POINT LISAS PORT AND INDUSTRIAL ESTATE DISASTER RESPONSE AMMONIA SPILL

Slides:



Advertisements
Similar presentations
National Response Plan on Natural and Man Made Emergency Situations Emergency Management Department Ministry of Internal Affairs (MIA) of Georgia.
Advertisements

Museum Presentation Intermuseum Conservation Association.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Site Safety Plans PFN ME 35B.
Module 3: Developing Plans
EMERGENCY PREPAREDNESS B Y : Mr. P. K. Patel.. Plant Emergency Manual * Major hazards of plant in terms of raw materials, processes, equipments, chemical.
Organizational Tabletop Exercise
South Old Bridge Vol. Fire Co. Standard Operation Procedures for Hazardous Material Incidents.
There are three types of emergencies:  Internal  External  Natural disasters.
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
Welcome to the on-line safety training course: Emery Emergency Response To start the training program, select the Slide Show icon at the bottom right.
EMERGENCY MEDICAL MANAGEMENT OF RADIATION ACCIDENTS ON SITE AND PRE-HOSPITALIZATION Module XVI.
Disaster Management Plan S.VENUGOPAL, Manager(HSE)
Implementation of the Seveso II Directive 96/82/EC Institutional Strengthening of the Slovak Environmental Agency Emergency Response Principles and Practice.
1 Denver International Airport Ken Greene Deputy Manager of Aviation Airport Operations June 10, 2014.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
 Increasing threat.  Failing to prepare is preparing to fail.  Levels:  National.  Province.  Health Service.
Northeast Colorado All Hazards Region 5-1 Mass Casualty Incident Plan Training Section 5 – Health and Safety.
Chapter 29 Mass-Casualty Incident Management. Chapter 29: Mass-Casualty Incident Management 2 Discuss the various environmental hazards that affect the.
SUMMARY OF EMERGENCY PROCEDURES To activate the Warrnambool Campus Alarm System: 1) Dial *33 (from an internal telephone extension) 2) State your name.
Contractor Induction Program Gippsland Southern Health Service is committed to a safe and healthy work environment.
Emergency Evacuation.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
Technician Module 2 Unit 4 Slide 1 MODULE 2 UNIT 4 Specialized Functions.
BY Prashant P. Rane Safety, Health & Environment Gadegaon.
1 Emergency Planning Simulation 2 1.The timer is more psychological than actual. There is no time limit. However, can total lapsed time be determined and.
Spill Prevention and Control Regulatory Requirements Hazardous Waste Operations and Emergency Response (HAZWOPER) –29 CFR –Covers spill response.
Community Warning System A partnership of industry, media and the public to warn and inform our community in the event of an emergency.
Contractor Safety Training | Westbrook | 1 Emergency Response.
S-271 Helicopter Crewmember Slide 7D-1 Unit 7D Operational Safety - Lesson D: Parking Tender and Miscellaneous Roles and Responsibilities.
Chapter 15 1 CHAPTER 15 – EMERGENCY RESPONSE PLAN CEE 698 – Construction Health and Safety.
EMERGENCY PLAN AND PROCEDURE IN INDUSTRY INVOLVING NORM/TENORM
HAZWOPER Overview.
You need to have them in place, You hope you don’t need to use them.
Student Health & Edinburgh Napier University Health & Safety Team | Edinburgh Napier University.
Special Operations Chapter 37. Incident Command System ICS is used to help control, direct, and coordinate resources It ensures clear lines of responsibility.
Hazardous Waste and Emergency Response
Duke University Contingency Plan
Incident Reporting Procedure
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
Community Preparedness & Disaster Planning. Why Disasters occur ?
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Hazardous materials awareness Chapters 4 and 5 Protective equipment Command, safety and scene control.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Spill Prevention and Control.
Copyright ©2000 Business & Legal Reports, Inc. SPCC Safety Training Presentations Spill Prevention and Control.
ONSITE EMERGENCY MANAGEMENT PLAN. DISASTER Disaster in industry may be defined as one or more emergencies which can affect several or all plants / departments,
Landing in Saskatchewan  STARS stands for Shock Trauma Air Rescue Society. We are a Non-Profit, Charitable Organization that provides helicopter-based.
Occupational Safety and Health 6 th Edition Lecture Notes By: Dr. David Goetsch.
Emergency Action Plan and Response Training
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Burke Lakefront Airport Airport Emergency Plan
Linn & Benton Counties Mid-Valley. Mid-Valley LEPC  Today's Presentation: Mid-Valley LEPC – who we are! Grants – Why apply? Emergency Plans – What are.
Bernards Township Office of Emergency Management February 28, 2012.
Visual 1.1 An Overview Multi-Hazard Emergency Planning For Schools UNIT 3.
HAZWOPER: Awareness Level 29 CFR (q). Headline Stories Ammonia Evacuates Industrial Site Acid Spill Sends Workers to Hospital Fuel Spill Contaminate.
Northeast Colorado All Hazards Region 1 Mass Casualty Incident Plan Training Section 8 – Roles & Responsibilities.
Crisis Management Crisis: any situation that has the potential to affect long-term confidence in an organisation or product and may interfere with its.
Hazardous Materials Business Plan Training Topic 2
Facilities Incident Notification. Reporting Requirements All employees are required to report immediately any incidents, accidents, or major equipment.
SITE EMERGENCY RESPONSE All sites are different. Different chemicals. Different configurations. Advance planning and training is necessary to protect worker.
Emergency Actions Emergency Actions are composed of two actions. 1) Tornado & Severe Weather 2) Emergency Evacuation.
Business Continuity Management Business Continuity Management (BCM) is a holistic management process that identifies potential impacts that threaten an.
Emergency Response For the Hazardous Waste Worker.
Emergency Preparedness Emergency Action Plan – EAP Emergency Operating Procedure - EOP Do you have a written plan? Yes – Retained in Human Resources.
RESCUE SERVICES IN FINLAND Ministry of the Interior Department for rescue services Rescue Director (Fire Chief) Rescue Departments Regional administrative.
District’s Plan for Disaster Preparedness.
Coordinating with Station Emergency Response Agencies
Emergencies & Emergency Response
Presentation transcript:

