issues, Poke Yoke Problems, Work Area disruption, etc. These problems result in alternate ways to keep the Process running, resulting in ABNORMAL PROCESS. Lesson Learned: ABNORMAL PROCESSES create defects. Take appropriate actions when they occur. Add additional inspection, qualify backup equipment/tools, document problem and actions (with date and time), notify Supervisor/Manager, have a reaction procedure, etc.

Level Up Program Lessons Learned from Past Improvement Activity KNOW YOUR TARGETS Develop your own Targets internally to meet the SIA Target. Establish Targets for each Department (in your company). Plans and Time Lines are extremely important as a roadmap to reach your Targets. Understand what your established Targets are and progress to achieving them. Lesson Learned: If Targets are not set, its like taking a trip without understanding where you are going and when you are there. Remember Plans and Time Lines are the roadmap to guide you to your destination. This is key to improvement activity.

Level Up Program Program Benefits

Level Up Program Requirements 1. Target (Standard & VS Defined) 2. Form Review (with schedule) 3. Communication 4. Key Contacts 5. Quality and Sales Commitment and Support

Level Up Program Target (Standard & VS Defined) SIA Target PPM is 100 SIA TARGET - VITAL PARTS PPM IS 0 Establish your own Targets to Step Down PPM to achieve the SIA Target Establish your internal PPM’s for each Department, Push improvement to obtain Targets.

Level Up Program Form Review (with schedule) For the Level Up Program, you will be required to submit a monthly report to your SQA Engineer. Time Frame for reporting will be Jan 09 to Jun 09 (6 months). Reports are due the following month on the 10 th day. First report due Feb 10 th.

Level Up Program Required Monthly Report Format Change Update Add your information

Level Up Program Monthly Report – Data Sheet Add your information

Level Up Program Communication The Presentation / Monthly Report format is located on the SIA Web Page ( select “Suppliers” then “Forms/Standards). It is up to you to contact SIA if you need any more information to aid in your Level Up Program.

Level Up Program Key Contacts at SIA

Level Up Program Quality and Sales Commitment and Support When presentations are over the SQA Engineers and Buyers will meet with you to review your company’s past performance. You are here representing you company, we need your commitment and support to carry this message back.

Level Up Program Sub-Performance Results

Level Up Program Next: Mark Haynes – Supplier Management Group Leader

Level Up Program SUB-PERFORMANCE ACTIVITY Mark Haynes Group Leader - Supplier Management Section (within the Purchasing Dept.)

Level Up Program Sales and Quality Commitment and Support During the supplier quality level up program, your progress will be evaluated on a monthly basis by the SQA engineer & Purchasing. If progress does not meet the requirements, an evaluation will be done and corrective action will be enforced.

Level Up Program Quality and Sales Commitment and Support Corrective Action Activity Warning Letter to Presidential Level will be issued by SQA Management Face to Face Meeting with Upper Management (at SIA) held by SQA with Purchasing ON Site Audit QIP/PRE-QIP Selection by Purchasing & SQA (Presidential Level Support Required for all QIP/Pre-QIP Activity)

Level Up Program Quality and Sales Commitment and Support What is QIP & Pre-QIP?

Level Up Program Quality and Sales Commitment and Support Pre-QIP Quality Improvement Program (P-QIP); Top Management corrective action process where the majority of chronic and recurring defect suppliers make the necessary corrections to improve their performance back to the “acceptable” levels.

Level Up Program Quality and Sales Commitment and Support Pre-QIP 6 month improvement program SIA Purchasing and SQA shall support all activity Supplier will provide detailed progress reports to SIA Top Management during the 2nd, 4th and 5th months Top Management Review Audits will be done during the 3rd and 6th month end If a supplier’s participation in PQIP is unsuccessful, the Supplier may be subject to QIP.

Level Up Program Quality and Sales Commitment and Support QIP Quality Improvement Program (QIP); Top Management Level corrective action process for those suppliers whose performance has not improved, or has gotten worse over a period of time. Once selected, the supplier will participate in a more formal and structured corrective action system as outlined within the Supplier Quality Manual. All meetings/audits will require Presidential support from the supplier.

Level Up Program Quality and Sales Commitment and Support QIP Suppliers will participate in a 6 month program with review meetings every month. Top Management Reviews will be done during the 4th and 6th month end. Monthly meetings will be face to face meetings to review the suppliers overall progress. SIA Purchasing and SQA shall support all audit activity (location shall be determined at the time of audit). Supplier’s performance will be evaluated at the 6 month meeting and QIP continued if needed. If a supplier’s participation in QIP is unsuccessful, the Supplier may be subject to additional QIP program participation until SIA requirements have been met. Parent Company participation and support is required

Level Up Program Larry Strauch Manager - Supplier Quality Assurance

Level Up Program C + C + C = Success

Level Up Program ELEMENTS FOR SUCCESS 1.) Communication * Maintain good communication with your SQA Engineer For critical items, don’t rely on Talk directly person to person to expedite corrective action…call SQA Engineer, Group Leader or Manager * Seek to clearly understand your defects and how they affect our customers * Be proactive with information and feedback quickly Tell us if you suspect defect outflow…don’t hesitate to call

Level Up Program ELEMENTS FOR SUCCESS 2.) Consistency * Establish and maintain effective QA Systems Are your procedures adequate to assure that every defect is identified and contained? Have you Incorporated Standardized Work into your system…is everyone doing the same thing every time? Are you effectively and consistently managing every abnormal process? Many of your PRC responses identify an “abnormal process” as the root cause for the defect.

Level Up Program ELEMENTS FOR SUCCESS 3.) Commitment * You must accept personal responsibility and ownership for the success of this program