POINT LISAS PORT AND INDUSTRIAL ESTATE DISASTER RESPONSE AMMONIA SPILL

Ammonia Inhalation Immediate specialist medical attention required Short Term Exposure Limit is 35 ppm for ten (10) minutes 500 ppm immediately dangerous to life and health Severe chemical burns (mucus membrane, respiratory tract etc..) may be life threatening if not treated correctly in a timely manner

RESPONSIBILITIES Port Manager Initiates response Management of incident Alternate incident commander OC Marine Alternate Safety Officer Security Manager Safety Officer Emergency response Initiate relevant safety resources Formulate rescue teams

RESPONSIBILITIES Officer in Charge, Marine All radio communications Security Manager Traffic Management Security Assistant Port Manager Evacuation of all Personnel Coordination of all vehicles for response effort Senior Customs Officer Assigned statutory functions

ORGANISATION CHART EMERGENCY RESPONSE TEAM PLIPDECO PORT Public Relations Media TTEMAS Other Agencies

The Scenario Ammonia Release - Savonetta Pier I Date: 28 June 1996 Time: 1000 hours Location: Loading Terminal Activity: Loading of an Ammonia Tanker Incident: Release of high concentration of Ammonia

Ammonia Release - SP I Cause: Malfunction of the loading arm end (coupling) Loading Rate: 1,000 tonnes per hour Duration of Release: 5 minutes Quantity Released: 85 tonnes Wind direction & speed: West to East at 10 mph Areas Affected: Port & Estate (Plants include TTMC, Arcadian, Shell Lubricants), portion of California (residents south of Gilbert Park)

Ammonia Release - SP I Population at risk: 955 Port - 230 Arcadian - 180 Shell Lubricants - 25 TTMC II - 40 LCL /CES - 55 California Gov’t School - 350 California Residents - 75

Ammonia Release - SP I 10:00 Loading arm uncoupled 10:00:05 Operator at SP I, Visual observation of incident, Calibrator Alarms at Control Rm 10:00:30 Operator, Control Room SP I, sounds alarm button at Port, Incident Commander alerted 10:00:45 Control Room monitors & alerts Operator at Plant, simultaneously initiating TTEMAS Grid

Ammonia Release - SP I 10:01 Informs Ammonia Operator by hand radio, Port Incident Commander activates Emergency Response Team 10:04 Valve shut off at source 10:05 Lines free of NH3

Ammonia Release - SP I Control Room Operator observes 3 employees on pier overcome by Ammonia inhalation Ammonia observed to be travelling over Port heading eastwards Observations relayed to Incident Commander (Port Manager) Casualties taken to first stage triage point First Aiders report to triage area All available vehicles report to triage area

Ammonia Release - Communication TTEMAS Communication Grid initiated by Operator’s radio call to NGC channel Fire Services Police NEMA Hospitals PLIPDECO Senior Management Key personnel at Estate Plants Couva Regional Council ALL MEDIA RELEASES VIA OFFICE OF PLIPDECO PRO

Evacuation: Land & Sea 10:04 Land Evacuation of Port commences supervised by Evacuation Coordinator 10:04 Sea Evacuation commences supervised by Senior Tug Engineer 10:04 Evacuation/safety plans of individual companies commences (Arcadian, Shell, TTMC II, CES/LCL) Emergency Traffic Management/Control Plan Community evacuation plan by Regional Corporation 10:13 Complete evacuation of Port and affected areas on Point Lisas Estate

Estate Emergency Resources Six (6) Ambulances owned and operated by Tenants Four (4) Tugs (2 fire fighting) Six (6) Fire Tenders Six (6) pickups, 2 maxis (37 person capacity) Medical Services Four (4) First Aid Stations Two (2) On Call Doctors Four (4) Nurses Two (2) Paramedics Forty (40) First Aiders

Report on Incident Failure of loading arm equipment 3 persons died instantly at SP I 12 critically injured, 5 died while awaiting treatment Severe traffic congestion and accidents Community not fully evacuated

Assessment Communication: Emergency Response (Medical): no clear warning communicated to residents visitors did not know how to respond to sirens/alarms Emergency Response (Medical): inadequate personal protective equipment response time for medical attention inadequate inadequate specialized medical personnel inadequate triage equipment and facilities

Assessment Emergency Response (Protective Services): Evacuation Inadequate training & equipment to handle industrial emergencies Evacuation Community not evacuated in a timely manner inadequate resources & training to evacuate community Traffic Management Congestion at BC Roundabout affecting emergency personnel required on the Estate, as well as persons evacuated

Health Facility Response Comparison 10 mins 25 mins 55 mins 35 mins

Recommendations Communication: installation of sirens and public address warning system for community Develop & testing of emergency plan with Community involvement Public education for communities on emergency response & evacuation procedures Need for Off-site Emergency Command Centre A Twenty Four (24) Hour Medical Facility Providing General & Emergency Care Services to Victims of Industrial Accidents

Recommendations Fire station built and fully equipped to handle industrial incidents Highly specialized HAZMAT Team available to handle industrial incidents Adequate personnel protective equipment for employees Preventive maintenance plan for equipment Safety Orientation for visitors to Estate and Port Restrict access to Estate

Recommendations Emergency traffic management/control plan (removal of all traffic flow impediments BC Roundabout and island on SMR) Periodic testing of Emergency Plans for Estate and individual Plant